Metropolitan Avenue/Lorimer Street station explained

Metropolitan Avenue/
 Lorimer Street
Type:complex
Address:Metropolitan Avenue between Lorimer Street & Union Avenue
Brooklyn, NY
Borough:Brooklyn
Locale:Williamsburg
Coordinates:40.7128°N -73.9515°W
Accessible:yes
Acc Note:Transfer passageway between IND Crosstown Line platforms and BMT Canarsie Line platforms is not accessible; use OMNY farecard readers for free accessible transfer
Division:BMT/IND[1]
Line:BMT Canarsie Line
IND Crosstown Line
Service:Lorimer-Metropolitan
Connection: NYCT Bus:
Levels:2

The Metropolitan Avenue/Lorimer Street station is an underground New York City Subway station complex shared by the BMT Canarsie Line and the IND Crosstown Line. Located in the Williamsburg neighborhood of Brooklyn, the complex is served by the G and L trains at all times.

The BMT Canarsie Line platforms, which are named Lorimer Street, are located above the IND Crosstown Line platforms, which are named Metropolitan Avenue. The Canarsie Line station opened in 1924, and the Crosstown Line station opened in 1937. Free transfers between the stations started in 1948.

Station layout

GroundStreet levelEntrances/exits
Basement 1MezzanineFare control, station agent, MetroCard and OMNY machines
Elevator to train at northwest corner of Lorimer Street and Metropolitan Avenue.
Basement 2Side platform
Westbound← toward
Eastbound toward
Side platform
MezzanineFare control, station agent, MetroCard and OMNY machines, connection between platforms
Elevator to train at southeast corner of Union Avenue and Metropolitan Avenue.
Basement 3Side platform
Northbound← toward
Southbound toward
Side platform
The L-shaped passageway, located above the Crosstown Line at its northern end and below the Canarsie Line at its western end, also serves as the mezzanine for the Crosstown Line's lower level. When viewed from the Crosstown Line mezzanine, the passageway splits up as the right half leads to a ramp for Canarsie-bound trains while the left half leads to a crossunder to Eighth Avenue-bound trains.

Originally, passengers who wished to transfer between the Canarsie and Crosstown lines had to pay a separate fare, because the Brooklyn–Manhattan Transit Corporation (operator of the Canarsie Line) and the Independent Subway System (the Crosstown Line's operator) were competing companies. On July 1, 1948, eight years after the three operators of New York's subways were unified into a single entity, the transfer passageway was reconfigured to be inside fare control, thus permitting free transfers between lines.[2] [3]

In 2019, the MTA announced that the station would become ADA-accessible as part of the agency's 2020–2024 Capital Program.[4] A contract for five elevators at the station (three for the Canarsie Line platforms and two for the Crosstown Line platforms) was awarded in December 2020.[5] A street-to-mezzanine elevator for the Crosstown Line platforms was added to the contract, resulting in a total of six elevators. All elevators opened on April 1, 2024. The transfer passageway between the Canarsie and Crosstown lines is not accessible, so an out-of-system transfer for disabled riders is provided using OMNY farecard readers. The passageway to the Manhattan-bound Canarsie Line platform has stairs, and the passageway to the Canarsie-bound platform has a ramp that is not accessible.[6]

A precinct of the New York City Transit Police is also located on the Crosstown Line mezzanine.

Artwork

The artwork in the transfer passageway and the Crosstown Line mezzanine is called Signs of Life,[7] designed by Jackie Chang in 2000.[8] [9] Signs of Life is made of ceramic tiles of glass and consists of numerous juxtaposed words and icons.[8] The words in the artwork are compound words that have been taken apart, such as "useless" or "mankind".[7] In designing the artwork, Chang intended for the pieces to be "challenging" and cryptic.[8] Signs of Life originally consisted of six mosaics, but two additional mosaics were added when the station's elevators opened in 2024.[6]

The Lorimer Street station's fare control area also contains the artwork Personal Choice #5, designed by Chloë Bass and completed in 2024. The artwork is split up into three sections and depicts human connections and touch. Each portion of Personal Choice #5 is accompanied by a text caption, which is overlaid atop the artwork.[6]

Exits

The main entrances at the corner of Metropolitan and Union Avenues lead to the transfer corridor between the lines.[10] The high entry-exit turnstiles in the transfer corridor would be replaced with waist-high "low turnstiles" to accommodate increased passenger flow.

Each platform has a second set of entrances. The BMT platforms have a second set to the eastern corners of Lorimer Street and Metropolitan Avenue at their east ends. The IND platforms have one stair leading to the northwestern corner of Union Avenue and Hope Street and another leading to the northeastern corner of Union Avenue and Powers Street. The exits to Powers and Hope Streets were previously closed in 2000 due to safety concerns, blocked by metal street grates, and used as emergency exits.[11] They were reopened on February 28, 2019 to accommodate the increased volume of passengers transferring between the Crosstown and Canarsie Line stations due to the 14th Street Tunnel shutdown.[12] Originally, only one of these exits was planned to be reopened.[13]

Despite the IND station's name on tiling, there is no longer an open exit to Grand Street. A passage beyond the Hope and Powers Streets exits leads to two more exits that led to both northern corners of Grand Street and Union Avenue.[14] [15] These exits were also closed in 2000 due to safety concerns. While the exit to the northeastern corner is also blocked by a metal sheet grate, the exit to the northwestern corner has been sealed and is inaccessible from street level.[16] [17] The exits to Grand Street were open until the section of the mezzanine that had the exits to Hope Street and Powers Street was closed; this is corroborated by photos of this portion of the mezzanine during its closure, which had signage directing to Grand Street intact, as well as MTA documents outlining the closure of the whole area.[18]

The BMT station previously had two closed exits; they led to the western corners of Lorimer Street and Metropolitan Avenue. They were also closed in 2000 and were repurposed into emergency exits. As part of the ADA accessibility improvements, the exit to the southwestern corner was reopened, while the exit to the northwestern corner was demolished to make room for a street elevator at that corner.

The transfer mezzanine also features one closed staircase to the southeastern corner of Metropolitan Avenue and Union Avenue. The staircase was also closed in 2000, but has been completely sealed from both the street level and the mezzanine level.

BMT Canarsie Line platforms

Lorimer Street
Division:BMT
Line:BMT Canarsie Line
Service:Canarsie
Platforms:2 side platforms
Tracks:2
Structure:Underground
Accessible:yes
Acc Note:Use OMNY farecard readers to transfer to IND Crosstown Line platforms
Hide Traffic:yes

The Lorimer Street station (announced as Metropolitan Avenue-Lorimer Street station) on the BMT Canarsie Line has two tracks and two side platforms. It opened on June 30, 1924, as part of the initial segment of the underground Canarsie Line, a product of the Dual Contracts, stretching from Sixth Avenue in Manhattan to Montrose Avenue.[19] [20] The L stops at the station at all times. The station is between Bedford Avenue to the west and Graham Avenue to the east.

The Lorimer Street entry point has a mezzanine above the station. There is also another entrance at Union Avenue that leads directly to the Manhattan-bound platform. The transfer to the Crosstown Line is toward the Union Avenue (western; railroad northern) end of the station, where passageways descend from each platform to the Union Avenue mezzanine.

Image gallery

IND Crosstown Line platforms

Metropolitan Avenue
Former:Metropolitan Avenue–Grand Street
Division:IND
Line:IND Crosstown Line
Service:Crosstown
Platforms:2 side platforms
Tracks:2
Structure:Underground
Accessible:yes
Acc Note:Use OMNY farecard readers to transfer to BMT Canarsie Line platforms
Hide Traffic:yes

The Metropolitan Avenue station (also announced as Metropolitan Avenue-Lorimer Street station) on the IND Crosstown Line opened on July 1, 1937 as part of the extension of the Crosstown Line from Nassau Avenue to Hoyt-Schermerhorn Streets.[21] The station also has two tracks and two side platforms.[22] The G stops at the station at all times. The station is between Nassau Avenue to the north and Broadway to the south.

The station has green tiles. The tiles were part of a color-coded tile system used throughout the IND.[23] The tile colors were designed to facilitate navigation for travelers going away from Lower Manhattan. Because the Crosstown Line does not merge into a line that enters Manhattan at either end, all stations on the line had green tiles.[24] [25] Station tile signage retains the original name of the station: Metropolitan Avenue–Grand Street. Directional tile captions mimicking the style of original IND captions indicate "To Street and Transfer;" the tile captions replaced original captions pointing to Metropolitan Avenue at the north end and Grand Street at the south end.[26] Two staircases from the north end of either platform lead to the mezzanine and transfer passageway to the BMT Canarsie Line.[27]

The mezzanine is full-length, but has been reduced in size. A central portion was closed in the late 1990s and is now occupied by a police facility, employee space, and offices.[28] The south portion was also previously closed and used as storage space, but was reopened on February 28, 2019 in preparation for the 14th Street Tunnel shutdown in April 2019. A previously removed staircase between the southbound platform and the mezzanine was also built.[29]

Image gallery

External links

Google Maps Street View:

Notes and References

  1. News: . Transfer Points Under Higher Fare: Board of Transportation Lists Stations and Intersections for Combined Rides . June 30, 1948 . 19 . May 5, 2010.
  2. News: . Transfer Points Under Higher Fare: Board of Transportation Lists Stations and Intersections for Combined Rides . June 30, 1948 . 19 . May 5, 2010.
  3. Book: Sparberg, Andrew J.. From a Nickel to a Token: The Journey from Board of Transportation to MTA. October 1, 2014. Fordham University Press. 9780823261901. en.
  4. Web site: Press Release - MTA Headquarters - MTA Announces 20 Additional Subway Stations to Receive Accessibility Improvements Under Proposed 2020-2024 Capital Plan. December 19, 2019. MTA. December 25, 2019. March 22, 2020. https://web.archive.org/web/20200322233116/http://www.mta.info/press-release/mta-headquarters/mta-announces-20-additional-subway-stations-receive-accessibility. dead.
  5. MTA Announces Accessibility Projects at Eight Stations Throughout the Five Boroughs . Metropolitan Transportation Authority . 2020-12-16 . 2021-05-26 . May 26, 2021 . https://web.archive.org/web/20210526185744/https://www.mta.info/press-release/nyc-transit/mta-announces-accessibility-projects-eight-stations-throughout-five . dead .
  6. Web site: MTA Celebrates Accessibility Upgrades at Metropolitan Av-Lorimer St G and L Stations . MTA . April 1, 2024 . April 2, 2024.
  7. Web site: Michalos . Michelle . Art in Your Pocket: Artist Reed Seifer's optimism MetroCard . THIRTEEN - New York Public Media . August 28, 2013 . April 2, 2024.
  8. Web site: Signs of Life . MTA . April 2, 2024.
  9. Web site: Top ten: MTA subway art . Time Out New York . April 12, 2012 . April 2, 2024.
  10. Web site: MTA Neighborhood Maps: Williamsburg & Bedford Stuyvesant. mta.info. Metropolitan Transportation Authority. July 20, 2016. 2015.
  11. Web site: MTA New York City Transit Canarsie Tunnel Project Supplemental Environmental Assessment and Section 4(f) Review: Final Report. New York City Transit Authority. New York City Transit Authority. July 2018. mta.info. Metropolitan Transportation Authority. 2018-07-27. 15–16.
  12. Web site: MTA Reopens 2 Station Entrances at Metropolitan Av/ Lorimer St Station . Greenpoint Post . Hanrahan . Laura . March 1, 2019 . March 1, 2019 . dead . https://web.archive.org/web/20190301015259/https://greenpointpost.com/mta-reopens-2-station-entrances-at-metropolitan-av-lorimer-st-station . March 1, 2019.
  13. News: First Look: DOT, MTA present initial plans for L train shutdown. Kabak. Benjamin. December 13, 2017. Second Ave. Sagas. December 16, 2017. en-US.
  14. Web site: Closed subway entrances. WNYC (AM). July 4, 2016. October 31, 2015.
  15. Web site: 2012-11-10 22.15.52. November 10, 2012.
  16. News: Hogan. Gwynne. Open Shuttered Subway Entrances Before L Train Shutdown, Advocates Urge. July 5, 2016. DNAinfo.com. February 29, 2016. Williamsburg, Brooklyn. dead. https://web.archive.org/web/20160821141247/https://www.dnainfo.com/new-york/20160229/williamsburg/open-shuttered-subway-entrances-before-l-train-shutdown-advocates-urge. August 21, 2016. mdy-all.
  17. News: Harshbarger. Rebecca. NYC subway station entrances closed despite ridership spike: over one in four. July 5, 2016. AM New York. November 1, 2015.
  18. News: Inside Metropolitan Avenue's shuttered G passageway. Kabak. Benjamin. January 24, 2013. Second Ave. Sagas. March 30, 2019. en-US.
  19. News: Subway Tunnel Through. August 8, 1919. The New York Times. February 28, 2010.
  20. News: Celebrate Opening of Subway Link. July 1, 1924. The New York Times. February 13, 2010.
  21. News: New Crosstown Subway Line Is Opened. December 24, 2015. Brooklyn Daily Eagle. July 1, 1937.
  22. Web site: Review of the G Line: Appendices. Metropolitan Transportation Authority. October 28, 2015. July 10, 2013.
  23. News: August 22, 1932 . Tile Colors a Guide in the New Subway; Decoration Scheme Changes at Each Express Stop to Tell Riders Where They Are . en-US . The New York Times . live . July 1, 2022 . https://web.archive.org/web/20220701184626/https://www.nytimes.com/1932/08/22/archives/tile-colors-a-guide-in-the-new-subway-decoration-scheme-changes-at.html . July 1, 2022 . 0362-4331.
  24. Web site: Carlson . Jen . February 18, 2016 . Map: These Color Tiles In The Subway System Used To Mean Something . live . https://web.archive.org/web/20230510153052/https://gothamist.com/arts-entertainment/map-these-color-tiles-in-the-subway-system-used-to-mean-something . May 10, 2023 . May 10, 2023 . Gothamist.
  25. Web site: Gleason . Will . February 18, 2016 . The hidden meaning behind the New York subway's colored tiles . live . https://web.archive.org/web/20230510153052/https://www.timeout.com/newyork/blog/the-hidden-meaning-behind-the-new-york-subways-colored-tiles-021816 . May 10, 2023 . May 10, 2023 . Time Out New York.
  26. Web site: Showing Image 56257.
  27. Web site: Review of the G Line . . . August 2, 2015 . July 10, 2013.
  28. News: Kabak. Benjamin. Inside Metropolitan Avenue's shuttered G passageway. July 5, 2016. Second Avenue Sagas. January 24, 2013.
  29. Web site: Station Capacity Enhancements at Metropolitan Avenue. December 31, 2017. web.mta.info. Metropolitan Transportation Authority. February 18, 2018.