Lom Pangar Dam | |
Location Map: | Cameroon |
Coordinates: | 5.3714°N 13.5124°W |
Country: | Cameroon |
Location: | Bertoua |
Purpose: | Power, river regulation |
Status: | UC |
Construction Began: | 2012 |
Opening: | 2017 |
Cost: | US$195.69 million |
Dam Type: | Embankment, center section gravity dam |
Dam Crosses: | Lom River |
Dam Length: | 1278m (4,193feet)[1] |
Dam Height: | 46m (151feet) |
Dam Width Crest: | 7m (23feet) |
Res Capacity Total: | 6000e6m3 |
Res Surface: | 540km2[2] |
Plant Turbines: | 4 x 7.5MW Francis-type |
Plant Capacity: | 30MW[3] |
The Lom Pangar Dam is an embankment dam with a center gravity dam section currently under construction on the Lom River about north of Bertoua in the East Region of Cameroon. It is located about downstream of the Lom River's confluence with the Pangar River and about upstream of where the Lom joins the Sanaga River. The dam's purpose is to produce hydroelectric power and regulate water flows along the Sanaga River. It is potentially part of a larger dam cascade on the Sanaga.[4]
The African Development Bank issued a US$71.1 million loan for the project in November 2011.[5] The World Bank also approved a US$132 million loan in March 2012, and the President of Cameroon, Paul Biya, laid the foundation stone for the dam on 3 August 2012.[6] The European Investment Bank approved a US$39 million loan in October of the same year.[7] China International Water & Electric Corporation is constructing the dam and power plant. A coffer dam to divert the river around the dam foundation was completed in July 2013.[8] The project was completed in 2017.[9]