Llandudno Junction railway station explained

Llandudno Junction
Native Name:Welsh: Cyffordd Llandudno
Symbol Location:gb
Symbol:rail
Borough:Llandudno Junction, Conwy County Borough
Country:Wales
Coordinates:53.284°N -3.809°W
Grid Name:Grid reference
Manager:Transport for Wales Rail
Platforms:4
Code:LLJ
Classification:DfT category C2
Original:Chester and Holyhead Railway
Pregroup:London and North Western Railway
Postgroup:London Midland and Scottish Railway
Events:First station opened
Years1:16 June 1863
Events1:Conwy Valley Line opened
Years2:1 October 1897
Events2:Present station opened
Footnotes:Passenger statistics from the Office of Rail and Road

Llandudno Junction (Welsh: Cyffordd Llandudno) is a station serving the village of Llandudno Junction on the North Wales Main Line between and . The station is managed by Transport for Wales Rail, although Avanti West Coast services also stop there. It is a junction for trains to and the Conwy Valley line.

History

The original station (located to the west of the current station) was opened on 1 October 1858[1] and served the branch line to Llandudno. Built by the St. George's Harbour and Railway Company in 1858, this branch line heads north through Deganwy before terminating in the town. Before the completion of the junction station, the branch line trains from Llandudno ran through to Conwy.

This was followed by the opening of a second branch line in 1863 – the Conwy Valley Line – which headed south and was built by the Conway and Llanrwst Railway, and became part of the LNWR in 1867. It follows the valley of the River Conwy to Llanrwst (where it originally terminated) and Betws-y-Coed (a later terminus in 1869), then follows the Lledr Valley and a two mile long tunnel to terminate at Blaenau Ffestiniog, where passengers can join the Ffestiniog Railway.

Initially the Conwy Valley line ran into a separate platform on the south side of the station, and a refreshment room was built in 1864. But more space was needed to cope with both main line and branch-line traffic, and on 1 October 1897 the present station was opened on a much larger site, the two island platforms offering six through lines with two bays at each end (a total of four through platforms and four bay platforms). The opening of the new station allowed the demolition of the former station, but also entailed a diverting of the Conwy Valley branch, which now joined the main line some half a mile further east. The old formation was used to store locomotives.

Three of the platforms on the southern side (both bays and the down loop) were taken out of use in 1968 when the easternmost of the two signal boxes was closed and the track layout altered. In 1983 the branch junction was again moved slightly eastwards to allow a new freight terminal (now disused) to be built to replace the original goods yard and another at nearby Colwyn Bay that had been closed before the start of the A55 road widening scheme the previous year.The station was also remodelled once more and resignalled at this time, and in 1985 a new power signal box was commissioned at the western end,[2] which now controls the station area and junctions along with the main line between Colwyn Bay and Conwy and the northern end of the Conwy Valley branch (using the electric token system). The token machine for the branch is located at the station rather than in the signal box for operational convenience, allowing drivers to collect or return their token (with the cooperation of the signaller) whilst station work is undertaken, rather than having to make an additional stop at the box to make the exchange.

The station was also formerly the site of Llandudno Junction TMD, a motive power depot which closed in 1966. It was given the code 7A by the London, Midland and Scottish Railway, which was altered to 6G by British Railways in March 1952.[3] This had been located just south east of the station, and its site, together with the former adjoining goods yard, now have been redeveloped, but the new flyover road across the site bears the name 6G.

Layout

The station currently has four operational platforms:

A bus shelter in the station car park is numbered as platform 5, and is used for local bus services as well as rail replacement services when the railway is closed for engineering work.

Facilities

The station is staffed throughout the day, with the ticket office on platforms 1 and 3. Self-service ticket machines are also available and for collecting pre-paid/advance purchase tickets. Other facilities on offer (all on platforms 1–3) include a waiting room, toilets, a cafe and public telephone. Platform 4 has a canopy and customer help point only. Train running information is provided by poster boards, digital information screens and automated announcements. Step-free access is available from the station entrance to all platforms via lifts integrated into the main footbridge that links them.[4]

Services

The station is served by two train operating companies:

Transport for Wales Rail

Transport for Wales Rail operates the following routes:[5]

Avanti West Coast

Avanti West Coast operates four services each way to, plus a northbound only train between London and Bangor. They also operate two services per day each way between Crewe and Holyhead, plus two that run northbound only between Crewe and Bangor; one of these extends to Holyhead. One northbound service from Crewe to Holyhead starts from .[6]

On Saturdays, there are three southbound services per day to London Euston, as well as a daily southbound service which runs between Crewe and Holyhead, while northbound, there are two trains per day to Holyhead from London Euston and two trains to Holyhead from Crewe, plus another northbound service from Crewe which terminates here.

On Sundays, are also three trains each way to London Euston, with one northbound train from Crewe to Holyhead.

Further reading

External links

Notes and References

  1. Book: Butt, R.V.J. . The Directory of Railway Stations . 1995 . Patrick Stephens Ltd . Yeovil . 1-85260-508-1 . R508 . 145 .
  2. http://www.6g.nwrail.org.uk/signaling.htm Signalling Around The Junction
  3. Book: Walford, John . A Detailed History of British Railways Standard Steam Locomotives - Volume Five: The End of an Era . 2012 . . Maidenhead . 978-0901115-973 . 17 .
  4. http://www.nationalrail.co.uk/stations/LLJ/details.html Llandudno Junction station facilities
  5. Web site: Timetables . Transport for Wales . 10 December 2023 . 31 December 2023 .
  6. Web site: Our latest timetables and ticket info . Avanti West Coast . 10 December 2023 . 31 December 2023 .