This is a list of tallest buildings in Winnipeg, the capital and largest city in Manitoba, Canada. Winnipeg has 8 buildings that stand taller than 100m (300feet).
As of 2011, Winnipeg had 144 completed high-rise buildings, with 4 more under construction, 3 approved for construction, and 2 proposed.
Winnipeg's history of towers began with the Union Bank Tower (1904), the National Bank Building (1911), and the Hotel Fort Garry in 1913. Buildings in the city remained relatively short in the city until the late 1960s when the city experienced its first skyscraper boom, with the construction of the Richardson Building, Holiday Towers, and Grain Exchange Tower, all being constructed during this time. From 1980 to 1990, Winnipeg witnessed a major expansion of skyscraper and high-rise construction. Many of the city's office towers were completed during this period, such as Canwest Place and the Evergreen Place towers. A 20-year lull in building construction came after this expansion, though Winnipeg has experienced a much smaller second building expansion beginning in the late 2000s and continuing into the present.[1]
The most recent tall building to be constructed in Winnipeg is 300 Main, which opened in 2023. The Canadian Museum for Human Rights, which opened in 2014, was the 2nd most recent at 100abbr=onNaNabbr=on tall. In March 2021, 300 Main became Winnipeg's tallest building during construction, surpassing 201 Portage.
This list ranks buildings in Winnipeg that stand at least 60m (200feet) tall, based on CTBUH height measurement standards. This includes spires and architectural details but does not include antenna masts.
Building | Height | Floors | Type | Completed | Image | ||
---|---|---|---|---|---|---|---|
1 | 300 Main[2] | 141.7m (464.9feet) | 42 | Mixed use | 2022 | ||
2 | 201 Portage[3] | 128m (420feet) | 33 | Office | 1990 | ||
3 | Richardson Building[4] | 124.1m (407.2feet) | 34 | Office | 1969 | ||
4 | 360 Main[5] | 117m (384feet) | 31 | Office | 1979 | ||
5 | Manitoba Hydro Place[6] | 112.5m (369.1feet) | 22 | Office | 2009 | ||
6 | 55 Nassau[7] | 109m (358feet) | 38 | Residential | 1970 | ||
7 | 100m (300feet) | 12 | Government | 2013 | |||
8 | Bell MTS Building II (MTS Place Main)[8] [9] | 96m (315feet) | 24 | Office | 1984 | ||
9 | Fort Garry Place III[10] | 94m (308feet) | 31 | Residential | 1990 | ||
10 | One Evergreen Place[11] | 89m (292feet) | 29 | Residential | 1979 | ||
11 | 225 Carlton (Tower 2 of True North Square)[12] | 86.9m (285.1feet) | 25 | Residential | 2019 | ||
12 | Heritage Landing[13] | 86m (282feet) | 25 | Residential | 2016 | ||
13 | Eleven Evergreen Place[14] | 85m (279feet) | 26 | Residential | 1984 | ||
=14 | One Canada Centre[15] | 83m (272feet) | 18 | Office | 1987 | ||
=14 | 390 on the River[16] | 83m (272feet) | 24 | Residential | 2018 | ||
16 | Radisson Winnipeg[17] | 82.9m (272feet) | 29 | Hotel | 1969 | ||
17 | Seven Evergreen Place[18] | 82m (269feet) | 26 | Mixed use | 1982 | ||
18 | Manitoba Legislative Building[19] | 78.6m (257.9feet) | Government | 1920 | |||
19 | Scotiabank Tower (Tower 1 of True North Square)[20] | 77.8m (255.2feet) | 25 | Office | 2018 | ||
20 | Holiday Towers South[21] | 77m (253feet) | 27 | Residential | 1973 | ||
21 | Chateau 100[22] | 76m (249feet) | 26 | Residential | 1970 | ||
22 | Fort Garry Place I[23] | 76m (249feet) | 21 | Residential | 1990 | ||
23 | Fort Garry Place II[24] | 75m (246feet) | 21 | Residential | 1990 | ||
24 | Canadian Grain Commission[25] | 74m (243feet) | 16 | Office | 1972 | ||
=25 | 444 St. Mary[26] | 73m (240feet) | 16 | Office | 1977 | ||
=25 | Le Chateau York[27] | 73m (240feet) | 22 | Residential | 1974 | ||
27 | Holiday Towers North[28] | 73m (240feet) | 25 | Residential | 1970 | ||
28 | ALT Hotel[29] [30] | 72.5m (237.9feet) | 20 | Hotel | 2015 | ||
29 | Place Louis Riel[31] [32] | 70m (230feet) | 22 | Hotel/commercial | 1970 | ||
30 | One Lakeview Square (155 Carlton St)[33] | 70m (230feet) | 19 | Office | 1974 | ||
31 | Glasshouse Skylofts[34] [35] [36] | 70m (230feet) | 21 | Residential | 2016 | ||
32 | 220 Portage Avenue (Royal Bank Building)[37] | 68m (223feet) | 17 | Office | 1966 |
This is a list of projects over 35m (115feet) that are under construction, approved, on-hold and proposed in the city of Winnipeg.
Building | Height | Floors | Type | Location | Year | Status |
---|---|---|---|---|---|---|
Sutton Place Hotel (Tower 3 of True North Square)[38] | 27 | Hotel | 220 Carlton | 2025 | Under Construction | |
Sutton Place Residences (Tower 4 of True North Square) | ~60m (200feet) | 17 | Residential | 236 Carlton | 2025 | Under Construction |
The ARC (2525 Pembina Hwy)[39] [40] | 54 m | 16 | Residential (student housing) | 2021 August | Under Construction | |
The Halo, Tower 1 (Private Pension Partners)[41] [42] | 48.8 m | 13 | Residential | 3021 Pembina | 2023 | In development |
The Halo, Tower 2 (Private Pension Partners) | Unknown | 15 | Residential | 3021 Pembina | 2023 | In development |
Wawanesa Tower (Tower 5 of True North Square)[43] | 93 m | 23 | Office | 2023 | Under Construction | |
65 Kikbridge Drive[44] | 36 m | 11 | Residential | 65 Kirkbridge Drive | 2023 | Proposed |
Onyx II[45] | Unknown | 15 | Residential | 1792 Pembina | 2024 | Proposed |
634 Portage Avenue[46] | ~66 m | 20 | Residential | 634 Portage Avenue | 2025 | In development |
2025 Corydon[47] | 43 m | 13 | Residential | 2025 Corydon | 2022 | Under Construction |
127 Bannatyne[48] | ~35 m | 11 | Residential | 127 Bannatyne | 2022 | Proposed |
308 Colony St[49] | 21 | Residential | 308 Colony St | 2023 | Proposed | |
Building | Height | Floors | Type | Image | ||
---|---|---|---|---|---|---|
1900–1904 | Merchant's Bank Building[50] | Unknown | 7 | Office | ||
1904–1909 | 48m (157feet) | 10 | Office | |||
1909–1913 | Childs / McArthur Building | 48.62m (159.51feet) [51] | 12 | Office | ||
1913–1920 | 58.5m (191.9feet) [52] | 14 | Hotel | |||
1920–1969 | 79m (259feet) | 5 | Government | |||
1969–1990 | 124m (407feet) | 34 | Office | |||
1990–2022 | 128m (420feet) | 33 | Office | |||
2022–present | 141.7m (464.9feet) | 42 | Mixed use |