Cambridge is a city in Middlesex County in eastern Massachusetts, United States. Located on the northern shore of the Charles River, it is also a major suburb of Boston, the state capitol and regional financial center. It has a population of 118,403 (2020) and a growing number of high-rise buildings.
This list ranks Cambridge buildings that stand at least 200 feet (61 m) tall, based on height measurement criteria established by the Council on Tall Buildings and Urban Habitat (CTBUH) and Emporis.com. This includes spires and architectural details but does not include antenna masts, roof top signs, flag poles or other functional-technical equipment. An equals sign (=) following a rank indicates the same height between two or more buildings. The "Year" column indicates the year in which a building was completed. Freestanding towers, guyed masts and other not habitable structures are included for comparison purposes; however, they are not ranked.
Rank | Name | Image | Height ft (m) | Floors | Year | Coordinates | Neighborhood | Notes | |
---|---|---|---|---|---|---|---|---|---|
1 | MIT SoMa Building 4 | 315feet | 29 | 2020 | Area 2/MIT | Tallest building in Cambridge since April 2, 2019. 290 Main St.https://www.turnerconstruction.com/projects/mitimco-mit-south-of-main-soma-site-4-building | [1] | ||
2= | Green Building | 295feet | 21 | 1964 | Area 2/MIT | Tallest building in Cambridge from 1964 until 2019. Height to tip - 312feet with radar dome. | [2] [3] [4] [5] | ||
2= | 165 Main St. | 295feet | 25 | 2022 | East Cambridge | [6] [7] | |||
4 | 145 Broadway | 294feet | 19 | 2018 | East Cambridge | Headquarters of Akamai Technologieshttps://www.turnerconstruction.com/projects/boston-properties-145-broadwayhttps://www.turnerconstruction.com/projects/akamai-headquarters-fitout-at-145-broadway | [8] | ||
5 | Boston Marriott Cambridge | 290feet | 26 | 1988 | Area 2/MIT | Tallest building built in the 1980s. | [9] | ||
- | WJIB radio tower | 285feet | N/A | 1948 | Neighborhood Nine | Mast radiator for WJIB and supports its FM translator, W267CE. | [10] | ||
6 | Proto Kendall Square | 284feet | 22 | 2018 | Area 2/MIT | Also known as Ames Street Residences | [11] | ||
7 | 40 Thorndike Street | 282feet | 22 | 1974 | East Cambridge | Formerly the Sullivan Courthouse. Tallest building built in the 1970s. Due to changes in building ownership in the 2020s the overall completed height of the building has been reduced by one or more floors as part of a building renovation.https://boston.curbed.com/2014/3/19/10130520/sullivan-courthouse-developer-on-chopping-the-height | [12] | ||
8 | MIT SoMa Building 5 | 280feet | 18 | 2020 | Houses offices and the MIT Museum. | Area 2/MIT | 314 Main St.https://www.turnerconstruction.com/projects/mitimco-mit-south-of-main-soma-site-5-building | [13] [14] | |
9 | Elevate | 277feet | 22 | 2008 | East Cambridge | Known as Avalon North Point. | [15] | ||
10 | 101 Main St. | 270feet | 18 | 1983 | East Cambridge | [16] [17] | |||
11= | Rindge Towers I | 269feet(est.) | 22 | 1970 | North Cambridge | [18] | |||
11= | Rindge Towers II | 269feet(est.) | 22 | 1970 | North Cambridge | [19] | |||
11= | Rindge Towers III | 269feet(est.) | 22 | 1970 | North Cambridge | [20] | |||
14 | 75 Ames Street (Stanley Building) | 263feet | 15 | 2014 | Area 2/MIT | [21] | |||
15 | Park 151 | 252 ft (77 m) | 20 | 2022 | East Cambridge | Height to tip - 270feet | [22] [23] | ||
16= | Watermark Kendall West | 248feet(est.) | 23 | 2006 | Area 2/MIT | [24] [25] [26] | |||
16= | Tang Residence Hall | 248feet | 24 | 1972 | Area 2/MIT | [27] [28] | |||
18 | 1010 Memorial Drive | 240feet | 20 | 1965 | West Cambridge | [29] [30] | |||
19 | Twenty/20 | 237feet | 20 | 2015 | East Cambridge | [31] | |||
20= | Museum Towers 1 | 234feet | 24 | 1998 | East Cambridge | [32] [33] | |||
20= | Museum Towers 2 | 234feet | 24 | 1998 | East Cambridge | Also called Regatta Riverview Residences. | [34] [35] | ||
22 | One Broadway | 230feet | 17 | 1970 | East Cambridge | [36] [37] | |||
23= | Peabody Terrace Apartments I | 226.85feet | 22 | 1964 | Riverside | [38] [39] | |||
23= | Peabody Terrace Apartments II | 226.85feet | 22 | 1964 | Riverside | [40] | |||
23= | Peabody Terrace Apartments III | 226.85feet | 22 | 1964 | Riverside | [41] | |||
26 | 808 Memorial Drive | 224feet | 20 | 1975 | Cambridgeport | [42] [43] | |||
27= | 929 Mass Apartments | 220.32feet | 18 | 1976 | Mid-Cambridge | [44] | |||
27= | Mather House | 220.32feet (est.) | 18 | 1970 | Riverside | [45] | |||
29 | William James Hall | 215feet (est.) | 15 | 1963 | Baldwin | [46] | |||
30 | 1 Main St. | 210feet | 14 | 1986 | East Cambridge | [47] [48] | |||
31 | One Memorial Drive | 208feet (est.) | 17 | 1986 | Area 2/MIT | [49] | |||
32 | Market Central | 207feet | 19 | 2020 | The Port | Formerly known as Mass+Main. | [50] | ||
33 | 100 (100 Landsdowne St) | 205feet | 18 | 2005 | Cambridgeport | [51] | |||
34 | Frank J. Manning Apartments | 204feet | 19 | 1976 | Cambridgeport | [52] | |||
Name | Image | Height ft (m) | Floors | Year | Coordinates | Neighborhood | Notes | ||
---|---|---|---|---|---|---|---|---|---|
MXD Residential Building South | 400feet | 37 | 2021 | East Cambridge | Site prep began in early 2023. Height does not include mechanical penthouse. | [53] | |||
MIT SoMa Building 3 | 238.5feet | 14 | 2018 | Area 2/MIT | 238 Main St.https://www.turnerconstruction.com/projects/mitimco-mit-south-of-main-soma-site-3-lab-building | [54] | |||
325 Main St. | 288.5feet | 17 | 2020 | Area 2/MIT | Part of MXD II. Google tower.https://www.turnerconstruction.com/projects/boston-properties-325-main-street | [55] | |||
Parcel E/F | 250feet | 21 | 2020 | East Cambridge | https://www.cambridgema.gov/-/media/Files/CDD/ZoningDevel/SpecialPermits/sp179/sp179_ParcelI_Residential_20180316_1.pdf | ||||
Parcel G | 220feet | 14 | 2020 | East Cambridge | https://www.cambridgema.gov/~/media/Files/CDD/ZoningDevel/SpecialPermits/sp179/sp179_parcelG_DR1_20171107.pdf?la=en | ||||
MIT SoMa Building 2 | 240feet | 14 | 2021 | Area 2/MIT | [56] [57] |
This section lists high-rise buildings that are approved or proposed in Cambridge and planned to be at least 200feet tall, but are not yet under construction. In 2015, Leland Cheung of the Cambridge City Council contemplated the maximum rezoning of the area in terms of building heights, and asked if buildings of up to 1000feet could be considered in the future. A height of 1,000 feet would be over 200 feet taller than the tallest building in the metro-Boston area: the John Hancock Tower.[58] [59]
Name | Height ft (m) | Floors | Year | Coordinates | Neighborhood | Status | Notes | ||
---|---|---|---|---|---|---|---|---|---|
Volpe Redevelopment MIT | 500feet | 50 | 2022 | East Cambridge | Proposed | Would be the tallest building in Massachusetts outside of Boston once completed. | [60] | ||
585 Third St | 292.5feet | 16 | 2021 | East Cambridge | Proposed | [61] |