List of power stations in South Africa explained

South Africa produced around 245,000 GWh of electricity in 2021.[1] [2] Most of this electricity is produced using coal and is consumed domestically. In 2022, 12,300 GWh were exported to Eswatini, Botswana, Mozambique, Lesotho, Namibia, Zambia, Zimbabwe and other countries participating in the Southern African Power Pool.[3] In 2022, South Africa imported 10,800 GWh from the Cahora Bassa Hydroelectric Power Station in Mozambique via the 1,920 MW Cahora Bassa (HDVC) Power Transmission System.[4] [5]

Most power stations in South Africa are owned and operated by the state owned enterprise, Eskom. These plants account for 80% of all the electricity produced in South Africa and 45% of all electricity produced on the African continent.[6] In terms of share of GDP in 2012, South Africa was the 4th largest investor in renewable power in the world after Uruguay, Mauritius and Costa Rica.[7]

The following is a list of electricity generating facilities within South Africa that are larger than 1 MW capacity. It only contains currently operational facilities and facilities under construction. The net power output in megawatts is listed, i.e. the maximum power the power station can deliver to the grid.

For notable facilities that are not operating or have been decommissioned see List of decommissioned power stations in South Africa.

Coal

See also: Coal-fired power station and Coal in South Africa. South Africa is the seventh biggest coal producer in the world and has rich coal deposits concentrated in the north-east of the country and as such the majority of South Africa's coal-fired plants are located in the Mpumalanga province. Around 81% of South Africa's energy needs are directly derived from coal[8] and 81% of all coal consumed domestically goes towards electricity production.[9] Historically this has given South Africa access to cheap electricity, but it is also one of the leading reasons that the country is in the top 20 list of carbon dioxide emitting countries.[10] [11] [12]

Power plant Province Coordinates Date commissioned
(planned)
Planned decommission[13] Operator Notes
-25.9438°N 29.7896°W2,352 1971–1975 2025–2029 Eskom[14] [15]
-26.6203°N 30.0938°W1,561 1967–1969;
2005–2008
2020–2023 Eskom[16]
-25.9639°N 29.3373°W3,600 1980–1984 2030–2034 Eskom[17] [18]
-26.7667°N 58°W1,180 1969–1977;
2008–2011
2025–2028 EskomUnits 5 and 6 were the first test facilities for dry cooling in South Africa[19]
-26.033°N 29.6°W1,893 1970–1976 2021–2027 Eskom[20]
-26.116°N 28.194°W420 1957 2026Aldwych InternationalNameplate capacity: 420 MW[21] [22]
-26.0901°N 28.9713°W4,116 1988–1992 2038–2043 EskomDry cooled; the largest dry-cooled power station in the world.[23] [24]
-26.09°N 29.4719°W1,000 1961–1966;
2009–2013
2022 (Currently Decomissoned) Eskom[25]
-26.2541°N 29.1793°W3,000 1976–1979 2026–2029 Eskom[26] [27]
-25.9164°N 28.9171°W4,800 (2022–2024) EskomUnder construction; 4/6 Units Operational[28] [29]
Dry cooled[30] [31] (Planned:4,800MW)
-26.7419°N 27.9775°W3,708 1985–1990 2035–2040 Eskom[32]
-27.1005°N 29.7714°W4,110 1996–2001 2046–2050 Eskom3 units dry cooled (0.2 l/kWh), 3 units wet cooled (2.0 l/kWh)[33]
-23.6685°N 27.6106°W3,990 1987–19912037–2041 EskomDry-cooled[34]
-26.2825°N 29.1407°W3,600 1979–1983 2029–2033 Eskom[35]
-23.7°N 60°W4,800 2021 EskomConstructed; 5/6 Units Operational due to Unit 4 Explosion
Dry cooled[36] [37] (Planned:4,764MW)
-25.7578°N 28.1469°W180 1952 2016 City of TshwaneNameplate capacity: 190 MW[38]
-25.5558°N 28.2383°W300 1963 2025 City of TshwaneNameplate capacity: 600 MW[39]
-26.7786°N 29.3521°W3,654 1985–1990 2035–2040 Eskom[40]
Total: 48,264

Open cycle gas turbine (OCGT)

Power plant Province Coordinates Installed capacity
(MW)
Date
commissioned
Operator Notes
-33.8833°N 18.5355°W171 1976 3x 57MW
-33.5921°N 18.4602°W1,327 2007 [41] 4x 148MW5x 147MW
-34.1666°N 21.9606°W740 2007 5x 148MW
-27.7854°N 29.9696°W18 2007 [42] 1x 18MW
-33.0286°N 27.8811°W171 1976 [43] 3x 57MW
Avon Peaking PowerKZN-29.4196°N 31.1615°W6702016Engie Energy[44] [45] [46] 4x 167.5MW
Dedisa Peaking PowerEC-33.7424°N 25.6727°W3352015Engie EnergyR3.5 billion (2015)[47] [48] 2x 167.5MW
Total: 3,432 27 OCGT units

Natural Gas

Power plant Province Installed capacity
(MW)
Commissioned
Richards Bay Gas Power Plant 3000 2028
12202023 Q3(2 x 225) Coega(2 x 225) Richards Bay(2 x 160)Saldanha Bay
Total4220

Pumped storage

See also: Pumped-storage hydroelectricity and List of reservoirs and dams in South Africa. For a more complete list of hydro power stations from large to pico size, see the African hydropower database.

Power plantProvinceCoordinatesInstalled capacity
(MW)
Date commissioned
(planned)
OperatorNotes
Ingula Pumped StorageKZN-25.1309°N 29.8232°W1,3322017Eskom[49] [50]
Drakensberg Pumped StorageFS-28.2805°N 29.5868°W1,0001981Eskom[51]
Palmiet Pumped StorageWC4001988Eskom
Steenbras Pumped StorageWC-34.1525°N 18.8991°W1801979City of Cape Town
Total:2,912

Hydroelectricity

See also: Hydroelectricity and List of reservoirs and dams in South Africa. For a more complete list of hydro power stations from large to pico size, see the African hydropower database.

Power plantProvinceCoordinatesInstalled capacity
(MW)
Date commissioned
(planned)
OperatorNotes
Cahora Bassa DamTete, Mozambique1,5001974Government of MozambiqueImported through SAPP
GariepFS/EC-30.6236°N 25.5064°W3601971Eskom
Van der KloofNC-29.9922°N 24.7317°W2401977Eskom
Collywobbles / MbasheEC42Eskom
NeusbergNC-32.0005°N 28.583°W10Kakamas Hydro Electric Power
Second FallsEC-31.6862°N 28.8833°W11Eskom
First FallsEC-31.5996°N 28.8186°W6Eskom
Deelkraal IGP5.04Private
Western Deep Level 45GP4.79Private
SaaiplaasMP4.59Private
Kloof 1GP4.52Private
East DriefonteinGP4.48Private
StortemelkFS4.47Private
Vaal Reef 3NW/FS4.33Private
President SteynGP4.15Private
Kruisvallei HydroFS4Private
Merino Power StationFS-28.3637°N 28.3617°W42010Bethlehem Hydro
Bethlehem hydro Merino plantFS4Private
ElandsrandGP3.83Private
Western Deep Level 55GP3.78Private
Vaal Reefs 9NW/FS3.46Private
Bethlehem hydro Sol Plaatje plantGP3Private
Sol Plaatje Power StationFS-28.2163°N 28.3636°W32009Bethlehem Hydro
Western Area 1GP2.97Private
Western Deep Level 70GP2.67Private
LydenburgWC2.6Private
Friedenheim Hydroelectric Power StationMP-25.4514°N 30.9816°W2.51987Freidenheim Irrigation Board
NcoraWC2.4Private
Elandsrand Level 53GP2.39Private
Geduld 2WC2.39Private
Kloof 4WC2.28Private
Ncora Dam Ncora Power StationEC-31.7875°N 27.6669°W2.1Eskom
Lydenburg Hydroelectric Power StationMP-24.9978°N 30.4392°W2.12014Thaba Chweu Local Municipality
Elandsrand Level 71GP2.01Private
FriedenheimWC2Private
L Ormarins upperWC2Private
Geduld 1GP1.98Private
Vaal Reefs 1NW/FS1.86Private
Western DeepGP1.72Private
Vaal Reefs 2NW/FS1.67Private
President BrandGP1.62Private
Vaal Reef 4NW/FS1.62Private
KinrossWC1.61Private
Faure Water Treatment PlantGP1.48Private
ElandsrandGP1.47Private
Western Area 2GP1.34Private
WinkelhaakWC1.32Private
Bakenkop Hydroelectric Power StationMP-27.0855°N 30.9458°W11950Piet Retief
Total:2,283

Nuclear

The two reactors at Koeberg are (as of 2017) the only commercial nuclear power plants on the African continent[52] and accounts for around 5% of South Africa's electricity production.[53] Low and intermediate waste is disposed of at Vaalputs Radioactive Waste Disposal Facility in the Northern Cape.

See also: Nuclear energy in South Africa and Nuclear power.

Wind power

As of 2023, South Africa has 37 operating wind farms with a total installed capacity of about 3,560 MW.

The Department of Energy (DOE) implemented the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP). This is a tender process consisting of "Rounds" where the cheapest tariff and most competitive Economic Development score is awarded a 20-year Power Purchase Agreement (PPA) with Eskom (the state-owned utility) as the Off-taker. The National Treasury has fully underwritten the PPAs. The South African Department of Energy allocated 634 MW of wind capacity in the – bid window 1.[55] [56] [57]

In bid window 2, 562.5 MW capacity was allocated.[58] [59] In bid window 3, 787 MW were allocated.[60] In bid window 4, 676 MW was awarded.[61] [62] In bid window 4 (additional), 687 MW was added.[63]

+Wind farmProvinceCoordinatesTurbine modelPower per turbine (MW)No. of TurbinesTotal Nameplate capacity (MW)Commission dateDeveloperOperatorOwnerWebsite
Amakhala EmoyeniEastern Cape-32.1781°N 25.9587°WNordex N1172.456134.42016/05Watt Energy Tata PowerCennergi/NDhttps://www.thewindpower.net/windfarm_en_21757_amakhala-emoyeni.php
ChabaEastern Cape-32.587°N 27.9591°WVestas V1123721.52015/09EDF RenewablesEDFEDF
CoegaEastern Cape-33.7544°N 25.675°WVestas V901.811.8 2010 Electrawinds[64]
CookhouseEastern Cape-32.7422°N 25.9094°WSuzlon S882.166138.6 2014 Wind ProspectACED / Suzlon Old Mutual[65]
CoppertonNorthern Cape-29.9768°N 22.3565°WAcciona3.1534107.12021ElawanElawanElawan
-33.332°N 18.2438°WFuhrländer FL62

Fuhrländer FL30

Fuhrländer

1.25

0.25

1113.252008 Darling Independent Power Producer Eskom https://archive.today/20130422000054/http://www.darlingwindfarm.co.za/ [66]
DassiesklipWestern Cape-34.1376°N 19.2284°WSinovel SL90 3 9 27 2014/07 BioTherm Energy GLOBELEQGLOBELEQ[67]
DorperEastern Cape-31.43°N 26.4°WNordex N1002.5 40 100 2014/08 Rainmaker EnergyDorper Wind FarmSumitomo Corporation and Dorper Wind Development (A Rainmaker Energy Company)http://dorperwindfarm.co.za
ExcelsiorWestern Cape-34.2388°N 20.2348°WGoldwind GW1212.51332.5
GarobNorthern Cape-29.9289°N 22.4017°WAcciona3.1546144.9
Gibson Bay Eastern Cape-34.1499°N 24.5128°WNordex N90 3 37 111 2017/05 Enel GreenpowerEnel Greenpower[68]
Golden ValleyEastern Cape-32.8364°N 25.9012°WGoldwind2.548120BioTherm Energy
GoudaWestern Cape-33.3°N 19.0333°WAcciona 3 46 138 2015/09 Acciona EnergiaAcciona EnergiaAcciona http://www.acciona-energia.com
GrassridgeEastern Cape-33.6567°N 25.5848°WVestas V112 3 20 60 2015EDF renewablesEDF renewablesEDFhttps://www.thewindpower.net/windfarms_list_en.php
HopefieldWestern Cape-33.0986°N 18.3812°WVestas V1001.8 37 66.6 2014Umoya Energy RMB[69]
Jeffreys BayEastern Cape-34.0024°N 24.8504°WSiemens 2.3 MW 101 2.3 60 138 2014[70] Mainstream Renewable PowerGlobeleq South Africa Management ServicesGlobeleq http://jeffreysbaywindfarm.co.za
KangnasNorthern Cape-29.5447°N 18.2384°WSiemens 2.3 MW 1082.361140.3Mainstream Renewable PowerLekela Power/ND
KarusaNorthern Cape-32.8996°N 20.6286°WVestas V1364.235147Enel GreenpowerEnel Greenpower
KhobabNorthern Cape-30.4344°N 19.5539°WSiemens2.361140.32018Mainstream Renewable PowerMainstream Asset Management Lekela Power[71]
Klipheuwel (dismantled)Western Cape-33.6954°N 18.7251°WVestas V47

Vestas V66

Jeumont J48

0.66

1.75

0.75

33.16 2002 Eskom Generating Division Eskom [72]
Loeriesfontein 2Northern Cape-30.4034°N 19.589°WSiemens2.361140.32017/07Mainstream Renewable PowerMainstream Asset ManagementLekela Power[73]
Longyuan Mulilo De Aar 1 Northern Cape-30.7166°N 23.9206°WUPC 861.56394.52013Longyuan Mulilo ConsortiumLongyuanLongyuanhttps://www.timeslive.co.za/news/south-africa/2017-11-30-de-aar-wind-power-projects-start-feeding-electricity-to-northern-cape/https://www.energy.org.za/data-and-tools/project-database/longyuan-mulilo-de-aar-maanhaarberg-wind-energy-facility
Longyuan Mulilo De Aar 2 Northern Cape-30.5422°N 24.3197°WUPC 861.5961442013Longyuan Mulilo ConsortiumLongyuanLongyuanhttp://www.adenco.co.za/?p=910https://www.energy.org.za/data-and-tools/project-database/longyuan-mulilo-de-aar-2-north-wind-energy-facility
MetroWind Van StadensEastern Cape-33.9615°N 25.2465°WSinovel39272014Metrowind
Noblesfontein-31.7509°N 23.1734°WVestas V1001.84173.8 2014Iberdrola RenewablesElawan Gestamp Wind [74]
NojoliEastern Cape-32.7599°N 25.9188°WVestas V100244882016/12Enel GreenpowerEnel GreenpowerEnel Greenpower
NoupoortNorthern Cape-31.1782°N 25.0304°WSiemens 2.3 MW 1082.33580.52016/02Mainstream Renewable PowerLekela Power
NxubaEastern Cape-32.7448°N 25.9414°WAcciona3.1547148Enel GreenpowerEnel Greenpower
Oyster BayEastern Cape-34.1241°N 24.6356°WVestas V1173.4541147.6Enel GreenpowerEnel Greenpower
Western Cape-33.0544°N 20.1002°WSiemens SWT-1082.348110.4Mainstream Renewable PowerLekela Power
Red Cap KougaEastern Cape-34.147°N 24.711°WNordex N902.53280Red Cap KougaRed Cap KougaRed Cap Kouga
RoggeveldWestern Cape-32.9172°N 20.5091°WAcciona AW-125347147G7 Renewable EnergiesBuilding Energy
SereWestern Cape-31.53°N 18.29°WSiemens SWT-108 2.3 46 105.8 2014 EskomEskomEskom [75] [76]
SeritiMpumalanga-26.9856°N 29.3075°W1552025 ExpectedSeriti ResourcesSeriti Green EnergySeriti Green Energy[77]
Northern Cape-32.7478°N 20.6453°WVestas V117 3.343141.92022Enel Greenpower/Pele Green EnergyEnel Greenpower/Pele Green EnergyEnel Greenpower/Pele Green Energy/Soetwater Wind Farm Community Trust
Tsitsikamma Community Eastern Cape-34.0755°N 24.5046°WVestas V112331952016/03Cennergi, Watt Energy, Tsitsikamma Development TrustVestas Southern Africa (Pty) Ltd[78]
WaainekEastern Cape-33.9615°N 25.2465°WVestas V1123824.62015/12EDF renewablesEDF renewablesEDF renewables
Wesley–CiskeiEastern Cape-33.3025°N 27.3706°WVestas V1263.451034.52021EDF Renewables34°06′04″S 24°31′48″E
Impofu Wind Power Farms ComplexEastern Cape-34.1011°N 24.53°W5.8573302026Enel GreenEnel Green
West Coast OneWestern Cape-32.8343°N 17.9956°WVestas V90247942015/06Engie/WindlabEngie/Investec
Total3562.31

Concentrated solar power

Concentrated solar power uses molten salt energy storage in a tower or trough configurations.

The South African Department of Energy allocated 150 MW of concentrated solar power (CSP) capacity in the Renewable Energy Independent Power Producer Procurement Programme – bid window 1.[55] [56] [57] In the Renewable Energy IPP Procurement Programme: window 2, a capacity of 50 MW was allocated[58] [59] In the Renewable Energy IPP Procurement Programme: window 3, a capacity of 200 MW was allocated.[79] In an additional bid allocation, bid window 3.5, a further 200 MW was allocated.

!Power plant !! Province !! Coordinates !! Installed
capacity (MW)
(planned) !! Annual
output (GWh)
(expected)!!Capacity factor %
(expected) !! Energy
storage (hours) !! Date commissioned
(expected)!! Operator !! Notes
-28.5356°N 21.078°W50 (190) (43) 2Feb 2016 Area: 6 km2[80] [81] [82] [83]
-28.8795°N 19.5928°W100(320) (36) 2.5 March 2015 Total investment: US$891M[84] [85] [86] [87]
-28.7242°N 21.993°W50 (200) (45) 9.3 Dec 2015 $328M[88] [89] [90] [91]
-28.8946°N 19.5982°W100 380 44 5 Aug 2017 $880M total investment[92] [93]
-27.6116°N 23.0277°W100 383 4.5 Feb 2018 EngieParabolic Trough
R12bn (2016)[94] [95] [96] [97]
-28.4905°N 21.5409°W100 4.5 2018
-28.2981°N 23.3656°W(100) (480) (54) 12 (Q1 2024) ACWA PowerTower configuration, dry cooling.
Area: 6.07 km2.
R8bn capital cost, R150M yearly running costs (2015)[98] [99] [100]
-28.4828°N 21.0222°W(150) (730) 12 (2021)
Total: 500
(750)

Solar photovoltaic

The South African Department of Energy allocated 631.53 MW of solar photovoltaic (PV) capacity in the Renewable Energy Independent Power Producer Procurement Programme – bid window 1.[55] [56] [57] In the Renewable Energy IPP Procurement Programme bid window 2, a capacity of 417.1 MW was allocated.[58] [59] [101] In bid window 3, 435 MW was awarded.[60] In bid window 4, 415 MW was awarded.[61] In bid window 4(+), 398 MW was added.[102]

!Power plant !! Province !! Coordinates !! Installed capacity
MW
(planned) !! Annual output
GWh (expected)
!!Capacity factor % (expected)!Status !! Date
commissioned (expected)!! Operator !! Notes
Kalkbult-30.1595°N 24.1306°W75 146.5 (21) Operational Sep 2013 [103] [104] [105] [106] [107] [108]
-33.35°N 18.5295°W5 (8.7) (20) Operational (2013) [109] [110]
-25.7372°N 27.4196°W6.93 Operational Nov 2013
(2014)
[111]
Konkoonsies Solar-28.8871°N 19.5538°W9.65 (18.6) (22) Operational Mar 2014 Globeleq [112]
-29.4945°N 20.783°W9.65 (18.6) (22) Operational Mar 2014
(Jul 2013)
Globeleq[113] [114]
-29.3859°N 23.3149°W10 Operational April 2014 [115]
-29.3856°N 23.315°W63.2 Operational September 2021 Greefspan II Solar Consortium [116]
-29.0026°N 23.8021°W19.9 Operational April 2014 [117]
-29.9657°N 22.3148°W19.93 Operational 1 October 2014 [118]
-22.9917°N 44.1°W28 (50) (20) Operational July 2014 Globeleq R1.4bn (2012)[119]
-24.0417°N 50.7°W29.7 (60) (23) Operational Sep 2014
(Aug 2013)
Core Energy (SunEdison) [120]
-33.4144°N 19.9169°W36 75 24 Operational Dec 2014 CPV-type[121] [122] [123] [124]
-29.3192°N 21.1592°W540 Operational Dec 2023 [125] [126]
-30.5792°N 24.0661°W75 (166.4) (25) Operational Aug 2014 [127] [128] [129]
-30.6286°N 24.0068°W9.7 Operational Aug 2014 [130] [131] [132]
-30.5792°N 24.0661°W75 (166.4) (25) Operational Aug 2014 [133]
-30.5792°N 24.0661°W75 (150) (22) Operational (Feb 2015) [134] [135] [136]
-28.616°N 24.7551°W45.4 (89.4) (20.4) OperationalApr 2014
(Oct 2013)
[137] [138]
-28.9088°N 25.9254°W64 (150) (26) Operational May 2014 Investment: about $293M
Add cost R2bn over 20 years
75 MWDC→64 MWAC[139] [140] [141]
-28.3177°N 23.3573°W64 (150) (26) Operational May 2014 Investment: about $293M
Add cost R2bn over 20 years
75 MWDC→64 MWAC[142] [143] [144]
-27.6015°N 22.9225°W75 (179) (27) Operational Aug 2014 Building Energy incorporating tracking system technology[145] [146] [147] [148]
-27.5866°N 22.9359°W74 (216) (24) Operational Dec 2014 Building Energy Using horizontal trackers. Corresponds to 74 MWAC.[149] [150] [151]
-32.6413°N 18.4973°W(9.00) (18.7) (20) (2014) [152]
-31.6354°N 18.5051°W8.80 (19.0) (20) Operational Jul 2014 [153]
-31.0028°N 24.6588°W36.8 (87) (25) Operational June 2014 [154] [155]
-30.8276°N 26.2106°W32.3 (69.60) (147.2) (24) Operational Dec 2014 [156]
-28.2981°N 23.3656°W75 175.8 (21.4)Operational Nov 2014 Project cost: $260M
96 MWDC→75 MWAC net generation[157] [158] [159] [160] [161] [162] [163]
-28.465°N 36.6°W57 (66) (142) (24) Operational Oct 2014 GlobeleqCost: $247M/R2.4bn (2013)[164] [165] [166]
8.90 Operational Jul 2014
-27.3695°N 23.0126°W(75) (167) (25) Operational(Aug 2016) [167] [168]
-23.0735°N 27.9893°W(60) (119) (23) Operational (Mar 2016) Area: 148 hectares[169]
-30.0244°N 22.3622°W75 Operational July 2016
(Dec 2015)
86 MWDC→ 75 MWAC
Cost: R1.3bn[170] [171] [172]
-32.4231°N 18.7356°W75 (143) Operational 27 April 2016 82.5 MWDC→75 MWAC net generation[173] [174]
-29.0444°N 24.925°W(75) (153) Operational(Aug 2016) Area: 220 hectares (2.2 km2)[175]
-30.0342°N 22.3197°W75 Operational (Nov 2015) Area: 205 hectares (2.05 km2)[176]
-27.6015°N 22.9225°W(28) (61.6)  Under development (201?) Building Energy [177]
NC-28.5458°N 21.1044°W86 212 Operational 2020 Scatec Solar[178] [179]
NC-28.5712°N 24.6979°W75 OperationalSeptember 2020ACEDSolar PV with single-axis tracker[180] [181]
Owned by Old Mutual IDEAS Managed Fund, African Rainbow Energy and Power, Reatile Group, Phakwe Solar[182]
LP-23.6161°N 30.3422°W148 300 Under development(2023)Voltalia Consortium[183]
NC-28.5723°N 21.0765°W86 212 Operational2020Scatec Solar[184]
-28.5661°N 21.0629°W(75) ContractingScatec Solar[185]
-26.895°N 26.6917°W(120) (325)Under development[186] (December 2025)AMEA Power
-28.8918°N 19.5622°W(75) (208)(27.8)Operational[187] September 2020
(Feb 2017)
BioTherm EnergySolar PV with single-axis tracker[188]
-29.2358°N 18.8977°W(40) (111)(28.4)OperationalJuly 2020
(Aug 2016)
BioTherm EnergySolar PV with single-axis tracker[189]
NC-30.5086°N 19.6065°W(75) Contracting(March 2018)Solar CapitalSolar PV with single-axis tracker[190]
NW-25.641°N 27.9372°W50 Operational[191] January 2021De Wildt Solar LimitedSolar PV with single-axis tracker[192] [193]
NW-27.1567°N 26.4003°W(68) (130)Under development(Nov 2017)ACEDSolar PV with single-axis tracker[194]
Under construction, scheduled commercial operation date June 2020[195]
NW-25.5786°N 26.081°W75 180 OperationalJanuary 2021Zeerust Solar CompanySolar PV with single-axis tracker[196] [197]
GP-26.43°N 28.0633°W6.5 OperationalMay 2022Sola GroupSolar PV with single-axis tracker[198]
NW-27.0207°N 24.7755°W(75) Under developmentACEDSolar PV with single-axis tracker[199]
Under construction, scheduled commercial operation date September 2020[200]
Adams Solar PV ProjectNC-27.38803 23.001725Operational
Aurora-Rietvlei Solar PowerWC-32.64134 18.497299OperationalAurora Rietvlei Solar Power
Bellatrix Solar PV ProjectNC-31.53302 23.180945Operational
Capella Solar PV ProjectNW-26.26704 24.567165Operational
Castor Solar PV ProjectFS-28.56623 25.293765Operational
Danielskuil Solar Facility NC-28.2105 23.55565Operational
Disselfontein Solar Facility NC-29.4731 23.90985Operational
Du Plessis Solar PV4NC-30.64328 24.010855Operational
Electra CapitalWC-32.42097 18.7345875OperationalElectra Capital
Greefspan PV Power Plant No. 2NC-29.38486 23.3114755OperationalGreefspan PV No. 2
Heuningspruit PV1FS-27.45278 27.412225Operational
Kakamas Solar FacilityNC-28.78056 20.605565Operational
Keimoes Solar FacilityNC-28.69028 20.985Operational
Mount Roper Solar FacilityNC-27.34611 23.191675Operational
Mulilo Solar PV De AarNC-30.6279 24.0054510OperationalMulilo Renewable Energy Solar PV De Aar
Mulilo Solar PV PrieskaNC-29.96766 22.3196819.12OperationalMulilo Prieska PV
Skuitdrift 1NC-28.61421 19.781115Operational
Skuitdrift 2NC-28.60533 19.771755Operational
South African Mainstream Renewable Power De AarNC-30.619 24.0338945.6OperationalDe Aar Solar Power
South African Mainstream Renewable PowerNC-28.612 24.75845.6OperationalDroogfontein Solar Power
Steynsrus PV1FS-27.90472 27.531675Operational
Steynsrus PV2FS-27.90556 27.541395Operational
Upington AirportNC-28.4 21.2688.9OperationalSublunary Trading
Total:1,717
(1,045)

Landfill gas power

Power Plant Province Installed
capacity (MW)
(planned)
Coordinates Date commissioned
(expected)
Operator Notes
Joburg Landfill Gas to Electricity - Marie Louise GP4.76 -26.1917227.881222014–2016ENER-G Systems Joburg (Pty) Ltd
Joburg Landfill Gas to Electricity - GoudkoppiesGP4.04-26.2822327.927172014–2016
Joburg Landfill Gas to Electricity - Linbro ParkGP3.17-26.0937528.121332014–2016
Joburg Landfill Gas to Electricity - EnnerdaleGP1.03-26.3694727.832722014–2016
Joburg Landfill Gas to Electricity - Robinson DeepGP5-26.2333528.040732014–2016
1 2006 [203] [204] [205]
6.5 2009
Total:25.5

Biomass power

Power plant Province Installed capacity
MW (planned)
Annual output
GWh (expected)
Date commissioned
(expected)
Operator LatitudeLongitudeNotes
PetroSA Biogas Project4,2(32)2007PetroSA
Ngodwana Energy Project25 (198)Q3 2018Sappi-25.5781°N 30.6588°W
Mkuze (17.5) (130)2023–2024
Umfolozi Sugar MillKZN4.5Umfolozi Sugar Mill Pty (Ltd)-28.44273232.184034
Tongaat FelixtonKZN9Tongaat Hulett Sugar SA Ltd-28.83444531.890996
Komati MillMP8TSB Sugar International-25.554431.866333
Busby Renewables Biomass ProjectMP5-26.8120130.44063
George Biomass to Energy ProjectWC5-33.9949322.45337
Tongaat AmatikuluKZN5Tongaat Hulett Sugar SA Ltd-29.04519331.525656
Malelane MillMP4TSB Sugar International-25.27511231.333889
Illovo EstonKZN2Illovo Sugar (South Africa) Ltd-26.22467428.187927
Total:71.7

See also

Department of Energy Data Portal - http://redis.energy.gov.za/power-producers/

External links

Notes and References

  1. Web site: BP Statistical Review of World Energy July 2021.
  2. Web site: The World Fact Book. Central Intelligence Agency. 26 January 2018.
  3. Web site: Cape Argus.
  4. Web site: Energy Security Master Plan – Electricity 2007–2025. dme.gov.za. 15. 12 January 2010.
  5. Web site: Apollo substation at full capacity. www.eskom.co.za. 2016-01-03.
  6. News: Eskom uses tight power supply to defend tariff hike. 28 June 2009. Mail & Guardian. 8 January 2010.
  7. Web site: Renewables 2014 global status report. REN21. 30 March 2015.
  8. Web site: Coal . dme.gov.za . 8 January 2010 . dead . https://web.archive.org/web/20091202053007/http://www.dme.gov.za/energy/coal.stm . 2 December 2009 .
  9. Web site: HOW ENERGY GENERATION CAUSES ENVIRONMENTAL CHANGE IN SOUTH AFRICA . . 7 October 2010 . dead . https://web.archive.org/web/20110716182235/http://www.environment.gov.za/soer/nsoer/drivers/general/Energy.doc . 16 July 2011 .
  10. News: SA's hidden carbon headache . Ferreira . Anton. 5 December 2009. The Sunday Times. 8 January 2010.
  11. Web site: South Africa's energy industry. Government of South Africa. 8 January 2010. https://web.archive.org/web/20120219162251/http://www.southafrica.info/business/economy/sectors/energy.htm. 19 February 2012. dead.
  12. Web site: South Africa. US Energy Information Administration. 8 January 2010. dead. https://web.archive.org/web/20100109105350/http://www.eia.doe.gov/emeu/cabs/South_Africa/Background.html. 9 January 2010. dmy-all.
  13. Web site: INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) 2010–2030. Departm ent of Energy (DoE). 11 July 2015.
  14. Web site: Arnot Power Station. Eskom. 29 January 2016.
  15. Web site: Fact sheets with additional information. 29 January 2016.
  16. Web site: Camden Power Station. Eskom. 6 January 2010. dead. https://web.archive.org/web/20110927044504/http://www.eskom.co.za/live/content.php?Item_ID=162. 27 September 2011. dmy-all.
  17. Web site: DUVHA POWER STATION . . 8 January 2010 . dead . https://web.archive.org/web/20110927044528/http://www.eskom.co.za/live/content.php?Item_ID=163 . 27 September 2011 .
  18. Web site: COST COMPARISONS BETWEEN ELECTROSTATIC PRECIPITATORS AND PULSE JET FABRIC FILTERS AND INHERENT CHALLENGES OF BOTH TECHNOLOGIES AT ESKOM'S 6 X 600 MW UNITS AT DUVHA POWER STATION . Rod Hansen, Robbie van Rensburg . June 2006 . International Society for Electrostatic Precipitation . 8 January 2010 . dead . https://web.archive.org/web/20110726191707/http://www.isesp.org/ICESP%20X%20PAPERS/PDFS/Paper%207C1.pdf . 26 July 2011 .
  19. Web site: Grootvlei Power Station . . 9 January 2010 . dead . https://web.archive.org/web/20100825083116/http://www.eskom.co.za/live/content.php?Item_ID=168 . 25 August 2010 .
  20. Web site: HENDRINA POWER STATION . . 9 January 2010 . dead . https://web.archive.org/web/20100825083122/http://www.eskom.co.za/live/content.php?Item_ID=169 . 25 August 2010 .
  21. News: Old power station brings new hope . Swart. Werner. 1 September 2009. The Sunday Times (South Africa). 7 January 2010.
  22. Web site: Kelvin power station recomissioning. https://archive.today/20120728231207/http://www.eepublishers.co.za/view.php?sid=20104. dead. 28 July 2012. EE Publishers. 7 October 2010.
  23. News: World's largest coal-fired power station. (Kendal Power Station in South Africa). November 1994. BNET. 10 January 2010.
  24. Web site: KENDAL POWER STATION. Eskom. 10 January 2010. dead. https://web.archive.org/web/20100613115354/http://www.eskom.co.za/live/content.php?Item_ID=170. 13 June 2010. dmy-all.
  25. Web site: The Role of the State in the Energy Sector . dme.gov.za . 13 January 2010 . dead . https://web.archive.org/web/20071216220625/http://www.dme.gov.za/pdfs/energy/Energy_Summit/Final%20Role%20of%20State%20in%20Energy%2021%20Sept%202007.doc . 16 December 2007 .
  26. Web site: KRIEL POWER STATION . . 10 January 2010 . dead . https://web.archive.org/web/20100824051230/http://www.eskom.co.za/live/content.php?Item_ID=177 . 24 August 2010 .
  27. Web site: Coal-burning generating plant. Eskom. 7 October 2010. dead. https://web.archive.org/web/20110817201603/http://heritage.eskom.co.za/heritage/annualreports/1976/NEW%20Coal.pdf. 17 August 2011. dmy-all.
  28. Web site: Supply status. 24 March 2015. dead. https://web.archive.org/web/20150417033840/http://www.eskom.co.za/Whatweredoing/SupplyStatus/Pages/Supply_Status2.aspx. 17 April 2015. dmy-all.
  29. Web site: Eskom Supply status – week 47, 2013. 4 December 2013. https://web.archive.org/web/20140720045448/http://www.eskom.co.za/Whatweredoing/SupplyStatus/Documents/AdequacyReport2013w47.ppt. 20 July 2014. dead. dmy-all.
  30. Web site: Work begins on Kusile power station. 11 August 2008. Government of South Africa. 9 January 2010. https://web.archive.org/web/20090308091109/http://southafrica.info/business/economy/infrastructure/kusile-110808.htm. 8 March 2009. dead. dmy-all.
  31. Web site: CONSTRUCTION OF KUSILE POWER STATION GETS UNDERWAY. 5 August 2008. Eskom. 9 January 2010. dead. https://web.archive.org/web/20110927044629/http://www.eskom.co.za/live/content.php?Item_ID=7516. 27 September 2011. dmy-all.
  32. Web site: Lethabo Power Station . . 11 January 2010 . dead . https://web.archive.org/web/20090713043507/http://www.eskom.co.za/live/content.php?Item_ID=179 . 13 July 2009 .
  33. Web site: KAJUBA POWER STATION. Eskom. 11 January 2010.
  34. Web site: MATIMBA POWER STATION. Eskom. 10 January 2010.
  35. Web site: MATLA POWER STATION. Eskom. 10 January 2010.
  36. Web site: Consolidated interim results for the six months ended 30 September 2010. Eskom. 23 November 2011. 22 February 2011. dead. https://web.archive.org/web/20110124195139/http://www.eskomfinance.co.za/upload/Interm_results23Nov_2010_final1.pdf. 24 January 2011. dmy-all.
  37. Web site: MEDUPI POWER STATION NEW RAW WATER RESERVOIR AND PIPELINES PROJECT VISUAL IMPACT ASSESSMENT. Eskom. 7 October 2010.
  38. Web site: City of Tshwane Investment Promotion and Development Strategy. March 2006. City of Tshwane. 10 January 2010. dead. https://web.archive.org/web/20070212030707/http://www.tshwane.gov.za/documents/econdev/investmentpromotion/3rdDraft.pdf. 12 February 2007. dmy-all.
  39. Web site: DEVELOPMENT OF THE TSHWANE SUSTAINABLE ENERGY AND CLIMATE CHANGE STRATEGY. City of Tshwane. 10 January 2010.
  40. Web site: Tutuka Power Station. Eskom. 11 January 2010. dead. https://web.archive.org/web/20110927045014/http://www.eskom.co.za/live/content.php?Item_ID=188. 27 September 2011. dmy-all.
  41. Peaking power stations - Eskom
  42. Web site: IPSA Projects – Newcastle. 24 March 2015. https://web.archive.org/web/20150402125501/http://www.ipsagroup.co.uk/projects/newcastle-kwazulu-natal. 2 April 2015. dead. dmy-all.
  43. https://www.eskom.co.za/wp-content/uploads/2022/04/GS-0001-Gas-Turbine-Stations-Acacia-and-Port-Rex-Rev-13.pdf PORT REX AND ACACIA GAS TURBINE STATIONS
  44. Web site: NERSA's Public Hearing - AVON PEAKING POWER (PTY) LTD and DEDISA PEAKING POWER (PTY) LTD.
  45. Web site: SA large scale IPP peaking power projects. 10 June 2013 . 2015-09-23.
  46. Web site: 685 MW Avon power plant enters commercial operation. Kilian. Anine. 2016-07-25.
  47. Web site: Industrial gas plants add to Coega's resources. Business Day Live. 2015-09-23.
  48. Web site: SA's first independent power goes commercial. SABC. https://web.archive.org/web/20160129084954/http://www.sabc.co.za/news/a/aa8482804a1080f59fa5dfa53d9712f0/SAsundefinedfirstundefinedindependentundefinedpowerundefinedgoesundefinedcommercial-20150210. 29 January 2016. dead. dmy-all.
  49. Web site: Ingula Pumped Storage Scheme, South Africa . 7 October 2010 . Power-Technology.
  50. Web site: Case Study of Ingula and Lima Pumped Storage Schemes . dead . https://web.archive.org/web/20150529161214/http://www.rmwg.co.za/Presentations/power_converence/11_Pumped_Storage_Schemes_%28Ingula%20and%20Lima%29_Frans_Louwin.pdf . 29 May 2015 . 19 April 2015.
  51. Web site: October 2005 . Drakensberg Pumped Storage Scheme . dead . https://web.archive.org/web/20131016160516/http://www.eskom.co.za/content/Drakensburg%20FA%20Pg%2001-06.pdf . 16 October 2013 . 9 November 2008 . Eskom.
  52. Web site: Koeberg Power Station. 6 April 2015.
  53. Web site: Nuclear Power in South Africa. World Nuclear Association. 6 October 2010.
  54. Web site: IAEA PRIS – Country Details – South Africa. 30 April 2015.
  55. Web site: Statement by the Minister of Energy, Hon. Dipuo Peters, MP, on the occasion of the announcement of preferred bidders in respect of the first window of 3 725MW under the Renewable Energy IPP Bidding Programme. 17 August 2013.
  56. Web site: Renewable Energy Independent Power Producer Procurement Programme . 17 August 2013 . dead . https://web.archive.org/web/20130809004400/http://www.ipprenewables.co.za/ . 9 August 2013 .
  57. Web site: Recommended Preferred Bidders – Window 1. 17 August 2013. dead. https://web.archive.org/web/20150907224537/http://www.ipprenewables.co.za/page/1183. 7 September 2015. dmy-all.
  58. Web site: Preferred Bidders – Window 2. 17 August 2013. dead. https://web.archive.org/web/20150907222310/http://www.ipprenewables.co.za/page/1209. 7 September 2015. dmy-all.
  59. Web site: Renewable Energy IPP Procurement Programme: Window two Preferred Bidders' announcement. 17 August 2013.
  60. Web site: Bid Window 3 Preferred Bidders' announcement 4 November 2013. 14 August 2015.
  61. Web site: Expansion and Acceleration of the Independent Power Producer Procurement Programme. 22 April 2015.
  62. Web site: REIPPP window 4 preferred bidders. 10 May 2015.
  63. Web site: Department of Energy sheds light on Renewable Energy IPPs.
  64. Web site: COEGA windfarm (South Africa). 2 February 2014.
  65. Web site: CONSTRUCTION OF COOKHOUSE WIND FARM PROGRESSING IN EARNEST. 11 August 2014.
  66. Web site: Darling windfarm (South Africa). 2 February 2014.
  67. Web site: BioTherm Energy.
  68. Web site: BioTherm Energy.
  69. Web site: Hopefield windfarm (South Africa). 2 February 2014.
  70. http://www.renewableenergymagazine.com/article/globeleq-inaugurates-south-african-wind-farm-20140715 "Globeleq inaugurates South African wind farm"
  71. Web site: Overview Khobab Wind Farm Sustainable Wind Energy. khobabwind.co.za. en. 2018-11-06.
  72. Web site: Klipheuwel windfarm (South Africa). 2 February 2014.
  73. Web site: Overview Loeriesfontein Wind Farm Sustainable Wind Energy. loeriesfonteinwind.co.za. en. 2018-11-06.
  74. Web site: Nobelsfontaine windfarm (South Africa). 2 February 2014.
  75. Web site: Sere wind power project, South Africa. 2 February 2014.
  76. Web site: Siemens Southern Africa Eskom Sere Wind Farm to be constructed by Siemens South Africa. 2 February 2014. https://web.archive.org/web/20140220121601/http://www.africapresssiemens.co.za/press%20releases/eskom-sere-wind-farm-to-be-constructed-by-siemens-south-africa/. 20 February 2014. dead.
  77. Web site: . South Africa's Seriti to build wind farm to power its coal mines . 2 February 2023 . Nelson Banya, Kenneth Maxwell, Helen Reid and Emelia Sithole-Matarise . 12 February 2024.
  78. Web site: Cennergi – Tsitsikamma Community Wind Farm (TCWF). clients1.3gs.co.za. en-US. 2018-11-06.
  79. Web site: Bid Window 3 Preferred Bidders' announcement - 4 November 2013.
  80. Web site: Khi Solar One. 17 August 2013. dead. https://web.archive.org/web/20130818232121/http://csp-world.com/cspworldmap/khi-solar-one. 18 August 2013. dmy-all.
  81. Web site: NERSA !Khi Solar One license application – public hearing Postmasburg, 6 March 2012. 17 August 2013.
  82. Web site: Company Announcement: SPX to Install World's First Large Scale Natural Draft Condenser at South African Solar Power Plant. 17 August 2013.
  83. Web site: Khi Solar One enters commercial operation. Engineering News. 2016-02-09. Anine. Kilian.
  84. Web site: KaXu Solar One launched. 12 May 2015. https://web.archive.org/web/20150701224349/http://www.idc.co.za/home/media-room/articles/773-kaxu-solar-one-launched.html. 1 July 2015. dead.
  85. Web site: Kaxu Solar One. CSP World. 17 August 2013. dead. https://web.archive.org/web/20130819075605/http://csp-world.com/cspworldmap/kaxu-solar-one. 19 August 2013. dmy-all.
  86. Web site: NERSA !KaXu Solar One license application – public hearing Postmasburg, 6 March 2012. 17 August 2013.
  87. Web site: Abengoa Solar :: Our plants :: Operating facilities :: South Africa. Abengoa Solar. 3 March 2015. dead. https://web.archive.org/web/20150406073446/http://www.abengoasolar.com/web/en/nuestras_plantas/plantas_en_operacion/sudafrica/#seccion_1. 6 April 2015. dmy-all.
  88. Web site: South Africa turns on R5 billion Saudi-built solar to cut coal reliance. REUTERS. Times LIVE. 2016-03-14.
  89. Web site: Bokpoort. CSP World. 17 August 2013. dead. https://web.archive.org/web/20130819061750/http://csp-world.com/cspworldmap/bokpoort. 19 August 2013. dmy-all.
  90. Web site: Bokpoort CSP (Concentrating Solar Power) Project, South Africa Version: 01 Date: 30/01/2012. 17 August 2013.
  91. Web site: Construction starts on Bokpoort CSP plant. 17 August 2013.
  92. Web site: NERSA XiNa Solar One license application – public hearing Kimberley, 18 February 2014. 6 April 2015. https://web.archive.org/web/20150411160027/http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/XiNa%20Solar%20One%20%20RF%20%28PTY%29%20LTD.pdf. 11 April 2015. dead.
  93. Web site: Abengoa closes USD 660 million project financing for Xina Solar One, 100 MW solar power plant in South Africa. 12 May 2015. https://web.archive.org/web/20150529161428/http://www.abengoasolar.com/web/en/acerca_de_nosotros/sala_de_prensa/noticias/2015/abg_20150313-1.html. 29 May 2015. dead.
  94. Web site: 100 MW Kathu CSP plant to be operational in 2018. Creamer. Terence. Engineering News. 2016-05-11.
  95. Web site: New solar plants in sunny Northern Cape. www.southafrica.info. 2016-05-11. https://web.archive.org/web/20150115143726/http://www.southafrica.info/about/sustainable/solar-redstone-9115.htm#.VzL3ViGNLNM. 15 January 2015. dead. dmy-all.
  96. Web site: Kathu Solar Power Park - Nersa. https://web.archive.org/web/20160806055319/http://www.nersa.org.za/Admin/Document/Editor/file/Notices/Invitations/ELC/Kathu%20Solar%20Power%20Park.pdf. 6 August 2016. dead.
  97. Web site: The R12bn Kathu solar project: Good-bye diesel. Hello molten salt.. 2016-08-17.
  98. Web site: SolarReserve Wins Bid to Build South African Solar Plus Storage Plant. 8 January 2015 . 9 March 2016.
  99. Web site: Redstone Solar Thermal Power Plant. 6 April 2015.
  100. Web site: Reliably Powering South Africa with Clean Solar Energy – Day and Night.. SOLARRESERVE. 14 April 2015.
  101. Web site: PV Plants Map 2012 South Africa. 17 August 2013. dead. https://web.archive.org/web/20130903060208/http://green-cape.co.za/upload/South-Africa-Map-V5.pdf. 3 September 2013. dmy-all.
  102. Web site: Department of Energy sheds light on Renewable Energy IPPs. 14 August 2015.
  103. Web site: Scatec Solar: Kalkbuilt Project Nersa IPP Public Hearing Kimberly 5 March 2012. 17 August 2013.
  104. Web site: Construction of the Kalkbult Solar PV Plant is progressing as planned. 17 August 2013. dead. https://web.archive.org/web/20130827143223/http://www.scatecsolar.com/page_19_5.php. 27 August 2013. dmy-all.
  105. Web site: 115 MW solar power plants for Linde, Dreunberg. 21 August 2013.
  106. Web site: REIPPPP first-window project connected to grid. Engineering News. 16 September 2013.
  107. Web site: South Africa's impressive solar power plants . MyBroadband . 11 February 2015.
  108. Web site: COMPONENT PROJECT ACTIVITIES DESIGN DOCUMENT (CPA-D D). 5 April 2015.
  109. Web site: SlimSun Swartland Solar Park NERSA Public Hearing Renewable Energy Power Plant License Application 1st March 2012, Cape Town. 17 August 2013.
  110. Web site: SlimSun Swartland Solar Park. 17 August 2013.
  111. Web site: First Renewable Energy Project in Rustenburg North West Province NERSA Public Hearings at Bela Bela 08 March 2012. 17 August 2013.
  112. Web site: NERSA Public Participation Process Konkoonsies Solar PV Energy Facility March 6, 2012. 17 August 2013.
  113. Web site: Plants & Projects Globeleq Powering Africa's Growth. 2020-12-22. en.
  114. Web site: NERSA Public Participation Process Aries Solar PV Energy Facility March 6, 2012. 17 August 2013.
  115. Web site: Project Design Document (PDD). 22 August 2013.
  116. Web site: South Africa: Greefspan II solar power plant starts commercial operations . 20 September 2021 . Afrik21.africa . Jean Marie Takouleu . 3 November 2022 . Paris, France.
  117. Web site: Energy Programmes and Projects. 5 April 2015.
  118. Web site: Mulilo Renewable Energy Solar PV Prieska. 18 August 2013.
  119. Web site: Presentation to NERSA on Soutpan Solar Park 8 March 2012. 5 April 2015.
  120. Web site: Presentation to NERSA on Witkop Solar Project 8 March 2012 Presented by Core Energy. 30 August 2013.
  121. Web site: CPV Power Plant No.1 Vincenzo Bellini. 25 August 2013. 24 July 2015. https://web.archive.org/web/20150724205019/http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/CPV%20Power%20Plant%20No%201.pdf. dead.
  122. Web site: Touwsrivier Solar Energy Facility. 25 August 2013. dead. https://web.archive.org/web/20130129011728/http://www.eeu.org.za/thematic-areas/environmental-management-and-sustainability/touwsrivier-solar-energy-facility. 29 January 2013. dmy-all.
  123. Web site: Soitec, Schneider team up on Touwsrivier solar project. 25 August 2013.
  124. Web site: Appendix 1.3 CONSTRAINTS MAP AND OTHER STATUS QUO MAPPING. 25 August 2013. dead. https://web.archive.org/web/20141018062521/http://www.eeu.org.za/downloads/touwsrivier-documents/Appendix%201.3_Constraints%20-%20Status%20Quo%20Mapping.pdf. 18 October 2014. dmy-all.
  125. Web site: Powerinfotoday.com (PITC) . Scatec wins tender for Kenhardt solar project in South Africa . 2019 . PITC . 15 December 2023 . Somajiguda, Hyderabad, India.
  126. Web site: South Africa: Kenhardt solar farms come on stream in the Northern Cape . Afrik21.africa . 12 December 2023 . Jean Marie Takouleu . 14 December 2023 . Paris, France.
  127. Web site: De Aar. 18 August 2013. dead. https://web.archive.org/web/20130820120417/http://solarcapital.co.za/de-aar-0. 20 August 2013. dmy-all.
  128. Web site: Solar Capital says 75 MW De Aar project is 'first phase'. 18 August 2013.
  129. Web site: Solar Capital presentation to NERSA. 18 August 2013.
  130. Web site: Mulilo Renewable Energy. 17 August 2013.
  131. Web site: Project Design Document (PDD) De Aar Grid Connected 10 MW Solar Park, 29 February 2012. 17 August 2013.
  132. Web site: Mulilo Renewable Energy Solar PV De Aar. 17 August 2013.
  133. Web site: Solar Capital presentation to NERSA. 18 August 2013.
  134. Web site: COMPONENT PROJECT ACTIVITY DESIGN DOCUMENT FORM (F-CDM-CPA-DD) Version 02.0. 18 August 2013.
  135. Web site: De Aar 3. 18 August 2013.
  136. Web site: South Africa's Largest Thin-Film Solar PV Project Commissioned. CleanTechnica. 18 October 2014 . 2015-09-18.
  137. Web site: South African Mainstream Renewable Power DroogfonteinPty Ltd Presented to : NERSA PostmansburgTown Hall, Postmansburg Date: 6 March 2012. 27 August 2013.
  138. Web site: Droogfontein Solar (PV). 27 August 2013. dead. https://web.archive.org/web/20131015064211/http://www.globeleq.com/portfolio/development_projects/6/Droogfontein-Solar-PV. 15 October 2013. dmy-all.
  139. Web site: Letsatsi PV Project . 12 January 2015 . dead . https://web.archive.org/web/20150107033038/http://www.solarreserve.com/what-we-do/pv-development/letsatsi/ . 7 January 2015 .
  140. Web site: SolarReserve, Kensani and Intikon Complete $260 million Solar Project Financing with Key Investment from Google and the PIC. 12 May 2015.
  141. Web site: Letsatsi – Solar Reserve. 12 May 2015. https://web.archive.org/web/20150518095719/http://www.solarreserve.com/en/global-projects/pv/letsatsi. 18 May 2015. dead.
  142. Web site: LESEDI PV PROJECT- 64 MW PV POWER PLANT – March 2012. 17 August 2013.
  143. Web site: Lesedi PV Project | SolarReserve . 2015-01-12 . dead . https://web.archive.org/web/20150118072118/http://www.solarreserve.com/what-we-do/pv-development/lesedi/ . 18 January 2015 .
  144. Web site: Lesedi. 12 May 2015. https://web.archive.org/web/20150518095656/http://www.solarreserve.com/en/global-projects/pv/lesedi. 18 May 2015. dead.
  145. Web site: New solar plants in sunny Northern Cape . South Africa.info . 9 January 2015 . 15 January 2015 . https://web.archive.org/web/20150114233310/http://www.southafrica.info/about/sustainable/solar-redstone-9115.htm#.VLeKIdKUeCq . 14 January 2015 . dead . dmy-all .
  146. Web site: Developers of Kathu solar park expect to start building this month. 17 August 2013.
  147. Web site: NERSA PUBLIC HEARINGS Kathu 75MW Photovoltaic Plant Potsmansburg, 6 March 2012. 17 August 2013.
  148. Web site: Project Design Document (PDD). 17 August 2013.
  149. Web site: Background Information Document-Kathu. 18 August 2013.
  150. Web site: moneyweb.co.za. Sishen solar energy plant connected to grid. 27 December 2014. 12 December 2014.
  151. Web site: Planta Sishen . 27 December 2014 . 26 February 2015 . https://web.archive.org/web/20150226013653/http://www.acciona-energia.com/activity_areas/solar_photovoltaic/installations/planta-sishen/planta-sishen.aspx . dead .
  152. Web site: AURORA-RIETVLEI SOLAR POWER (PTY) LTD. NERSA Public Hearing on the Application for a Generation License for Renewable Energy Power Plants 13 AUGUST 2012. 17 August 2013.
  153. Web site: VREDENDAL SOLAR POWER PARK (PTY) LTD. NERSA Public Hearing on the theApplication for a Generation License for Renewable Energy Power Plants 13 AUGUST 2012. 18 August 2013.
  154. Web site: CDM: Scatec Solar Linde CPA-001 (SSL CPA-001).. cdm.unfccc.int. 2015-09-18. United Nations Framework Convention on Climate. Change.
  155. Web site: Scatec Solar completes another 40 MW solar plant in South Africa. www.scatecsolar.com. 2015-09-18. eZ. Systems. 7 July 2014 .
  156. Web site: EIA Dreunberg Eastern Cape. 17 September 2015.
  157. Web site: Jasper solar photovoltaic project, South Africa. 17 August 2013.
  158. Web site: Jasper PV Project . 17 August 2013 . dead . https://web.archive.org/web/20130807224749/http://www.solarreserve.com/what-we-do/pv-development/jasper/ . 7 August 2013 .
  159. Web site: Google invests R103m in SA solar project. 2 June 2013 . 17 August 2013.
  160. Web site: Investing in a South African solar project. 30 May 2013 . 17 August 2013.
  161. Web site: South Africa: 96 MW Jasper project financing successfully closed. 17 August 2013.
  162. Web site: SolarReserve, Kensani and Intikon Complete $260 million Solar Project Financing with Key Investment from Google and the PIC. 17 August 2013.
  163. Web site: Jasper PV Project | SolarReserve . 2013-08-17 . dead . https://web.archive.org/web/20130807224749/http://www.solarreserve.com/what-we-do/pv-development/jasper/ . 7 August 2013 .
  164. Web site: Boshof Solar Park CPA-011 PoA: Green Power for South Africa. 19 April 2015.
  165. Web site: Terence Creamer . 60 MW Free State solar project secures R1.8bn from US development agency . Engineeringnews.co.za . 2013-11-06 . 2022-03-18.
  166. Web site: COMPONENT PROJECT ACTIVITIES DESIGN DOCUMENT (CPA-DD). 19 April 2015.
  167. Web site: ADAMS SOLAR PV PROJECT PUBLIC HEARING KIMBERLEY 18 FEBRUARY 2014. 6 April 2015.
  168. Web site: Adams Solar PV 2. 6 April 2015.
  169. Web site: TOM BURKE SOLAR PARK PUBLIC HEARING PRETORIA 21 FEBRUARY 2014. 19 April 2015. https://web.archive.org/web/20150518084619/http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/Tobivox%20%28Pty%29%20Ltd.pdf. 18 May 2015. dead.
  170. Web site: Mulilo Sonnedix Prieska PV (PTY) LTD 75MW Solar PV Power Plant. 18 April 2015.
  171. Web site: 86 MW Prieska solar plant enters commercial operation. Reporter. Creamer Media. 2016-07-26.
  172. News: Another large-scale solar PV plant officially opens in N Cape. Reporter. Creamer Media. Engineering News. 2016-10-31.
  173. Web site: PALEISHEUWEL SOLAR PARK PUBLIC HEARING CAPE TOWN 20 FEBRUARY 2014. 14 April 2015.
  174. http://aworldgate.over-blog.com/2016/04/ternienergia-completes-82-5-mw-pv-plant-in-s-africa.html TerniEnergia completes 82.5-MW PV plant in S Africa
  175. Web site: PULIDA SOLAR PARK PUBLIC HEARING KIMBERLEY 18 FEBRUARY 2014. 19 April 2015. https://web.archive.org/web/20150929102131/http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/Pulida%20Energy%20%28Pty%29%20LTD.pdf. 29 September 2015. dead.
  176. Web site: Mulilo Prieska PV (PTY) LTD 75MW Solar PV Power Plant. 18 April 2015.
  177. http://www.buildingenergy.it/building-energy--africa.html Interactive Map of Projects
  178. Web site: Scoping phase public meeting.
  179. Web site: NERSA Public Hearing Sirius Solar PV Project One (Pty) Ltd.
  180. Web site: NERSA PUBLIC HEARING – September 2015 DROOGFONTEIN 2 SOLAR PARK.
  181. Web site: Bungane . Babalwa . 2020-09-02 . Droogfontein 2 Solar Park begins full operation in South Africa . 2020-10-01 . ESI-Africa.com . en-ZA.
  182. Web site: Droogfontein 2 Solar PV. 2020-12-22. Aced. en-US.
  183. Web site: Afrik21.africa . 7 October 2022 . South Africa: Voltalia to sell 148 MWp of solar power to Rio Tinto from 2024 . Jean Marie Takouleu . 8 October 2022 . Paris, France.
  184. Web site: NERSA Public Hearing Dyason's Klip 1 (Pty) Ltd.
  185. Web site: NERSA Public Hearing Dyason's Klip 2 (Pty) Ltd.
  186. Web site: UAE's Amea Power Raises $108m For Its Doornhoek Solar Farm In South Africa . Afrik21.africa . 10 June 2024 . Jean Marie Takouleu . 11 June 2024 . Paris, France.
  187. Web site: Two utility-scale solar plants now operational in the Northern Cape. 2020-12-22. www.iol.co.za. en.
  188. Web site: 18 May 2015 - Konkoonsies II Gen Licence Application Public Participation. dead. https://web.archive.org/web/20160129084955/http://www.biothermenergy.com/pdf/glppkk2.pdf. 29 January 2016. dmy-all.
  189. Web site: 18 May 2015 - Aggeneys Gen Licence Application Public Participation. dead. https://web.archive.org/web/20160129084955/http://www.biothermenergy.com/pdf/agpp.pdf. 29 January 2016. dmy-all.
  190. Web site: Solar Capital Orange (Pty) Ltd. De Aar 86.25 MW NERSA Public Hearing.
  191. Web site: South Africa: De Wildt PV solar power plant (50 MWp) goes into operation . Afrk21.africa . 29 January 2021 . Jean Marie Takouleu . 4 June 2022 . Paris, France.
  192. Web site: NERSA PUBLIC HEARING – September 2015 - ZEERUST, BOKAMOSO & DE WILDT SOLAR PARKS.
  193. Web site: De Wildt Solar PV. 2020-12-22. Aced. en-US.
  194. Web site: FINAL SCOPING REPORT - For the Proposed Bokamoso Photovoltaic Solar Energy Facility near Leeudoringstad, Registration Division HP, North West Province..
  195. Web site: Bokamoso Solar PV. 2020-12-22. Aced. en-US.
  196. Web site: PV Solar Energy Facility, Zeerust. South African Heritage Resources Agency (SAHRA).
  197. Web site: Zeerust Solar PV. 2020-12-22. Aced. en-US.
  198. Web site: Heineken South Africa launches municipality’s largest grid-connected solar plant . 28 October 2022 . Nasi Hako . 3 November 2022 . ESI-Africa . Cape Town, South Africa.
  199. Web site: PALAEONTOLOGICAL HERITAGE ASSESSMENT: COMBINED DESKTOP & FIELD - BASED STUDY Proposed PV Solar Facility on a portion of the farm Waterloo 992 near Vryburg, Naledi Local Municipality, North-West Province.
  200. Web site: Waterloo Solar PV. 2020-12-22. Aced. en-US.
  201. Web site: Afrik21.africa . Solar, wind and storage in one: Oya reaches a milestone in South Africa . 16 February 2024 . Jean Marie Takouleu . 19 February 2024 . Paris, France.
  202. Web site: Green Building Africa . 15 February 2024 . RMIPPPP 128MW Oya Energy Wind/Solar/Battery Hybrid Project Reaches Financial Close In South Africa . Bryan Groenendaal . 19 February 2024 . Johannesburg, South Africa.
  203. Web site: LJ Strachan. L Pass. Credits where they're due. 8 March 2015.
  204. Web site: eThekwini. Municipality. Project Summary Document: Durban Landfill-Gas to Electricity. eThekwini Municipality. 8 March 2015.
  205. Web site: Durban Solid Waste Mariannhill Landfill. 29 January 2020. https://web.archive.org/web/20190106152758/http://www.dbnlandfillgas2elec.co.za/. 6 January 2019. dead.