List of power stations in Indonesia explained

The following lists some of the larger power stations in Indonesia. Data are not included for a large number of small isolated plants (mostly diesel) in the Outer Islands. In total, the PLN operated over 5,000 plants across Indonesia in 2010 of which over 4,500 were small diesel plants outside of Java. For further details about existing capacity and operations of the electricity sector, see information about the state-owned Indonesian electricity company Perusahaan Listrik Negara.

Non-renewable

Thermal

Thermal power is the largest source of power in Indonesia. There are different types of thermal power plants based on the fuel used to generate the steam such as coal, gas, diesel etc. About 85% of electricity consumed in Indonesia is generated by thermal power plants.

Bituminous coal or lignite

Existing

Note: IPP means independent power producer

Power station Location District Province Region Coordinates Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector NotesRefs
Tanjung Enim Muara EnimSouth SumatraSumatra 4 x 65 260 PT. PLNGovernment Boiler from Stein, Turbines from Rateau and generators from GEC Alstom[1]
Paiton ProbolinggoEast JavaJava-Bali 2 x 400 800 PT. PLNGovernment Boiler from ABB Combustion Engineering, Turbines and generators from Toshiba[2]
Ombilin SawahluntoWest SumatraSumatra 2 x 100 200 PT. PLNGovernment Boiler from Stein, Turbines and generators from GEC Alstom
Suralaya coal-firedSuralayaCilegonBantenJava-Bali4 x 400
3 x 600
3,400PT. Indonesia PowerGovernmentBoiler from Babcock & Wilcox Canada, Turbines from MHI Japan; generators from Mitsubishi Electric Co.
Suralaya Baru coal-fired Suralaya CilegonBantenJava-Bali 1 x 625 625PT. Indonesia PowerGovernment Boiler from Shanghai Co. Ltd, Turbines and generators from Shanghai Co. Ltd[3]
Paiton ProbolinggoEast JavaJava-Bali 2 x 670
2 x 610
1 x 850
2,300 PT. Paiton Energy (IPP) Private Boiler supplied by ABB, Turbines and Generators supplied by GE
Bangsri JeparaEast JavaJava-Bali 2 x 662 1,320 PT. Central Java Power (IPP) Private Boiler supplied by Babcock & Wilcox, Turbines and Generators supplied by Toshiba
Bangsri JeparaEast JavaJava-Bali 2 x 662 1,320 PT. Central Java Power (IPP) Private Boiler supplied by Mitsubishi Heavy Industry, Turbines and Generators supplied by Toshiba
Kanci Kulon CirebonWest JavaJava-Bali 1 x 660 660 PT. Cirebon Electric Power (IPP) Private Boiler, Turbines and Generators supplied by Doosan Heavy Industries and Construction Co., Ltd.
Karangkandri CilacapCentral JavaJava-Bali 2 x 300 600 PT. Sumber Segara Primadaya (IPP) Government Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Adipala CilacapCentral JavaJava-Bali 1 x 660 660 PT. Indonesia PowerGovernment Boiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd[4]
Sumur Adem IndramayuWest JavaJava-Bali 3 x 330 990 PT. PLNGovernment Boiler supplied by Babcock & Wilcox Beijing Co., Turbines and Generators supplied by Beijing Beizhong
Sukorejo PacitanEast JavaJava-Bali 2 x 315 630 PT. PLNGovernment Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Tarahan South LampungLampungSumatra 2 x 100 200 PT. PLNGovernment Boiler supplied by Jinan Co. Ltd, Turbines and Generators supplied by Wuhan Co. Ltd
Labuan PandeglangBantenJava-Bali 2 x 300 600PT. Indonesia PowerGovernment Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Labuhan Angin Central TapanuliNorth SumatraSumatra 2 x 115 230PT. PLNGovernment Boiler supplied by Foster Wheeler, Turbines and Generators supplied by Shanghai Turbine Co. Ltd.[5]
Lontar, Teluk Naga TangerangBantenJava-Bali 3 x 315 945PT. Indonesia PowerGovernment Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Pelabuhan Ratu SukabumiWest JavaJava-Bali 3 x 350 1050PT. Indonesia PowerGovernment Boiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd[6]
Sluke RembangCentral JavaJava-Bali 2 x 315 630 PT. PLNGovernment Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Air Anyir BangkaBangka BelitungSumatera 2 x 30 60 PT. BMP (IPP) Government
Total5018,630
Proposed or under construction
Power station Location District Province Region Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Remarks and plant coordinates
Tubanan, Kembang JeparaCentral Java Java-Bali 2 x 1000 2,000 PT. Bhumi Jati PowerPrivate [7]
Kramatwatu SerangBanten Java-Bali 2 x 1000 2,000 PT. Shenhua Guohua Pembangkitan Jawa BaliPrivate [8]
Central Java coal-fired (by the end of 2016) Ujungnegoro BatangCentral JavaJava-Bali 2 x 1000 2,000 PT. Bhimasena Power IndonesiaPrivate [9]
Kaliuntu TubanEast JavaJava-Bali 2 x 350 700 PT. PLNGovernment Boiler supplied by Babcock & Wilcox Beijing Co. Turbines and generators supplied by Beijing Beizhong
PamekasanEast JavaJava-Bali 2 x 100 200 PT. PLNGovernment
Bojonegara CilegonBantenJava-Bali 3 x 740 2,220PT. PLNGovernment
Cirebon CirebonWest JavaJava-Bali 2 x 660 1,320 PT. Bakrie PowerPrivate
Nusa PenidaBaliJava-Bali 2 x 100 200 PT. PLNGovernment
Anyer BantenJava-Bali 1 x 330 330 PT. PLNGovernment
Kuala Tanjung South SumatraSumatra 2 x 112 224 PT. Ranyza EnergiPrivate
Banjarsari LahatSouth SumatraSumatra 2 x 100 200 PT. Bukit Pembangkit InnovativePrivate
Banyuasin BanyuasinSouth SumatraSumatra 2 x 100 200 PT. Banyuasin Power EnergyPrivate
Baturaja Ogan Komering UluSouth SumatraSumatra 2 x 100 200 PT. Priamanaya Power EnergiPrivate
Gunung Raja Muara EnimSouth SumatraSumatra 2 x 150 300 PT. GH EMMIPrivate
Arahan Muara EnimSouth SumatraSumatra 4 x 600 2,400 PT. PLNGovernment
Bangko Tengah Muara EnimSouth SumatraSumatra 4 x 620 2,480 PT. BA & CHD (China)http://www.tender-indonesia.com/tender_home/innerNews2.php?id=12561&cat=CT0009Private
Tanjung Gundul BengkayangWest KalimantanKalimantan 2 x 100 200 PT. GCL IndotenagaGovernment - private
Tanjung TabalongSouth KalimantanKalimantan 2 x 55 110 PT. PLNGovernment
Total3417,264

Gas or liquid fuel

Power station Location District Province Region Coordinates Capacity per unit
(MW)
Capacity (MW) Operator Sector Refs
Bekasi West Java 130
Betara Lampung 70
Grati PasuruanEast JavaJava-Bali 3 x 100.75 GTPP; 3 x 100.75 SPP; 1 x 159.58 CCPP764 PT. Indonesia PowerGovernment [10] [11]
Gresik GresikEast JavaJava-Bali 4 x GTPP; 4 x SPP; 3 x CCPP2,255 PT. Pembangkitan Jawa BaliGovernment [12]
Tarumajaya BekasiWest JavaJava-Bali 2 x GTPP; 3 x CCPP 920 PT. Pembangkitan Jawa BaliGovernment
Muara Karang North JakartaDKI JakartaJava-Bali 5 x STPP; 1 x CCPP 1,208 PT. Pembangkitan Jawa BaliGovernment [13] [14]
Palembang Timur South Sumatra 150
PLTG SenipahSenipahKutai KartanegaraEast KalimantanKalimantan2x 46 GTG92PT. Kertanegara Energi PerkasaIPP
PLTG/MG Kalbar Peaker Parit Baru MempawahWest KalimantanKalimantan 100 100 PT. PLNGovernment 2019
Sengkang South Sulawesi 150
Tambak Lorok SemarangCentral JavaJava-Bali 6 x 109.65 GTPP; 2 x 50 SPP; 1 x 200 SPP; 2 x 188 CCPP1,334 PT. Indonesia PowerGovernment
Tanjung Priok North JakartaDKI JakartaJava-Bali 2 x 26 GTPP; 2 x 48.8 GTPP; 2 x 50 SPP; 6 x 130 CCGT; 2 x 200 CCGT 1,430 PT. Indonesia PowerGovernment
Senayan DieselSenayanJakartaDKI JakartaJava-Bali-6.2160361, 106.79532576 x 2.5215PT. Indonesia PowerGovernment
PLTU 400 MWCiwandanCilegonBantenJava-Bali5 x 80 STG400 MWPT. Krakatau Daya ListrikSOE
PLTGU 120 MWCiwandanCilegonBantenJava-Bali2 x 39 GTG; 1 x 43 STG120 MWPT. Krakatau Daya ListrikSOE
Total68 8,446

Renewable

Geothermal

Note: IPP means independent power producer

Power station Location District Province Region Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Remarks
Kamojang GarutWest JavaJava-Bali Unit I = 30
Unit II = 55
Unit III = 55
Unit IV = 60
Unit V = 35
235 PT. Indonesia PowerGovernment Unit IV 63 MW turbine capacity and 80 MVA generator capacity both from Fuji Electric, Kawasaki, Japan [15]
KamojangGarutWest JavaJava-Bali Unit I = 55 55 PT. Indonesia PowerGovernment
KamojangGarutWest JavaJava-Bali Unit II = 90
Unit III = 110
200 PT. Pertamina, Chevron Geothermal Indonesia, Ltd
(IPP)
Private Turbines Unit II = 81.3 MW & Unit III = 110 MW and Generators Unit II = 101.625 MVA & Unit III = 137.5 MVA both supplied by Fuji Electric, Kawasaki, Japan [16]
Parung Kuda SukabumiWest JavaJava-Bali 3 x 60 180 PT. Indonesia PowerGovernment Turbines @ 55 MW and Generators @ 55 MVA both supplied by Ansaldo Energia, Italy [17]
Parung Kuda SukabumiWest JavaJava-Bali 3 x 55 165 Chevron Geothermal Salak Ltd and Dayabumi Salak Pratama Ltd (IPP) Private Turbines @ 59.5 MW and Generators @ 74.375 MVA both from Fuji Electric, Kawasaki, Japan
Ulubelu TanggamusLampungSumatra 2 x 55 110 PT. PLNGovernment Turbines 2 x 55 MW and Generators 2 x 55 MVA both from Fuji Electric, Kawasaki, Japan [18]
Pengalengan BandungWest JavaJava-Bali 1 x 110
1 x 117
(1 x 127 by mid-2013)
227 PT. Pertamina and Magma Nusantara Ltd. (IPP) Private Turbines 110 MW & 117 MW and Generators 2 x 137.5 MVA both from Fuji Electric, Kawasaki, Japan [19]
Dieng BanjarnegaraCentral JavaJava-Bali 1 x 60 60 PT. Geo Dipa Energi (IPP) Private
Lahendong MinahasaNorth SulawesiSulawesi Unit I = 20
Unit II = 20
Unit III = 20
Unit IV = 20
80 PT. PLNGovernment
  • Unit I: turbines = 20 MW and generator = 25 MVA both from Alstom [20]
    * Unit II: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan [21]
    * Unit III: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan [22]
    * Unit IV: turbines = 20 MW and generator = 25 MVA both supplied by Fuji Electric, Kawasaki, Japan [23]
Sibayak KaroNorth SumatraSumatra 2 x 5.65 11.3 PT. Dizamatara Powerindo
(IPP)
Private Turbines @ 5.85 MW and Generators @ 6 MVA, 5.65 MW at PF 0.94 [24]
Patuha BandungWest JavaJava-Bali Unit 1 = 55 55
(by-mid 2014)
PT. Geo Dipa Energi
(IPP)
Private Turbines Unit 1 = 60 MW and Generator Unit 1 = 75 MVA both supplied by Toshiba [25]
Total191,344

Hydroelectric

Note: IPP means independent power producer

Power station Location District Province Region Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Remarks
Batang Agam AgamWest SumatraSumatra 3 x 3.5 10 PT. PLNGovernment Turbines @ 3.55 MW and Generators @ 3.95 MVA both supplied by Ebara
Maninjau AgamWest SumatraSumatra 4 x 17 68 PT. PLNGovernment Turbines @ 17.4 MW and Generators @ 20 MVA both supplied by Toshiba
Singkarak SolokWest SumatraSumatra 4 x 43.75 175 PT. PLNGovernment Turbines @ 43.75 MW supplied by VoestAlpine and Generators @ 52 MVA supplied by ELIN (now ANDRITZ Hydro)
Koto Panjang KamparRiauSumatra 3 x 38 114 PT. PLNGovernment Turbines @ 39.4 MW supplied by Kvaerner Boving and Generators @ 45 MVA supplied by ELIN (now ANDRITZ Hydro)
Tes Rejang LebongBengkuluSumatra 4 x 4 16 PT. PLNGovernment Turbines @ 4.7 MW supplied by Ansaldo Energia
Ujanmas AtasKepahiangBengkuluSumatra 3 x 70 210 PT. PLNGovernment Turbines @ 70 MW and Generators @ 86 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
SumberjayaWest LampungLampungSumatra 2 x 45 90 PT. PLNGovernment Turbines @ 46.4 MW and Generators @ 53 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
TanggamusWest LampungLampungSumatra 2 x 14 28 PT. PLNGovernment Turbines @ 14.2 MW and Generators @ 15.7 MVA both supplied by Toshiba
Silalahi DairiNorth SumatraSumatra 2 x 41 82 PT. PLNGovernment Turbines @ 41 MW and Generators @ 47.5 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
Sipansihaporas Central TapanuliNorth SumatraSumatra 1 x 33
1 x 17
50 PT. PLNGovernment Power Station 1 = Turbines 34 MW by Meiden, Japan and Generator 39 MVA by Toshiba
Power Station 2 = 17.6 MW Meiden, Japan and Generator 20 MVA by Toshiba [26]
Parmaksian Toba SamosirNorth SumatraSumatra 2 x 90 180 PT. Bajradaya Sentranusa
(IPP)
Private Turbines and Generators supplied by Dongfang Electric Corp. Ltd
Pintu Pohan Meranti Toba SamosirNorth SumatraSumatra 2 x 87 174 PT. PLNGovernment
Simorea AsahanNorth SumatraSumatra 4 x 71.50 286 PT. InalumPrivate Turbines @ 71.5 MW and Generators @ 80 MVA both supplied by Toshiba
Tangga AsahanNorth SumatraSumatra 4 x 79.25 317 PT. InalumPrivate Turbines @ 81.1 MW supplied by Hitachi Ltd. and Generators @ 90 MVA supplied by Mitsubishi Electric
Kota Buluh KaroNorth SumatraSumatra 3 x 15 45 PT. Wampu Electric Power
(IPP)
Private
Batang Merangin KerinciJambiSumatra 6 x 30 180 PT. PLNGovernment Turbines @ 30 MW and Generators @ 33.33 MVA [27]
Rajamandala CimahiWest JavaJava-Bali 4 x 175.18 701 PT. Indonesia PowerGovernment Turbines @ 175.18 MW supplied by Toshiba and Generators @ 194? MVA supplied by Mitsubishi Electric Co,.
Plered PurwakartaWest JavaJava-Bali 8 x 126 1,008 PT. Pembangkitan Jawa BaliGovernment Turbines @ 129.6 MW supplied by VoestAlpine and Generators @ 140 MVA supplied by ELIN (now ANDRITZ Hydro)
Jatiluhur PurwakartaWest JavaJava-Bali 6 x 31 186 PT. Jasa Tirta IIGovernment Turbines @ 32.3 MW supplied by NEYRPIC and Generators @ 35 MVA supplied by GEC Alsthom Jeumont
Mrica BanjarnegaraCentral JavaJava-Bali 3 x 60.3 181 PT. Indonesia PowerGovernment Turbines supplied by Boving and Generators supplied by ASEA
Karangkates MalangEast JavaJava-Bali 3 x 35 105 PT. Pembangkitan Jawa BaliGovernment
Wlingi MalangEast JavaJava-Bali 2 x 27 54 PT. Pembangkitan Jawa BaliGovernment
Tondano MinahasaNorth SulawesiSulawesi 1 x 4.44
1 x 4.50
1 x 5.44
14 PT. PLNGovernment
Tondano MinahasaNorth SulawesiSulawesi 1 x 17.20
1 x 19
36 PT. PLNGovernment
Bakaru PinrangSouth SulawesiSulawesi 2 x 63
1 x 65
191 PT. PLNGovernment
Soroako East LuwuSouth SulawesiSulawesi 3 x 65 195 INCOPrivate Turbines @ 67.3 MW supplied by Sulzer & GE and Generators @ 85 MVA supplied by Hitachi & VA Tech Hydro
Soroako East LuwuSouth SulawesiSulawesi 2 x 70 140 INCOPrivate Turbines @ 68.5 MW and Generators @ 80.6 MVA both supplied by Canadian General Electric
Soroako East LuwuSouth SulawesiSulawesi 2 x 66 132 INCOPrivate Turbines @ 63.7 MW and Generators @ 78 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro)
Pamona Utara PosoCentral SulawesiSulawesi 4 x 65 260 PT. Poso Energi
(IPP)
Private Turbines @ 66.66 MW and Generators @ 72.2 MVA
Aranio MartapuraSouth KalimantanKalimantan 3 x 10 30 PT. PLNGovernment Turbines @ 10.5 MW and Generators @ 11 MVA both supplied by Fuji Electric Co,. Ltd, Japan [28]
Total884,755

Pumped-storage hydroelectric

Currently under construction or planned:[29]

Power station Location District Province Region Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Remarks
Upper Cisokan pumped storage hydro (COD 2015) Cianjur
Cisokan river and Cirumamis river
Cianjur and
Bandung Barat
West JavaJava-Bali 4 x 260 MW pump turbine or
4 x 275 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLNGovernment
Matenggeng pumped storage hydro (COD 2020) Majenang
Cijolang river and Cimancing river
CiamisWest JavaJava-Bali 2 x 443 MW pump turbine or
2 x 460 MVA motor generator
886 MW pump turbine or
920 MVA motor generator
PT. PLNGovernment
Grindulu pumped storage hydro (COD 2021) Tegalombo PacitanEast JavaJava 4 x 260 MW pump turbine or
4 x 75 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLNGovernment [30]
Kali Konto pumped storage hydro (COD 2027) Bandar Kedungmulyo JombangEast JavaJava-Bali 4 x 260 MW pump turbine or
4 x 275 MVA motor generator
1,040 MW pump turbine or
1,100 MVA motor generator
PT. PLNGovernment
Lake Toba pumped storage hydro (COD 2020) Toba Toba SamosirNorth SumateraSumatera 4 x 110 MW pump turbine or
4 x 125 MVA motor generator
490 MW pump turbine or
500 MVA motor generator
PT. PLNGovernment
Total18 Units1364 MW pump turbine or
4,720 MVA motor generator

Wind

Power station Location District Province Region Capacity per unit
(MW)
Installed capacity
(MW)
Operator Sector Remarks
Sidrap SidenrengSouth SulawesiSulawesi 75 [31]
JenepontoJenepontoSouth SulawesiSulawesi72[32]

Solar

Power station Location District Province Region Installed capacity
(MW)
Operator Sector Remarks
Cirata floating solar Cirata DamSidenrengWest JavaJava-Bali 192 In development[33] [34]
Batam floating solarDuriangkang ReservoirBatamRiau IslandsRiau Islands2200In development[35] [36]

See also

References

  1. Large Scale Hydropower Plants in Indonesia by Indonesia Hydro Consult (http://www.arcgis.com/apps/OnePane/basicviewer/index.html?appid=65ed8bc862bd4af09c375d49f9d389d4)
  2. Small Scale Hydropower Plants in Indonesia by Indonesia Hydro Consult (http://www.arcgis.com/apps/OnePane/basicviewer/index.html?appid=2dffb753a63142b0bf7075389414daae)

Notes and References

  1. Web site: Coal-Fired Power Plants in Indonesia - other islands . https://archive.today/20121206005210/http://www.industcards.com/st-coal-indonesia.htm . dead . 6 December 2012 . Power Plants Around The World . Gallery . 25 January 2014 . 9 March 2014 .
  2. Web site: Paiton PLN Coal Power Plant Indonesia - GEO . Global Energy Observatory . 9 March 2014.
  3. Web site: Suralaya Coal Power Plant . Global Energy Observatory . 9 March 2014.
  4. Web site: Coal-Fired Power Plants in Indonesia - Java . https://archive.today/20140131210849/http://www.industcards.com/st-coal-indonesia-java.htm . dead . 31 January 2014 . Power Plants Around The World . Gallery . 25 January 2014 . 9 March 2014 .
  5. http://www.nwpower.cn/english/listshow.asp?mid=123&cuflag=1 Introduction to Indonesia Labuhan Angin 2X115MW CFB Power Plant Project
  6. http://www.thefreelibrary.com/Suppliers+of+power+plant+equipment+in+Indonesia.-a0182978967 Shanghai Electric Suppliers of power plant equipment in Indonesia
  7. https://bisnis.tempo.co/read/905600/pltu-jawa-4-akan-beroperasi-tahun-2021 Java 4 Coal Power Station Will Operate In 2021
  8. http://industri.bisnis.com/read/20171206/44/715668/pltu-jawa-7-bisa-selesai-lebih-cepat Java 7 Coal Power Station Will Finish Faster
  9. Consortium J-Power, Ithocu and Adaro is the bid winner of PLTU Central Java 2x1000 MW http://www.esdm.go.id/news-archives/electricity/46-electricity/5220-pltu-central-java-2x1000mw-operates-by-the-end-of-2016.html
  10. Web site: CCGT Plants in Indonesia . Power Plants Around The World . Gallery . 17 October 2012 . 9 March 2014.
  11. Web site: Grati CCGT Power Plant . Global Energy Observatory . 9 March 2014.
  12. Web site: Gresik CCGT Power Plant . Global Energy Observatory . 9 March 2014.
  13. Web site: Muara Karang CCGT Power Plant . Global Energy Observatory . 9 June 2014.
  14. Web site: Muara Karang Gas Power Plant Project . Tebeton . Project Fact Sheet . 9 June 2014 . https://web.archive.org/web/20150714200250/http://www.tebeton.com/images/PDFMuaraKarang.pdf . 14 July 2015 . dead . dmy-all .
  15. http://cdm.unfccc.int/filestorage/C/K/T/CKT1O68HVG9BLSQFXRW4N0YUED7I2Z/PDD%20Kamojang%20v9%20-%202011%2004%2005%20track.pdf?t=ODB8bTBva2U5fDDjua8q-pWW6zZKSujIuomR The geothermal steam turbine generator is produced by Fuji Japan Ltd
  16. Yokogawa Receives Control System Order for Geothermal Power Plant from Fuji Electric Systems http://www.yokogawa.com/pwr/news/news/pwr-new-fuj-001en.htm
  17. http://www.ansaldoenergia.com/PDF/Ref-Therm.pdf
  18. Web site: Home . fujielectric.com.
  19. http://www.fujielectric.com/company/tech_archives/pdf/47-04/FER-47-04-102-2001.pdf
  20. http://www.alstom.com/assetmanagement/DownloadAsset.aspx?ID=de9a2f93-8ac8-4c42-b691-8b0ad9493dfc&version=08c2eb05f541490ea45ce66b1924d7ba17.pdf&lang=2057 Lahendong (Indonesia) 20 MW geothermal power plant
  21. http://cdm.unfccc.int/filestorage/2/5/A/25AVY0G1SH3L8MNOTQEDR7J4CX6FK9/PDD.pdf?t=SHV8bTBwNmk3fDBgkcu-Wmzr9OOhnH-3li6P Lahendong II-20 MW Geothermal Project
  22. Yokogawa has won an order from Fuji Electric Systems to supply a CENTUM CS 3000 distributed control system for the Lahendong III http://www.yokogawa.com/pwr/news/news/pwr-new-fuj-001en.htm
  23. http://www.fujielectric.com/company/tech/pdf/56-04/FER-56-4-118-2010.pdf Table 1 Recent geothermal power generation projects
  24. PT Dizamatara Powerindo (DP) propose to set up a geothermal power project in the North Sumatera http://cdm.unfccc.int/filestorage/N/U/8/NU8G9XQS1O5LCIR6FBAEDY74VW02M3/PDD%20Version%201.pdf?t=bTd8bTBwaWprfDD5gL4a825pdo9Cef7rUJFs
  25. Marubeni and Toshiba Win FTK Order for Indonesia's Patuha Unit 1 Geothermal Power Plant http://www.marubeni.com/news/2011/111213e.html
  26. http://www.jica.go.jp/english/operations/evaluation/oda_loan/post/2010/pdf/indonesia03.pdf Sipansihaporas hydro (E/S) - JICA
  27. Web site: Archived copy . 2012-03-11 . 2016-03-03 . https://web.archive.org/web/20160303204558/http://xa.yimg.com/kq/groups/56882468/861692407/name/BulletinHydroPower032007.pdf . dead .
  28. The description on Riam Kanan Hydro Electric Project in Kalimantan (Indonesia)http://riamkanan.blogspot.com/2008/10/technical-data.html
  29. https://www.scribd.com/doc/85012854/RUPTL-2011-2020?olddoc=1 Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero)2011 - 2020
  30. Web site: Acceleration and Expansion of Indonesian Economic Development 2011-2025. Master Plan. 22 January 2012.
  31. Web site: Andi . Hajramurni . 2018-07-02 . Jokowi inaugurates first Indonesian wind farm in Sulawesi . 2020-02-19 . The Jakarta Post . en.
  32. Web site: Tampubolon . Agus Praditya . 2019-07-17 . Simamora . Pamela . Wind Farm is Coming to Indonesia, and The Power Sector isn't Ready . live . https://web.archive.org/web/20210830104845/https://iesr.or.id/en/sidrap-windfarm-is-coming-to-indonesia . 30 August 2021 . 2021-08-30 . IESR . en-US.
  33. Web site: Garanovic . Amir . 2023-03-07 . Chinese company to supply floating system for Indonesia’s 192MW floating solar farm . 2023-07-15 . Offshore Energy . en-US.
  34. Web site: Cirata Floating Solar Photovoltaic . 2023-07-15 . masdar.ae . en.
  35. News: Correspondent . Wahyudi SoeriaatmadjaIndonesia . 2023-07-07 . Work on Indonesia-Singapore floating solar farm in Batam to start next year . en . The Straits Times . 2023-07-15 . 0585-3923.
  36. News: Sunseap signs MoU to build floating solar farm in Batam . Data Centre Dynamics .