The following page lists power stations in Costa Rica. Most of them are managed by Instituto Costarricense de Electricidad.

Installed generating capacity and production

Costa Rica had an estimated installed generating capacity of 3,039 MW in 2012 and produced an estimated 10.05 billion kWh in 2012. According to La Nación Costa Rica in 2014 had an installed capacity of 2,732 MW with a peak consumption of 1,604 MW.

Geothermal

Geothermal power plants with a nameplate capacity > 100 MW.

There are further geothermal power plants with a smaller capacity.

Hydroelectric

Hydroelectric power plants with a nameplate capacity > 30 MW.

NameCapacity (MW)River/Lake
Angostura210Reventazón
Cachí102Reventazón
Corobici180Arenal
La Garita30Virilla
La Joya50Reventazón
Peñas Blancas38Peñas Blancas
Pirrís134Pirrís
Sangregado157Arenal
Reventazón305Reventazón
Río Macho120Macho
Sandillal32Arenal
Toro II65Toro
Ventanas-Garita97Virilla

There are further hydroelectric power plants with a smaller capacity. The proposed 630 MW El Diquís dam was not built.

Thermal

Thermal power plants with a nameplate capacity ≥ 200 MW.

There are further thermal power plants with a smaller capacity.

Wind

Currently, there are 13 wind farms in Costa Rica. The 3 wind farms with the biggest capacity are:

NameCapacity (MW)Turbines
Chiripa49.533
La Gloria49.555
Orosi5025

Exhaustive list

This list includes all known power plants of any kind of fuel source in Costa Rica, some minor power plants might be missing, and locations and coordinates must be provided for minor projects, also included are recently closed or decommissioned plants, as well as projects under construction as of 2020.

NameTypeCapacity (MW)LocationCoordinatesOperator, Notes
Arenalhydroelectric157.39Guanacaste10.4754°N -84.999°WICE (Opened 4 December 1979)[1] [2]
Aguas Zarcashydroelectric14.47La Palmera, Aguas Zarcas, San Carlos, Alajuela10.4241°N -84.3647°WCOOPELESCA
Angosturahydroelectric210.009.87°N -83.6406°WICE
Cachíhydroelectric102.009.84°N -83.8042°WICE
Chiripawind49.50Tilarán10.4431°N -84.9172°WAccione, BOP 20 years, then ICE. 33 towers [3]
Chocosuela Ihydroelectric8.00Alajuela10.2943°N -84.4627°WCOOPELESCA [4]
Chocosuela IIhydroelectric10.00Alajuela10.3266°N -84.4844°WCOOPELESCA [5]
Chocosuela IIIhydroelectric5.00Alajuela10.3471°N -84.4912°WCOOPELESCA [6]
Chucáshydroelectric, Tárcoles River50.00Balsa, Atenas, San José9.9322°N -84.383°WP.H. Chucás, will transfer to ICE 20 years later.[7]
Corobicíhydroelectric180.0010.4695°N -85.0763°WICE
El Diquíshydroelectric0.009.0822°N -83.2956°WICE, cancelled project
Garabitothermal, bunker200.0010.044°N -84.7601°WICE
La Garitahydroelectric30.009.9891°N -84.3409°WICE
La Joyahydroelectric50.009.8541°N -83.6868°WICE
Moínthermal, diesel0.009.9935°N -83.1°WICE, was 266MW, closed 2016 after Reventazón.[8]
Peñashydroelectric38.0010.3914°N -84.438°WICE
Pirríshydroelectric134.009.6427°N -84.1023°WICE
Sangregadohydroelectric157.0010.4755°N -84.9989°WICE
Reventazónhydroelectric305.0010.0885°N -83.5709°WICE
Río Machohydroelectric120.009.7757°N -83.8414°WICE
Sandillalhydroelectric31.9710.4645°N -85.1034°WICE, opened 1992
Dengohydroelectric174.0110.4696°N -85.0764°WICE, opened 1982
Toro Ihydroelectric27.0010.2618°N -84.2651°WICE
Toro IIhydroelectric65.0010.2815°N -84.2631°WICE
Toro IIIhydroelectric48.0010.3351°N -84.247°WICE
Ventanas-Garitahydroelectric97.009.9342°N -84.3594°WICE
Las Pailas Igeothermal35.00Guanacaste10.7567°N -85.3595°WBCIE-ICE [9]
Las Pailas IIgeothermal55.00Guanacaste10.7578°N -85.3464°WICE
Río Lajashydroelectric11.00Turrialba9.9426°N -83.6332°W Hidroelectrica Rio Lajas S.A.,[10] 9.9546°N -83.6496°W
Sigifredo Solís Solís Hydroelectric Centerhydroelectric26.00San Ramón, Alajuela10.3651°N -84.6297°WCONELECTRICAS R.L.
San Lorenzo Hydroelectric Centerhydroelectric17.73San Ramón, Alajuela10.3124°N -84.5469°WCONELECTRICAS R.L.[11]
Los Negros Hydroelectric Planthydroelectric17.00Aguas Claras, Upala, Alajuela10.8538°N -85.205°WESPH S.A. and GELA-BC Marshall [12]
Los Negros II Hydroelectric Planthydroelectric28.00Cuatro Bocas, Aguas Claras, Upala, Alajuela10.8845°N -85.1865°WESPH S.A.
Balsa Inferior Hydroelectric Planthydroelectric37.50Florencia, San Carlos10.3022°N -84.5247°WCNFL
Belén hydroelectric10.50Pozos, Santa Ana9.9608°N -84.2126°WCNFL
Brasilhydroelectric27.00Brasil, Santa Ana9.9405°N -84.2349°WCNFL [13]
Cotehydroelectric6.80Tilarán10.5558°N -84.9149°WCNFL
Daniel Gutiérrezhydroelectric21.00Los Ángeles, San Ramón10.2541°N -84.5191°WCNFL
El Encantohydroelectric8.60Acapulco y Pitahaya, Puntarenas10.1516°N -84.7785°W CNFL [14] 2009- [15] Reservoir at 10.1825°N -84.7426°W
Electrionahydroelectric5.80Uruca, San José9.9662°N -84.1626°WCNFL
Río Segundohydroelectric1.00Río Segundo, Alajuela9.9997°N -84.1799°WCNFL [16]
Ventanashydroelectric10.00Guácima, Alajuela9.9254°N -84.3043°WCNFL
Planta Eólica Valle Centralwind15.30Salitral, Santa Ana9.892°N -84.1987°WCNFL [17]
Nuestro Amohydroelectric0.009.9384°N -84.2655°WCNFL [18] Destroyed in 2010, reservoir is empty. 8.80 MW capacity.
Miravalles Solar Parksolar0.9410.7185°N -85.1795°WICE,[19] opened 2012 4300 panels rated 235w
Borinquen (project)geothermal0.00ICE, JICA
Miravalles IIIgeothermal26.0010.7179°N -85.1814°WICE
Vientos del Estewind12.00Tilarán10.5005°N -84.9634°WEcoenergía [20]
Parque Solar Juanilamasolar5.00Belen, Carrillo, Guanacaste10.393°N -85.5883°WCOOPEGUANACASTE [21] [22]
Parque Eólico Cacaowind6.85Cacao, Santa Cruz, Guanacaste10.2988°N -85.5536°WCOOPEGUANACASTE 60 GWh [23] (Under construction)
Parque Eólico Río Naranjowind9.00Río Naranjo, Bagaces, Guanacaste10.6901°N -85.1053°W COOPEGUANACASTE,[24] approximated coordinates
Solid Waste Gasification (project)gasification, waste-to-energy0.00 (8.00)Belen, Carrillo, GuanacasteCOOPEGUANACASTE [25] [26] (Under construction, 9.00MW - 1.00MW operation)
Bijaguahydroelectric17.58Bijagua, Upala, Alajuela10.7677°N -85.039°WCOOPEGUANACASTE [27] [28]
Canaletehydroelectric17.50Bijagua, Upala, Alajuela10.7652°N -85.0389°WCOOPEGUANACASTE [29]
Planta Eólica Guanacastewind50.00Bagaces, Guanacaste10.7264°N -85.2674°WICE [30]
Central Hidroeléctrica Cubujuquíhydroelectric22.40Horquetas, Sarapiquí, Heredia10.2856°N -83.948°WCOOPELESCA [31]
Central Hidroeléctrica Platanarhydroelectric15.50San Carlos, Alajuela10.4056°N -84.4431°WCOOPELESCA
Central Hidroeléctrica La Esperanzahydroelectric5.51La Tigra, San Carlos, Alajuela10.3314°N -84.5802°WCOOPELESCA
Toritohydroelectric, Reventazón50.00Pavones, Turrialba, Cartago9.9495°N -83.6225°WGas Natural Fenosa, 2015 then BOT to ICE [32] [33]
Caño Grande Ihydroelectric, Caño River2.50Venecia, San Carlos, Alajuela10.3734°N -84.282°WHidro Venecia
Caño Grande IIhydroelectric, Caño River0.25Venecia, San Carlos, AlajuelaHidro Venecia
Caño Grande IIIhydroelectric, Caño River3.00Venecia, San Carlos, AlajuelaHidro Venecia
El Embalsehydroelectric2.00San Carlos, Alajuela1997
Santa Rufinahydroelectric0.32Sarchí, Alajuela
Hospitalhydroelectric1.60San Carlos, Alajuela
Chimurria (project)hydroelectric0.00 (5.20)Upala, Alajuela
Aguas Zarcas Superior (project)hydroelectric0.00 (8.05)San Carlos, Alajuela
San Joaquín-Los Santos (project)hydroelectric0.00 (29.00)Dota San José and Tarrazú San José
Choco Florencia (project)hydroelectric0.00 (54.00)San Carlos, Alajuela and San Ramón, Alajuela
Torito (project)hydroelectric0.00 (9.00)Sarchí, Alajuela
Campos Azuleswind14.00Tilarán, Guanacaste[34]
Altamirawind14.00Tilarán, Guanacaste[35]
Vientos de Miramarwind14.00Liberia, Guanacaste[36]
Vientos de la Perlawind14.00Liberia, Guanacaste[37]
Los Santoswind12.00San Cristóbal, Desamparados9.7771°N -83.9958°W[38]
Mogotewind21.00Bagaces, Guanacaste[39]
Tilawindwind21.00Tilarán, Guanacaste10.4854°N -85.0049°W[40]
Orosíwind50.00Liberia, Guanacaste10.8632°N -85.4321°W(25 × 2MW) [41]
San Rafael (closed)hydroelectric0.00 (0.30)Naranjo, Alajuela[42] [43]
Parque Solar Cooperativosolar5.00Santa Rosa, Pocosol, Alajuela10.5933°N -84.5118°WCOOPELESCA [44]
Tuishydroelectric (Tuis river)1.89Turrialba, Cartago9.8319°N -83.5719°WJASEC [45]
Birrishydroelectric (Tuis river)1.89Turrialba, Cartago9.8319°N -83.5719°WJASEC
Barro Moradohydroelectric (Tuis river)1.89Agua Caliente, Cartago9.8319°N -83.5719°WJASEC [46]
Tejona (2002)wind20.00 Santa Rosa, Tilarán10.5228°N -84.9909°WICE (30x0.660), VESTAS V42-660[47]
Poás Ihydroelectric10.0752°N -84.2359°WLosko S.A.[48]
Poás IIhydroelectricLosko S.A.
Don Pedrohydroelectric10.2883°N -84.1712°W
PESAwind10.5259°N -84.9856°WCMI Energía[49]
Doña Juliahydroelectric[50]
Peñas Blancashydroelectric38.17Peñas Blancas, San Ramón, Alajuela10.3841°N -84.5793°W[51]

See also

Notes and References

  1. Web site: Planta Arenal cumple 40 años de generar electricidad renovable . 19 December 2020 . 4 December 2019.
  2. News: Jiménez B . Eillyn . Arenal, el mayor complejo energético de Costa Rica, llega a 40 años . 19 December 2020 . La Nación . 4 December 2020 . es.
  3. Web site: PLANTA EÓLICO Chiripa . 19 December 2020.
  4. Web site: Chocosuela Carbon Ingeniería Proyectos en Costa Rica. 2020-12-19. www.carboncr.com. en-gb.
  5. Web site: Chocosuela II Carbon Ingeniería Proyectos en Costa Rica. 2020-12-19. www.carboncr.com. en-gb.
  6. Web site: Chocosuela III Carbon Ingeniería Proyectos en Costa Rica. 2020-12-19. www.carboncr.com. en-gb.
  7. Web site: Condenan al ICE a pagar más de ¢75 mil millones a proyecto hidroeléctrico Chucás. 2020-12-19. CRHoy.com. es.
  8. Web site: Tenorio. Luis Valverde. Después de 39 años, planta térmica Moín deja de operar, confirma ICE. 2020-12-19. ameliarueda.com. es.
  9. Web site: Las Pailas Carbon Ingeniería Proyectos en Costa Rica. 2020-12-19. www.carboncr.com. en-gb.
  10. Web site: Hidroelectrica Rio Lajas - POWERHOUSE. 2020-12-19. www.hidrolajas.com.
  11. Web site: Central Hidroeléctrica San Lorenzo .
  12. Web site: Planta Los Negros, lista en enero. 2020-12-19. La Nación, Grupo Nación. es-LA.
  13. Web site: Furia del Virilla dañó cuatro hidroeléctricas de la CNFL. 2020-12-19. La Nación, Grupo Nación. es-LA.
  14. Web site: El Encanto Carbon Ingeniería Proyectos en Costa Rica. 2020-12-19. www.carboncr.com. en-gb.
  15. Web site: Costa Rica inaugura pequeña central hidroeléctrica. 2020-12-19. Scribd. en.
  16. Web site: Plan de Expansión de la Generación Eléctrica Período 2014-2035.
  17. Web site: Fernández. Juan. Proyecto de CNFL genera energía eólica más cara de Costa Rica. 2020-12-19. La Nación, Grupo Nación. es-LA.
  18. Web site: Informe Final de Gestión Ing. Teófilo de la Torre Arguello.
  19. Web site: Costa Rica inaugura la mayor planta de energía solar en el Istmo. 2020-12-19. www.fao.org.
  20. Web site: Vientos del Este Carbon Ingeniería Proyectos en Costa Rica. 2020-12-19. www.carboncr.com. en-gb.
  21. Web site: Generación de Energía - COOPEGUANACASTE, R.L.. 2020-12-19. www.coopeguanacaste.com.
  22. Web site: Parque Solar Juanilama - COOPEGUANACASTE, R.L.. 2020-12-19. www.coopeguanacaste.com. es-es.
  23. Web site: Generación de Energía - COOPEGUANACASTE, R.L.. 2020-12-19. www.coopeguanacaste.com.
  24. Web site: Generación de Energía - COOPEGUANACASTE, R.L.. 2020-12-19. www.coopeguanacaste.com.
  25. Web site: Generación de Energía - COOPEGUANACASTE, R.L.. 2020-12-19. www.coopeguanacaste.com.
  26. Web site: Municipalidades y Coopeguanacaste, R.L. firman convenio sobre gasificación de los desechos sólidos. 2020-12-19. www.guanacastealaaltura.com. es-es.
  27. Web site: Generación de Energía - COOPEGUANACASTE, R.L.. 2020-12-19. www.coopeguanacaste.com.
  28. Web site: Bijagua Carbon Ingeniería Proyectos en Costa Rica. 2020-12-19. www.carboncr.com. en-gb.
  29. Web site: Generación de Energía - COOPEGUANACASTE, R.L.. 2020-12-19. www.coopeguanacaste.com.
  30. Web site: Guanacaste Carbon Ingeniería Proyectos en Costa Rica. 2020-12-19. www.carboncr.com. en-gb.
  31. Web site: Electricidad. 2020-12-19. Coopelesca. es.
  32. Web site: Hidroeléctricos Construidos Edificadora Beta. 2020-12-19. es-ES.
  33. Web site: Central Hidroeléctrica Torito se inauguró hoy en Turrialba. 2020-12-19. www.larepublica.net. es.
  34. Web site: Proyecto Eólico Campos Azules Edificadora Beta. 2020-12-19. es-ES.
  35. Web site: Proyecto Eólico Altamira Edificadora Beta. 2020-12-19. es-ES.
  36. Web site: Proyecto Eólico Vientos de Miramar Edificadora Beta. 2020-12-19. es-ES.
  37. Web site: Proyecto Eólico Vientos de la Perla Edificadora Beta. 2020-12-19. es-ES.
  38. Web site: Complejo Eólico Los Santos Edificadora Beta. 2020-12-19. es-ES.
  39. Web site: Proyecto Eólico Mogote Edificadora Beta. 2020-12-19. es-ES.
  40. Web site: Proyecto Eólico Tilawind Edificadora Beta. 2020-12-19. es-ES.
  41. Web site: Proyecto Eólico Orosí Edificadora Beta. 2020-12-19. es-ES.
  42. Web site: ICE limita generación de energía a empresas privadas. 2020-12-19. La Nación, Grupo Nación. es-LA.
  43. Web site: Clientes Hidro Mantenimiento. 2020-12-19. hm.cr.
  44. Web site: 2019-03-30. San Carlos inaugura su primer parque solar. 2020-12-19. Conelectricas. es-ES.
  45. Web site: Jasec compra planta hidroeléctrica privada Tuis. 2020-12-19. La Nación, Grupo Nación. es-LA.
  46. Web site: Jasec compra planta hidroeléctrica privada Tuis.
  47. Web site: PLANTA EÓLICA TEJONA.
  48. Web site: .:: STCGRUPO :: Arquitectura, Ingeniería y Construcción ::.. 2020-12-19. www.stcgrupo.com.
  49. Web site: ICE obliga a apagar plantas privadas de generación limpia y barata. 2020-12-19. La Nación, Grupo Nación. es-LA.
  50. Web site: Acerca de ACOPE . 19 December 2020 . es.
  51. News: Hidroeléctrica Peñas Blancas pasa a formar parte del ICE . 27 December 2020.