Non-renewable

Coal-based

Station Name in Chinese Capacity (MW) Operational units and (type) Under construction unitsReference
Guang'an Power Station 广安电厂2,400 4*300MW, 2*600MW [1] [2]
Tianming Power Station天明电厂2,0002*1,000MW[3]
China Coal Energy Guangyuan Power Station中煤广元电厂2,0002*1,000MW[4]
Jiangyou Power Station 江油电厂1,260 2*300MW, 2*330MW [5]
Luzhou Power Station 泸州电厂1,200 2*600MW [6]
Jintang Power Station 金堂电厂 1,200 2*600MW [7]
Fuxi Power Station福溪电厂1,2002*600MW [8]
Gongxian Power Station珙县电厂1,2002*600MW [9]
Baima Power Station 白马电厂600 1*600MW
Huayinshan Power Station 华蓥山发电厂600 2*300MW [10] [11]

Gas-based

Station Name in Chinese CoordinatesCapacity (MW) Operational units and (type) Under construction unitsReference
Ziyang Natural Gas Power Station资阳燃气电厂1,4002*700MW[12] [13]
Guangyuan Natural Gas Power Station广元燃机工程1,4002*700MW[14]
Luzhou Natural Gas Power Station泸州燃机工程1,4002*700MW[15]
Anju Natural Gas Power Station安居燃气发电1,4002*700MW[16]
Dazhou Natural Gas Power Station 达州燃气电厂 7002*350MW

Renewable

Hydroelectric

The installed conventional hydropower capacity in Sichuan province has broken through 31,000MW in present.[17] By 2020, The hydropower installed capacity in Sichuan province will increase to over 90,000 MW, accounting for a quarter share of whole Chinese hydropower installed capacity.

Conventional

Station Name in Chinese RiverTotal capacity (MW) Dam height (meters)StatusUnits Reference
Xiangjiaba Hydro Power Station向家坝水电站Yangtze (Jinsha)7,750 161 Operational 8*800MW, 3*450MW
Xiluodu Hydro Power Station溪洛渡水电站Yangtze (Jinsha)13,860 278 Operational 18*770MW
Baihetan Hydro Power Station白鹤滩水电站Yangtze (Jinsha)16,000 289 Operational 16*1,000MW
Wudongde Hydro Power Station乌东德水电站Yangtze (Jinsha)10,200270Operational 12*850MW
Yinjiang Hydro Power Station银江水电站Yangtze (Jinsha)390 73Under construction6*65MW[18]
Jinsha Hydro Power Station金沙水电站Yangtze (Jinsha)560 66Operational 4*140MW[19]
Guanyinyan Hydro Power Station观音岩水电站Yangtze (Jinsha)3,000 159 Operational5*600MW
Tuoding Hydro Power Station拖顶水电站 Jinsha2,060 In prep
Rimian Hydro Power Station日冕水电站 Jinsha2,700 In prep
Baiqiu Hydro Power Station白丘水电站 Jinsha1,500 Proposed
Enan Hydro Power Station俄南水电站 Jinsha900 Proposed
Xulong Hydro Power Station旭龙水电站 Jinsha2,400 213Under Construction4*600MW[20]
Changbo Hydro Power Station昌波水电站Jinsha826 45 Under Construction[21]
Suwalong Hydro Power Station苏洼龙水电站Jinsha1,200 112Operational4*300MW[22]
Batang Hydro Power Station巴塘水电站Jinsha750 69Under Construction[23]
Lawa Hydro Power Station拉哇水电站Jinsha2,000 239Under Construction
Yebatan Hydro Power Station叶巴滩水电站Jinsha2,440 217 Under Construction4*510MW, 2*200MW[24]
Boluo Hydro Power Station波罗水电站Jinsha960 Proposed
Yanbi Hydro Power Station岩比水电站Jinsha300 Proposed
Gangtuo Hydro Power Station岗托水电站Jinsha1100 Proposed
Tongzilin Hydro Power Station桐子林水电站Yalong60071.3Operational 4*150MW
Ertan Hydro Power Station二滩水电站Yalong3,300 240Operational 6*550MW[25]
Guandi Hydro Power Station官地水电站Yalong2,400 168Operational4*600MW
Jinping II Hydro Power Station锦屏二级水电站Inlet, Outlet Yalong4,800 34 Operational 8*600MW
Jinping I Hydro Power Station锦屏一级水电站Yalong3,600 305Operational6*600MW
Kala Hydro Power Station卡拉水电站Yalong1,080 128Under construction
Yangfanggou Hydro Power Station杨房沟水电站Yalong1,500 158 Operational
Mengdigou Hydro Power Station孟底沟水电站Yalong2,400 198Under construction 4*600MW[26]
Lenggu Hydro Power Station楞古水电站Yalong2,718 174In prep
Yageng I Hydro Power Station牙根一级水电站Yalong300 In prep3*100MW[27]
Yageng II Hydro Power Station牙根二级水电站Yalong990In prep
Lianghekou Hydro Power Station两河口水电站Yalong3,000 293Under Construction 6*500MW
Gongbagou Hydro Power Station龚坝沟水电站Yalong500 Proposed
Gongke Hydro Power Station共科水电站Yalong400 Proposed
Xinlong Hydro Power Station新龙水电站Yalong500 Proposed
Yingda Hydro Power Station英达水电站Yalong500 Proposed
Tongha Hydro Power Station通哈水电站Yalong200 Proposed
Geni Hydro Power Station格尼水电站Yalong200 Proposed
Ada Hydro Power Station阿达水电站Yalong250 Proposed
Reba Hydro Power Station热巴水电站Yalong250 Proposed
Renqingling Hydro Power Station仁青岭水电站Yalong300 Proposed
Angu Hydro Power Station安谷水电站Dadu772 40.7Operational4*190MW, 1*12 [28]
Shawan Hydro Power Station沙湾水电站Dadu480 Operational 4*120MW[29]
Tongjiezi Hydro Power Station铜街子水电站Dadu600 82Operational 4*150MW
Gongzui Hydro Power Station龚嘴水电站Dadu770 85.5Operational 7*110MW
Shaping II Hydro Power Station沙坪二级水电站Dadu34863Operational 6*58MW
Shaping I Hydro Power Station沙坪一级水电站Dadu360Under construction6*60MW[30]
Zhengtouba II Hydro Power Station枕头坝二级水电站Dadu300Under construction
Zhengtouba I Hydro Power Station枕头坝一级水电站Dadu720Operational4*180MW
Yongle Hydro Power Station永乐级水电站Inlet, Outlet Dadu58Operational
Shenxigou Hydro Power Station深溪沟水电站Dadu66049.5Operational 4×165MW
Pubugou Hydro Power Station瀑布沟水电站Dadu3,600186 Operational 6*600MW
Laoyingyan I Hydro Power Station老鹰岩一级水电站Dadu300In prep[31]
Laoyingyan II Hydro Power Station老鹰岩二级水电站Dadu420In prep[32]
Longtoushi Hydro Power Station龙头石水电站Dadu70072.5Operational4*175MW
Dagangshan大岗山水电站Dadu2,600210Operational 4*650MW
Yingliangbao Hydro Power Station硬梁包水电站Inlet, Outlet Dadu1,160 (run-of-the-river, 15.1 km tunnel) Under construction 4*270MW, 1*36MW[33]
Luding Hydro Power Station泸定水电站Dadu92085.5 Operational4*230MW
Huangjinping Hydro Power Station黄金坪水电站Dadu85095.5 Operational 4*200MW, 2*25MW [34]
Changheba Hydro Power Station长河坝水电站Dadu2,600 240 Operational 4*650MW
Houziyan Hydro Power Station猴子岩水电站Dadu1,700 223.5 Operational 4*425MW
Badi Hydro Power Station巴底水电站Dadu680 112Proposed
Jinchuan Hydro Power Station金川水电站Dadu860 111.5Under construction 4*215MW
Shuangjiankou Hydro Power Station双江口水电站Dadu2,000 314Under construction4*500MW
Busigou Hydro Power Station卜寺沟水电站Dadu360 130Proposed
Dawei Hydro Power Station达维水电站Dadu270 107Proposed2*135MW
Bala Hydro Power Station巴拉水电站Dadu700 220 Under construction
Xiaerjia Hydro Power Station下尔呷水电站Dadu540 Proposed
Kajiwa Hydro Power Station卡基娃水电站Muli452.4 171Operational4*110MW
Lizhou Hydro Power Station立洲水电站Muli355 132.5Operational3*115MW, 1*10MW
Shangtongba Hydro Power Station上通坝水电站Muli240 Operational3*80MW
Muli Shawan Hydro Power Station木里河沙湾水电站Muli280 Operational
Zipingpu Hydro Power Station紫坪铺水电站Min760 156Operational4*190MW
Taipingyi Hydro Power Station太平驿水电站Min260 Operational4*65MW
Futang Hydro Power Station福堂水电站Min360 Operational4*90MW
Qianwei Hydro Power Station犍为航电枢纽Min500.4 Operational9*55.6MW
Longxikou Hydro Power Station龙溪口航电枢纽Min480 Under Construction9*53.3MW
Baozhusi Hydro Power Station宝珠寺水电站Bailong700 132Operational4*175MW
Qiaoqi Hydro Power Station硗碛水电站Baoxinghe240 125Operational3*80MW
Yele Hydro Power Station冶勒水电站Nanyahe240 124.5Operational
Jinwo Hydro Power Station金窝水电站Tianwanhe280 124.5Operational2*130MW
Renzonghai Hydro Power Station仁宗海水电站Tianwanhe240 56Operational
Xiaotiandu Hydro Power Station小天都水电站Wasigou240 39 Operational
Tingzikou Hydro Power Station亭子口水电站Jialing1,100 116 Operational4*275MW
Dusong Hydro Power Station独松水电站Big Jinchuan1,360 111.5Proposed
Maoergai Hydro Power Station毛尔盖水电站Heishui420 147 Operational3*140MW
Jianke Hydro Power Station剑科水电站Maoergai24683 Under construction3*82MW
Jiangbian Hydro Power Station江边水电站Jiulong330 Under construction3*110MW
Xigu Hydro Power Station溪古水电站Jiulong 249Under construction3*83MW
Guanzhou Hydro Power Station关州水电站Xiaojinchuan240 Under construction3*80MW
Jiniu Hydro Power Station吉牛水电站Geshizha240 Operational2*120MW
Chuosijia Hydro Power Station绰斯甲水电站Chuosijia 392Under construction
Quxue Hydro Power Station去学水电站Shuoqu 246164.2Under construction2*123MW
Guwa Hydro Power Station古瓦水电站Shuoqu222150Operational3*74MW
Gungqiao Hydro Power Station锅浪跷水电站Tianquanhe220186.3Under construction3*70MW
*Jingping II Hydro Power Station is a Run-of-the-river type of power station. There are 4 water tunnels which are 16.6 km long in average each to divert the water through the Jingping mountains. The deepest point of the tunnel is 2,525 meters from the top of mountain.

Pumped-storage

Wind

Notes and References

  1. Web site: 四川广安发电有限责任公司. 2020-12-09. dead . https://web.archive.org/web/20100405234201/http://ccpi.gov.cn/sc/qyfw/htm/2003_12_02/index.htm. 2010-04-05. ccpi.gov.cn.
  2. Web site: 四川广安电厂240万千瓦规划装机容量全投产. 2007-07-05. China Radio International.
  3. Web site: 四川首座百万千万级火电厂第2台机组投运 - 北极星火力发电网. 2021-11-07. news.bjx.com.cn.
  4. Web site: 中煤广元燃煤发电项目开工 项目总投资72.72亿元-广元市人民政府 . 2024-05-24 . www.cngy.gov.cn.
  5. Web site: 受灾严重的省属企业 江油电厂全面复发电. 2009-03-04 . dead . https://web.archive.org/web/20110707050832/http://sichuan.scol.cn/myxw/20090304/20093472809.htm . 2011-07-07. sichuan.scol.cn.
  6. Web site: 四川泸州电厂投运. 2008-02-28. dead . https://web.archive.org/web/20120313052146/http://power.in-en.com/html/power-1343134389166313.html. 2012-03-13. power.in-en.com.
  7. Web site: 国电成都金堂电厂正式投入运营. 2007-09-25. dead . https://web.archive.org/web/20101230203857/http://www.in-en.com/power/html/power-200720070925126139.html . 2010-12-30. power.in-en.com.
  8. News: 投资46亿 四川中电(宜宾)福溪电厂600MW火电项目开工(组图). https://web.archive.org/web/20120307192114/http://news.163.com/09/1118/17/5ODVVKM8000120GR.html. dead. 2009-11-18. 2012-03-07. 163.com.
  9. Web site: 华电珙县电厂火电工程开建 .
  10. Web site: 国电—四川华蓥山电厂 - 煤炭通 MeiTanTong.com . 2010-10-08 . dead . https://web.archive.org/web/20110714070653/http://www.meitantong.com/xueyuan/xiangguanqiye/2009/1123/17731.html . 2011-07-14 .
  11. Web site: Archived copy . 2010-10-08 . dead . https://web.archive.org/web/20110707014642/http://sepc.cpnn.com.cn/template/WebRoot3/xianshi.jsp?nid=09072011053206169481 . 2011-07-07 .
  12. Web site: 2×700MW!川投集团资阳燃气电站开工 - 北极星火力发电网 . 2022-04-10 . news.bjx.com.cn.
  13. Web site: 我国西南地区首个9H级燃气电站项目投产-新华网 . 2024-06-18 . www.sc.news.cn.
  14. Web site: 2×700MW!四川能投广元燃机工程桩基础施工全面启动-北极星火力发电网 . 2022-07-02 . news.bjx.com.cn.
  15. Web site: 2×700MW!川投四川泸州天然气发电项目开工-北极星火力发电网 . 2023-08-15 . news.bjx.com.cn.
  16. Web site: https://power.in-en.com/html/power-2445217.shtml . 2024-03-18 . power.in-en.com.
  17. News: 占全国1/4四川水电装机容量未来十年翻一番. https://web.archive.org/web/20120304071315/http://news.china.com.cn/rollnews/2010-09/10/content_4239307.htm. dead. 2010-09-10. 2012-03-04. news.china.com.cn.
  18. Web site: 银江水电站大坝已修筑50米高_要闻_新闻中心_长江网_cjn.cn . 2024-07-19 . news.cjn.cn.
  19. Web site: 金沙水电站4号机组通过验收 - 北极星水力发电网. 2021-10-10. news.bjx.com.cn.
  20. Web site: 总装机240万千瓦!金沙江旭龙水电站开工-北极星水力发电网 . 2022-09-27 . news.bjx.com.cn.
  21. Web site: 金沙江上游昌波水电站开工建设-新华网 . 2024-07-19 . tibet.news.cn.
  22. Web site: 金沙江上游苏洼龙水电站首台机组进入72小时试运行 . 2022-07-20 . www.sc.chinanews.com.cn.
  23. Web site: 总投资102亿元!甘孜州巴塘水电站开工建设,预计2022年投产!_工作. www.sohu.com. en. 2019-07-07.
  24. Web site: 金沙江上游最大水电工程实现重大目标,大坝浇筑破100米 . 2024-07-19 . news.cctv.com . zh-cn.
  25. Web site: 二滩水电开发有限责任公司 | 二滩电厂 . 2010-09-29 . dead . https://web.archive.org/web/20110707015003/http://www.ehdc.com.cn/newwebsite/ertan.htm . 2011-07-07 .
  26. Web site: 雅砻江孟底沟水电站正式开工 - 北极星水力发电网. 2021-10-03. news.bjx.com.cn.
  27. Web site: 国投电力:牙根一级水电站获得核准-北极星电力新闻网 . 2024-07-19 . m.bjx.com.cn.
  28. Web site: 大渡河安谷水电站开工建设_商务_东莞时间网 . 2012-04-01 . https://web.archive.org/web/20140219022814/http://biz.timedg.com/2012-03/29/content_9297854.htm . 2014-02-19 . dead .
  29. Web site: 新浪博客 .
  30. Web site: 大渡河沙坪一级进入一期主体工程施工阶段 - 北极星水力发电网. 2021-11-07. news.bjx.com.cn.
  31. Web site: 四川省大渡河老鹰岩一级水电站环评审查公示-北极星电力新闻网 . 2024-07-19 . m.bjx.com.cn.
  32. Web site: 4200MW!四川省老鹰岩二级水电站可研报告通过审查-国际电力网 . 2024-07-19 . power.in-en.com.
  33. Web site: 硬梁包水电站大坝填筑到顶-北极星电力新闻网 . 2024-07-19 . m.bjx.com.cn.
  34. Web site: 四川大唐黄金坪水电站1号机组正式投产-新闻-能源资讯-中国能源网 . 2024-07-19 . www.china5e.com.
  35. News: 四川金堂要建抽水蓄能水电站. https://web.archive.org/web/20120313052145/http://www.huaxiawind.com.cn/detail_hyp.asp?infoId=13486. dead. 2010-08-16. 2012-03-13. www.huaxiawind.com.cn.