This is a list of hydroelectric power stations in Pakistan as per NEPRA Report 2023.[1]
S/N | Station | Location | Type of Power Station | Capacity (MW) | In-Service year | |
---|---|---|---|---|---|---|
1 | Renala | Renala, Punjab | Run of Canal | 1 | 1925 | |
2 | Malakand / Jabban | Malakand, KPK | Run of River | 22 | 1935 | |
3 | Rasul | Mandi Bahauddin, Punjab | Run of Canal | 22 | 1952 | |
4 | Dargai | Malakand, KPK | Run of Canal | 20 | 1952 | |
5 | Kurram Garhi | Kurram Garhi, KPK | Run of Canal | 4 | 1958 | |
6 | Chichonki Malian | Sheikhupura, Punjab | Run of Canal | 13 | 1959 | |
7 | Warsak | Peshawar, KPK | Run of River | 243 | 1960 | |
8 | Shadiwal | Shadiwal, Gujrat, Punjab | Run of Canal | 14 | 1961 | |
9 | Nandipur | Gujranwala, Punjab | Run of Canal | 14 | 1963 | |
10 | Mangla | Mirpur, Azad Kashmir | Reservoir | 1,000 | 1967 | |
11 | Chitral | Chitral, KPK | Run of Canal | 1 | 1975 | |
12 | Tarbela | Tarbela, KPK | Reservoir | 4,888 | 1977 | |
13 | Chashma | Chashma, Punjab | Run of River | 184 | 2000 | |
14 | Jagran | Neelum, Azad Kashmir | Hydro | 30 | 2000 | |
15 | Ghazi-Barotha | Attock, Punjab | Run of River | 1,450 | 2003 | |
16 | Malakand-III | Malakand, KPK | Run of River/Canal | 84 | 2008 | |
17 | Khan Khwar | Shangla, KPK | Reservoir | 72 | 2010 | |
18 | Pehur | Canal Fall/Run of River | 18 | 2010 | ||
19 | Jinnah | Jinnah Barrage, Punjab | Run of River | 96 | 2012 | |
20 | Garam Chashma | Chitral, KPK | Hydro | 1 | 2012 | |
21 | Allai Khwar | Mansehra, KPK | Reservoir | 121 | 2013 | |
22 | Gomal Zam | South Waziristan | Reservoir | 17 | 2013 | |
23 | New Bong Escape (Laraib Energy) | Mirpur, Azad Kashmir | Hydro | 84 | 2013 | |
24 | Duber Khwar | Kohistan, KPK | Reservoir | 130 | 2014 | |
25 | Patrind Hydro | Muzaffarabad, Azad Kashmir | Run of River | 147 | 2017 | |
26 | Golen Gol | Chitral, KPK | Run of River | 108 | 2018 | |
27 | Neelum–Jhelum | Muzaffarabad, Azad Kashmir | Run of River | 969 | 2018 | |
28 | Marala Hydro (PPDCL) | Sialkot, Punjab | Canal Fall/Run of River | 8 | 2018 | |
29 | Gulpur Hydropower Plant, Barali | Kotli, Azad Kashmir | Run of River | 100 | 2020 | |
30 | Daral Khwar | Swat District, KPK | Run of River | 37 | 2021 | |
31 | Ranolia | Kohistan, KPK | High Head | 17 | 2021 | |
32 | Karot | Azad Kashmir / Punjab | Run of River | 720 | 2022 | |
Total In-Service Generation | 10,635 |
Station | Community | Capacity (MW) | Status | |
---|---|---|---|---|
4.2 | Under construction. To be operational by Oct 2024.[2] | |||
800 | Under construction. To be operational by Dec 2025.[3] | |||
4,320 | Under construction. Stage-I: 2,160 MW to be operational by April 2026.[4] | |||
Keyal Khwar Hydropower Project | Kohistan, KPK | 128 | Under construction. To be operational by 2026. | |
Tarbela Dam Extension-V | 1,530 | Under construction. To be operational by 2025.[5] [6] | ||
Diamer-Bhasha Dam | Chilas, Gilgit-Baltistan | 4,500 | Under construction. To be operational by Jun 2029. | |
Kurram Tangi Dam | North Waziristan, Khyber Pakhtunkhwa | 83.4 | Under construction. To be operational by Jun 2026.[7] | |
Total Under-Construction Generation | 11,365+ | |||
Station | Community | Capacity (MW) | Status | ||
---|---|---|---|---|---|
700 | Under construction. To be operational by 2025. | ||||
Mansehra, Khyber Pakhtunkhwa | 300 | Ready to be constructed in 2020.[8] | |||
350 | Ready to be constructed. Korea Hydro & Nuclear Power Corporation won the contract for construction.[9] | ||||
35 | Ready to be constructed. Sinohydro Corporation China and Sichuan Energy Industry Investment Group Co. Ltd. China won the contract for construction.[10] | ||||
58 | Ready to be constructed. Sinohydro Corp Ltd and Sachal Engineering Works Private Ltd won the contract for construction. | ||||
496 | Ready to be constructed.[11] | ||||
99 | Ready to be constructed.[12] | ||||
120 | Ready to be constructed.[13] | ||||
1124 | |||||
102 | .[14] | ||||
Tangir Hydropower Project | Chilas, Gilgit-Baltistan | 21[15] | Under construction.[16] To be operational by 2028 [17] | ||
5.38 | Ready to be constructed.[18] | ||||
4.04 | Ready to be constructed. | ||||
4.16 | Ready to be constructed. | ||||
5.0 | Ready to be constructed. | ||||
34.9167°N 107°W | 590 | Ready to be constructed. China Three Gorges Corporation won the contract for construction.[19] | |||
80 | Ready to be constructed. CTG won the contract for construction.[20] | ||||
500 | Ready to be constructed. Chinese firm won the contract for construction. | ||||
20 | Ready to be constructed. Cost estimate $63 million.[21] | ||||
Kalam, KPK | 197 | Ready to be constructed. KPK government signed MOU with Korea’s state-owned M/S Korea South East Power Company. Cost estimate $500 million.[22] | |||
30 | Ready to be constructed. Cost estimate $80 million.[23] | ||||
5.8 | Ready to be constructed.[24] [25] | ||||
35.65°N 110°W | 7,100 | Ready to be constructed. MOU signed with China’s National Energy Administration.[26] Cost estimate $6.8 billion. | |||
3600 | Proposed. | ||||
2,400 | Ready to be constructed. MOU signed with China’s National Energy Administration.[27] Cost estimate $6 billion.[28] | ||||
34.5 | Ready to be constructed.[29] | ||||
34.75°N 127°W | 4,000 | Feasibility studies to be completed by Dec 2017. MOU signed with China’s National Energy Administration Cost estimate $6 billion. | |||
81 | Detailed engineering design or tender of documents under process.[30] Cost estimate $128 million . | ||||
Basho Hydropower Station | 28 | Detailed engineering design or tender of documents under process.[31] Cost estimate $40 million. | |||
Tank Zam Dam | 25.5 | Feasibility studies completed. Cost estimate $234 million. | |||
3.5 | Feasibility studies completed. Cost estimate $311 million. | ||||
600 | Feasibility studies ongoing. Cost estimate $1.6 billion. | ||||
15000 | Proposed. | ||||
373 | Feasibility studies ongoing. Cost estimate $763 million. | ||||
160 | Feasibility studies ongoing. Cost estimate $763 million. | ||||
157 | Feasibility studies ongoing.[32] | ||||
144 | Financing is being arranged for these projects by selling shares in the existing projects.[33] | ||||
132 | Financing is being arranged for these projects by selling shares in the existing projects. | ||||
? | The preliminary feasibility study of the project has been completed and process of site selection completed.[34] | ||||
? | The preliminary feasibility study of the project has been completed and process of site selection completed. | ||||
? | The preliminary feasibility study of the project has been completed and process of site selection completed. | ||||
188 | EOI invited. | ||||
14 | The preliminary feasibility study of the project has been completed and process of site selection completed.[35] | ||||
50 | The preliminary feasibility study of the project has been completed and process of site selection completed. | ||||
50 | The preliminary feasibility study of the project has been completed and process of site selection completed. | ||||
50 | The preliminary feasibility study of the project has been completed and process of site selection completed. | ||||
50 | The preliminary feasibility study of the project has been completed and process of site selection completed. | ||||
50 | The preliminary feasibility study of the project has been completed and process of site selection completed. | ||||
60 | The preliminary feasibility study of the project has been completed and process of site selection completed. | ||||
60 | The preliminary feasibility study of the project has been completed and process of site selection completed. | ||||
135 | IPP, RFP has been accepted.[36] | ||||
102 | EOI invited. | ||||
96 | EOI invited. | ||||
21 | EOI Iinvited. | ||||
12 | EOI invited. | ||||
0.3 | Proposed. Cost estimate $148 million.[37] | ||||
Dera Ismail Khan, KPK, Khora River | 0.75 | Proposed. Cost estimate $69 million. | |||
Ghabir River | 0.15 | Proposed. Cost estimate $121 million. | |||
Rawalpindi District, Wadala Kas | 0.3 | Proposed. Cost estimate $101 million. | |||
Rajhdani Dam | 132 | EOI invited. | |||
Kalam, Khyber Pakhtunkhwa | 101 | LoS issued. | |||
1 | Proposed. | ||||
1 | Proposed.[38] | ||||
1.7 | Proposed. | ||||
6.4 | Proposed. | ||||
33 | Proposed. | ||||
53 | Proposed. | ||||
130 | Proposed. | ||||
25 | Proposed.[39] | ||||
29 | Proposed. | ||||
215 | LOI issued by PEDO, KPK to Korea's state-owned company, M/S Korea South East Power Company (KOEN) working through KOAK Power Limited. | ||||
458 | Proposed. | ||||
132 | Proposed. | ||||
144 | Proposed. | ||||
500 | Proposed. | ||||
3.6 | Proposed. | ||||
3000 | Proposed. | ||||
520 | Proposed. | ||||
2200 | Proposed. | ||||
1600 | Proposed. | ||||
960 | Proposed. | ||||
960 | Proposed. | ||||
32 | Proposed. | ||||
10 | Proposed. | ||||
51 | Proposed. | ||||
52 | Proposed. | ||||
79 | Proposed. | ||||
Total proposed Generation | 30,237+ |