These are the bridges in Dubai that are completed, under construction, proposed or approved.
Bridges in Dubai are operated by Dubai Roads and Transport Authority (RTA).
Bridge | Opened | Length (m) | Cost | Number of lanes | Vehicles per hour | |
1963 | 9,500 | |||||
16 July 2007 | 300 meters | 155 million dirhams | 12 | 6,000 | ||
1976 | 520 metres | 415 million dirhams | 6 | 9,000 | ||
June 2007 | 1.6 km | 800 million dirhams | 13 | 26,000 | ||
Infinity Bridge(Al Shindagha Bridge) | 16 January 2022 | 295 metres | 393 million dirhams | 12 | 24,000 |
Bridge | Expected completion | Length (m) | Cost | Number of lanes | Vehicles per hour | |
2012 | 1.6 km | 2.5 billion dirhams | 12 | 9,500 | ||
2018 | 300 meters | 810 million dirhams | 12 | 24,000 | ||
The Fifth Bridge[1] | 2.5 billion dirhams | 12 |
Bridge | Opened | Length (m) | Cost | Number of lanes | Vehicles per hour | |
1975 | 550 Meters | 394 MillionDhs | 4 | 15,000 vehicles per hour | ||
Constructed during the mid 2000s, goes under Dubai Airport | 1500Meters | 686 Million Dhs | 6 | 1,650 vehiclesPer hour | ||
2006[2] | 750 metre[3] | 6 | 3,000 vehicles per hour |