List of battlecruisers of Russia explained

After the end of the Russo-Japanese War of 1905, the Russian Naval General Staff decided that it needed a squadron of fast "armored cruisers" (Броненосный крейсер; bronenosnyy kreyser) that could use their speed to maneuver into position to engage the head of the enemy's battle line, much as Admiral Tōgō had done during the Battle of Tsushima against the Russian fleet.[1] This concept was very different from the primary roles for the battlecruiser envisioned by the British Royal Navy and the Imperial German High Seas Fleet, which consisted of scouting for the main battle fleet and attacking enemy reconnaissance forces.[2] The Royal Navy came to the same conclusion and developed the fast battleships that could force battle on an enemy fleet and had enough protection to attack any type of ship.[3] However, World War I and the Russian Civil War interrupted the construction of the Russian Borodino-class ships and all were scrapped.

Twenty years later the Soviet Navy issued a requirement for a ship capable of dealing with enemy cruisers, but the design began to grow as it was modified to allow for combat with German pocket battleships on even terms, and later modified to gain parity with the s. Two ships were laid down in 1939, but development of their new guns lagged significantly behind their construction and six 38adj=on0adj=on twin-gun turrets were ordered from Germany in 1940. The working drawings for the turrets and guns had not even been received when Operation Barbarossa began in June 1941. The incomplete hulls of both ships were ordered scrapped in 1947.[4]

The Navy revived its requirement for a "cruiser-killer" during the war, but the design process was quite lengthy as questions as to its armament, speed and size were debated. Joseph Stalin was the key supporter of these ships and made many of the important decisions himself, overriding the desires of the Navy. Thus, after his death in 1953, little time was wasted in cancelling the three ships that had been laid down. The hull of the most advanced ship was used as a target and the other two were scrapped on their slipways.[5]

In the 1970s, the Navy initiated a project to construct a nuclear-powered ship capable of accommodating anti-aircraft, anti-ship and anti-submarine guided missiles in a single hull. This type, classed as a "heavy nuclear-powered missile cruiser" by the Soviets, eventually emerged as the largest non-aircraft carrying surface warship built since the end of the Second World War, and was termed in the West as a battlecruiser.[6]

Key

scope="row"
Main gunsThe number and type of the main battery guns
ArmorWaterline belt thickness
DisplacementShip displacement at full load
PropulsionNumber of shafts, type of propulsion system, and top speed generated
ServiceThe dates work began and finished on the ship and its ultimate fate
Laid downThe date the keel began to be assembled
LaunchedThe date the ship was launched
The Kirov class was fitted with a primarily missile-based main armament; this is reflected in the table with "Main armament" given instead of "Main guns".

Borodino class

See main article: article and Borodino-class battlecruiser. The four Borodino-class battlecruisers (also referred to as Izmail class) of the Imperial Russian Navy were all laid down in December 1912 at Saint Petersburg for service with the Baltic Fleet. Construction of the ships was delayed as many domestic factories were already overloaded with orders and some components had to be ordered from abroad. The start of World War I slowed their construction still further as the foreign orders were often not delivered and domestic production was diverted into things more immediately useful for the war effort. The ships were launched in 1915–1916, but the outbreak of the Russian Revolution in 1917 put a stop to their construction, which never resumed.[7] The Soviet Navy gave consideration to completing the ships; initially, Izmail and Borodino were looked at, with a view to finishing one or both to their original design, but the lack of available 12inches guns, combined with the complexity of the originally designed electrical system, led to the idea being dropped.[8] Subsequently, plans were raised to complete Kinburn and Navarin to a modified design with 16inches guns, which again failed due to the difficulty in either obtaining guns from overseas, or manufacturing them domestically. Subsequent ideas included converting some of the hulls for cargo or passenger use, which again failed. The Navy made a serious proposal in 1925 to convert Izmail, the ship closest to completion, to an aircraft carrier, but this plan was later cancelled as a result of political maneuvering on the part of the Red Army.[9] Eventually, all four hulls were broken up for scrap; the second, third and fourth were sold to a German company in 1923, while Izmail was broken up in Leningrad in 1931.

Ship! scope="col" align=center rowspan=2
BuilderMain gunsArmorDisplacementPropulsionService
Laid down[10] LaunchedFate
Izmail (Russian: Измаил|links=no)align= left Baltic Shipyard, Saint Petersburgalign= center rowspan=4 12 × 35.6cm (14inches)[11] align= center rowspan=4 237.5mm[12] align= center rowspan=4 366460NaN04 screws, 4 geared steam turbines
19 December 191222 June 1915align= left Scrapped, 1931[13]
Borodino (Russian: Бородино|links=no)align= left Admiralty Shipyard, Saint Petersburg31 July 1915Sold for scrap, 21 August 1923[14]
Kinburn (Russian: Кинбурн|links=no)align=left Baltic Shipyard, Saint Petersburg30 October 1915
Navarin (Russian: Наварин|links=no)align= left Admiralty Shipyard, Saint Petersburg9 November 1916

Kronshtadt class

See main article: article and Kronshtadt-class battlecruiser.

In the 1930s the Soviets began development of a large cruiser (Russian: большой крейсер; bol'shoy kreyser) capable of destroying 100000NaN0 cruisers built to the limits imposed by the Washington Naval Treaty, which the Soviets had not signed. Several designs were proposed, but rejected by the Navy before the concept was merged with the small battleship (Battleship 'B') then being designed for service with the Baltic and Black Sea Fleets after the Soviets agreed to follow the terms of the Second London Naval Treaty in 1937. The new design was significantly larger and was also tasked with dealing with Germany's so-called "pocket battleships". Four were ordered shortly afterward, but the beginning of the Great Purge in August 1937 hindered the completion of the design process and the project was cancelled in early 1938 after being criticized as too weak in comparison to foreign ships.[15] The Navy, however, still had a requirement for a ship capable of defeating enemy cruisers and the original concept was revived as Project 69. The proposed size of the ship continually escalated as the requirement was revised to allow it to fight larger ships like the German s. The preliminary design was finally approved in January 1939 and two ships were laid down in November 1939, before the detailed design had even been approved.[16]

The Project 69 ships were intended to use a newly designed 305mm gun in a new triple turret, but they were both well behind schedule when Joseph Stalin asked the Germans in February 1940 if any triple 283adj=on1adj=on turrets were available for purchase under the German–Soviet Commercial Agreement. When they said no, he then asked if any twin 380adj=on0adj=on turrets were available instead. Krupp had six incomplete 380mm SK C/34 turrets available that had originally been ordered before the war to rearm the two vessels of the Scharnhorst-class, but which were not used when the plan was cancelled after the start of World War II. A preliminary purchase agreement was made to buy 12 guns and six turrets later that month, well before any studies were made to see if the substitution was even possible. It was later determined that they could be used, so the agreement was finalized in November 1940 with the deliveries scheduled from October 1941 to 28 March 1943.[17]

"Project 69-I" ("Importnyi" – Imported) modified the two ships to use the German guns, even though they still lacked data for the turrets and their barbettes. The detailed design was supposed to be completed by 15 October 1941, but it was rendered moot when the Germans invaded the Soviet Union in June. Neither ship had progressed very far at that time and both had been damaged during the war, so they were ordered scrapped on 24 March 1947 after some thought had been given to completing Kronshtadt as either an aircraft carrier or a mother ship for whalers.

Ship! scope="col" align= center rowspan=2
BuilderMain gunsArmorDisplacementPropulsionService
Laid downLaunchedFate
Kronshtadt (Russian: Кронштадт|links=no)align=left Shipyard No. 194, Leningradalign= center rowspan=2 6 × 38cm (15inches)[18] align= center rowspan=2 230mmalign= center rowspan=2 [19] align= left rowspan=2 3 screws, 3 geared steam turbines, 32knots[20] align= center 30 November 1939Ordered scrapped, 24 March 1947[21]
Sevastopol (Russian: Севастополь|links=no)align=left Shipyard No. 200, Nikolaevalign= center 5 November 1939

Stalingrad class

See main article: article and Stalingrad-class battlecruiser.

The Navy reissued its requirements for a large cruiser to destroy enemy light cruisers in 1943, but none of the designs submitted were acceptable. The requirement was reissued in 1944 for a larger ship and the concept was approved by the Politburo in 1945. However, the Navy and the Shipbuilding Commissariat disagreed about the feasibility of laying down any ships of new design before 1950, so a committee was appointed under the chairmanship of Lavrentiy Beria to resolve the issue. It mostly sided with the Shipbuilding Commissariat, but a program of seven large cruisers was approved later that year. Preliminary design work was not completed until 1948 and the size of the ship ballooned to 40000t. Stalin intervened several times during the design process and ordered the ship's displacement reduced to 365000NaN0 and speed increased to as well as specifying its armament as 305 mm guns, rather than the guns preferred by the Navy. All of these changes delayed approval of the detailed design until 1951.[22]

The first ship was begun in November 1951 and the other two followed in 1952; a fourth was apparently ordered from the Severodvinsk shipyard, but was cancelled before being laid down. By this time Stalin's support was the main impetus behind the ships and little time was wasted cancelling them after his death on 5 March 1953. Stalingrads hull was ordered to be used for weapons tests while the two other ships were scrapped where they lay. The hull was launched in 1954 after it was modified to suit its new role. It was towed from Nikolayev to Sevastopol in 1955, but it grounded at the entrance to Sevastopol Bay. Initial attempts to pull it off the rocks by brute force failed, and the capsizing of the battleship further delayed salvage work, so that she was not freed until mid-1956. She served as a target for the first generation of Soviet anti-ship missiles and a wide variety of armor-piercing weapons before she was scrapped in the early 1960s, probably 1962.[23]

Ship! scope="col" align=center rowspan=2
BuilderMain gunsArmorDisplacementPropulsionService
Laid downLaunchedFate
Stalingrad (Russian: Сталинград|links=no)align=left Shipyard No. 198, Nikolaevalign= center rowspan=3 9 × 305mm[24] align= center rowspan=3 180mm[25] align= center rowspan=3 align= left rowspan=3 4 screws, 4 × geared steam turbines, 35.5knots[26] align= center November 1951[27] 16 March 1954[28] align= left Hulk used as target and later scrapped[29]
Moskva (Russian: Москва|links=no)align=left Shipyard No. 189, Leningradalign= center September 1952align= left Scrapped, 1953
Kronshtadt (Russian: Кронштадт|links=no)align=left Shipyard No. 402, Severodvinskalign= center October 1952align= left Scrapped, 1953

Kirov class

See main article: Kirov-class battlecruiser. In the 1960s, the Soviet Union originated Project 1144 Orlan, a project intended to design and build a large, nuclear powered anti-submarine vessel. At the time, the Soviets did not envisage that arming surface ships with anti-ship missiles was required, as then current doctrine had it that submarines were the main platform for attacking enemy shipping.[30] [31] However, the sinking of the Israeli destroyer INS Eilat in 1967 by anti-ship missiles fired from an Egyptian missile boat led to a re-think of the use of surface ships in the role. The threat of US Navy surface ships, which were increasingly capable of a range of different missions, led to the idea of a single ship combining anti-aircraft, anti-ship and anti-submarine capabilities crystallising.[32]

Under the original specifications laid out in 1969, the new ship was originally classified as "nuclear antisubmarine cruiser" (Russian: атомный противолодочный крейсер; atomnyy protivolodochnyy kreyser). The first hull was laid down at the Baltiysky Zavod in Leningrad in March 1974 under the name . By the time the ship was launched in December 1977, she had been reclassified as a "heavy nuclear-powered guided missile cruiser" (Russian: тяжёлый атомный ракетный крейсер; tyazholyy atomnyy raketnyy kreyser), built around a primary armament of 20 SS-N-19 Shipwreck anti-ship missiles. Following the appearance of Kirov, two more units, and, were commissioned at four-year intervals. When Frunze was commissioned in 1984, it was seen to have a different weapons fit to Kirov, with the pair of single 100 mm guns swapped for a twin 130mm turret, and the SS-N-14 Silex ASW missile system deleted in favour of adding eight SA-N-9 Gauntlet SAM launchers. In the event, none of the four ships of the class received a completely identical armament fit.[33] [34] Additionally, the hull and propulsion machinery of the Kirov-class was used for the Soviet Navy's C3 vessel Ural.[35]

The size of the Kirov class was approximately 28000LT full load. This was around the same size as a First World War super-dreadnought battleship, and significantly bigger than any contemporary cruiser design, leading to commentators in the west describing them as "battlecruisers".[36] [37] Their appearance was a major factor in the US Navy reactivating its four s in the early 1980s.[38] The fourth unit,, was launched in April 1989, with plans advanced for a fifth ship, to be named Kuznetsov.[39] [40] However, the fall of the Soviet Union saw funding for the Navy collapse—the fourth ship, renamed as Pyotr Velikiy (Peter the Great), was not commissioned until 1998, while the fifth hull was cancelled, and the remaining three laid up in varying states of disrepair. Although the first ship, Kirov began a planned overhaul in 1999, this was halted in 2001, with the decision taken to dismantle the ship instead.[41] Kalinin (renamed as Admiral Nakhimov in 1992[42]), considered to be in better condition, was scheduled to undergo a major overhaul to return her to active service by 2021.[43] [44] However, problems in completing the work saw the ships' delivery date pushed back to 2023.[45] Once Admiral Nakhimov has rejoined the fleet, it was planned that Pyotr Velikiy would undergo a similar modernization. Then, in 2023, a report emerged that, owing to the spiralling cost of both its planned major refit, plus the increasing general maintenance costs, Pytor Velikiy would not undergo its planned modernisation and would instead be decommissioned once Admiral Nakhimov was returned to service.[46] However, this remained unconfirmed at the time, with instead it simply being noted that the ship was continuing to undertake operations while an assessment of its condition was being undertaken.[47] The fate of Frunze, renamed as Admiral Lazarev, was less clear, as the intention was to carry out an inspection of the ship to determine its overall condition once work on Admiral Nakhimov was completed. However, in April 2019 it was announced that both Kirov, having already been defuelled,[48] and Admiral Lazarev were to be finally withdrawn and broken up.[49] [50] Admiral Lazarev was sold for scrapping in February 2021.[51] [52]

Ship! scope="col" align=center rowspan=2
BuilderMain armamentDisplacementPropulsionService
Soviet Navy nameRussian Navy nameAnti-ship missilesGunsLaid downLaunchedCommissionedFate
Kirov (Russian: Киров|links=no)Admiral Ushakov (Russian: Адмирал Ушаков|links=no)Shipyard No. 189, Leningrad20 × SS-N-19 Shipwreck2 × AK-100 100mm28000abbr=onNaNabbr=on2 shaft CONAS; 2 × nuclear reactors and 2 × steam turbines, 32knots27 March 1974[53] 26 December 197730 December 1980Laid up
Frunze (Russian: Фрунзе|links=no)Admiral Lazarev (Russian: Адмирал Лазарев|links=no)1 × twin AK-130 130mm27 July 197826 May 198131 October 1984Sold for scrapping, February 2021[54]
Kalinin (Russian: Калинин|links=no)Admiral Nakhimov (Russian: Адмирал Нахимов|links=no)17 May 198325 April 198630 December 1988In refit
Yuri Andropov (Russian: Юрий Андропов|links=no)Pyotr Velikiy (Russian: Пётр Великий|links=no)11 March 198629 April 19899 April 1998In service
Kuznetsov (Russian: Кузнецо́в|links=no)Mid-1989[55] Cancelled, 4 October 1990
Scrapped in place

References

Notes and References

  1. McLaughlin 2003, p. 244
  2. Roberts 1997, p. 18
  3. Burt 1986, p. 251
  4. McLaughlin 2004, pp. 99–117
  5. McLaughlin 2006, pp. 102–23
  6. Book: Tucker-Jones, Anthony . 2015 . Soviet Cold War Weaponry: Aircraft, Warships and Missiles . Pen & Sword Aviation. 20 October 2016 . 978-1473823617.
  7. McLaughlin 2003, pp. 247–249
  8. McLaughlin, p. 332
  9. McLaughlin 2003, pp. 332–337
  10. McLaughlin 2003, pp. 248–249
  11. McLaughlin 2003, pp. 243–244
  12. McLaughlin 2003, p. 252
  13. Breyer 1992, p. 114
  14. McLaughlin 2003, pp. 332–335
  15. McLaughlin 2004, pp. 100–105
  16. McLaughlin 2004, pp. 107, 109, 112
  17. McLaughlin 2004, pp. 109, 111
  18. McLaughlin 2004, p. 111
  19. McLaughlin 2004, pp. 107, 112
  20. McLaughlin 2004, p. 109
  21. McLaughlin 2004, pp. 112, 114
  22. McLaughlin 2006, pp. 103–110
  23. McLaughlin 2006, pp. 116, 119–120
  24. McLaughlin 2006, pp. 110–111
  25. McLaughlin 2006, p. 114
  26. McLaughlin 2006, p. 115
  27. McLaughlin 2006, p. 116
  28. McLaughlin 2006, p. 118
  29. McLaughlin 2006, pp. 119–120
  30. Web site: Project 1144 (Orlan) – History . . 7 September 2011 . globalsecurity.org . 20 October 2016 .
  31. Jackson, pp. 409–411
  32. Bonner & Bonner, p. 86
  33. Director of Naval Intelligence . July 1991 . Understanding Soviet Naval Developments . Department of the Navy . 147 . 13 December 2016. live . https://web.archive.org/web/20170225091003/http://www.dtic.mil/dtic/tr/fulltext/u2/a248966.pdf . 25 February 2017.
  34. Web site: Kirov (Orlan) Class (Type 1144.1/1144.2) (CGN) . . 8 September 2000 . Jane's . 13 December 2016 . https://web.archive.org/web/20090415230911/http://www.janes.com/defence/naval_forces/news/jfs/jfs000908_2_n.shtml . 15 April 2009.
  35. Web site: SSV-33 Project 1941 . Pike . John . GlobalSecurity.org . 27 April 2022.
  36. Gardiner, Chumbley & Budzbon, p. 328
  37. Web site: Kirov Class Battle Cruiser: The World's Largest Surface Combatant . Rogoway . Tyler . 5 May 2014 . Foxtrot Alpha . 20 October 2016 .
  38. Miller and Miller, p. 114
  39. Web site: Project 1144.2 Orlan – Units . . 8 September 2016 . globalsecurity.org . 20 October 2016 .
  40. Miller, p. 192
  41. Web site: Nuclear battle cruiser to be scrapped . Igor . Kudrik . 3 November 1998 . . 18 February 2009 . dead . https://archive.today/20121203035425/http://www.bellona.no/bellona.org/english_import_area/international/russia/navy/northern_fleet/vessels/9519 . 3 December 2012.
  42. Web site: Handover of Admiral Nakhimov battlecruiser to Russian navy postponed — source . . 7 April 2021 . TASS . 10 September 2021 . https://web.archive.org/web/20210407032227/https://tass.com/defense/1274887 . 7 April 2021 .
  43. News: Only one nuclear cruiser to be modernized . Barents Observer . Trude . Pettersen . 27 September 2012 . 20 October 2016.
  44. Web site: Ремонт и модернизация тяжелого атомного ракетного крейсера "Адмирал Нахимов" идет в соответствии с графиком . 27 September 2017 . Ministry of Defence of the Russian Federation . ru . Repair and modernization of the heavy nuclear missile cruiser Admiral Nakhimov is in accordance with the schedule. 12 October 2017.
  45. Web site: Handover of Admiral Nakhimov battlecruiser to Russian navy postponed — source . . 7 April 2021 . TASS . 27 August 2021 .
  46. Web site: Russia to Scrap World's Largest Nuclear-Powered Warship Amid Mounting Costs . Kuklychev . Yevgeny . 21 April 2023 . Newsweek . 4 August 2023 .
  47. Web site: Источник опроверг данные о решении списать крейсер "Петр Великий" . The source denied the information about the decision to write off the cruiser "Peter the Great" . ru . 18 July 2023 . mil.press . 4 August 2023 .
  48. Web site: Russia continues upgrading its Kirov-class nuclear-powered cruisers . . 5 February 2018 . Navy Recognition . 6 July 2018 .
  49. Web site: Крейсерова соната: атомный флот отправят в утиль . Ramm . Alexey . 18 April 2019 . izvestia.ru . 24 October 2019 . ru . Cruiser Sonata: the nuclear fleet will be sent for scrap.
  50. Web site: Surface Forces: Killing The Kirovs To Save The Fleet . . 20 May 2019 . StrategyPage . 24 October 2019 .
  51. Web site: Атомный крейсер "Адмирал Лазарев" отправили на утилизацию . 18 February 2021 . Interfax . ru . Nuclear cruiser "Admiral Lazarev" sent for recycling . 20 August 2021 .
  52. Web site: Russia to scrap nuclear battlecruiser Admiral Lazarev . White . Ryan . 21 February 2021 . Naval Post . 20 August 2021 .
  53. Web site: Project 1144.2 Kirov – Ship List . . 30 January 2016 . globalsecurity.org . 24 October 2016 .
  54. Web site: Nuclear Battlecruiser Admiral Lazarev Reaches Her Final Destination . White . Ryan . 6 May 2021 . Naval Post . 27 August 2021 .
  55. Office of Soviet Intelligence . 15 September 1990 . The Soviet Aircraft Carrier: Torpedoed by Peristroika?. 8 . 13 December 2016 . https://web.archive.org/web/20161220110030/https://www.cia.gov/library/readingroom/docs/DOC_0000499256.pdf . 20 December 2016 .