This is a list of airports in the Greater Manila Area, the most populous urban agglomeration in the Philippines. Though there are several definitions over what comprises the area, for the purposes of this article the entire administrative region of Metro Manila and the surrounding provinces of Bataan, Batangas, Bulacan, Cavite, Laguna, Pampanga and Rizal are considered its components.
There are currently 1 airport, but consist of 4 terminals. This are Terminal 1 located at Paranque near at Duty Free Market and SnR market, Terminal 2 which located at Paranque also near at CAAP, Terminal 3 located in Pasay near Resort World Manila and other Hotel like Mariott Hotel, etc. The last one Terminal 4 located in Pasay near at Cebu Pacific Office, AirAsia office, and LTO Land Transportation Office. However, the majority of passenger traffic goes through Metro Manila's Ninoy Aquino International Airport (NAIA), which is the Philippines' busiest airport and major hub. Clark International Airport, which has been developed into an alternate international gateway, also sees a significant amount of traffic. Subic Bay International Airport (SBIA), although classified as an international airport by the Civil Aviation Authority of the Philippines (CAAP), currently only hosts domestic flights.[1]
Airport name | IATA | ICAO | Location | Coordinates |
---|---|---|---|---|
CRK | RPLC | Clark Freeport (Angeles City/Mabalacat) | 15.1858°N 120.5597°W | |
MNL | RPLL | 14.5086°N 121.0194°W | ||
SGL | RPLS | |||
SFS | RPLB | Subic Bay Freeport (Morong) | ||
The following airports are operated by branches of the Armed Forces of the Philippines for military or mixed military-civilian use.
Airport name | IATA | ICAO | Location | Coordinates |
---|---|---|---|---|
RPUL | ||||
Camp Mateo Capinpin Airfield | ||||
RPUF | ||||
CRK | RPLC | Clark Freeport (Mabalacat) | 15.1858°N 120.5597°W | |
SGL | RPLS | |||
MNL | RPLL | 14.5086°N 121.0194°W | ||
Airport name | IATA | ICAO | Location | Coordinates | |
---|---|---|---|---|---|
Barradas (Mannie W. Barradas/Santor) Airfield[2] | 14.0969°N 121.1161°W | ||||
Calatagan (Hacienda Zobel) Airstrip | 13.8436°N 120.6347°W | ||||
OMNI Aviation Complex | RPLC | 15.1689°N 120.5636°W | |||
RPUX | 14.8906°N 120.8528°W | ||||
Woodland Airpark (Gordon Boyce Airfield) | 15.2506°N 120.6775°W |
Airport name | IATA | ICAO | Location | Coordinates | |
---|---|---|---|---|---|
Air Juan Manila Harbor Seaplane Terminal[3] | 14.5567°N 120.9794°W | ||||
CCP Bay Terminal[4] | 14.5583°N 120.9831°W |
Name | Owner / Operator | Location | Coordinates | |
---|---|---|---|---|
INAEC Clark Hangar[5] | Iloilo-Negros Air Express | Mabalacat | 15.1922°N 120.5483°W | |
INAEC Manila Hangar | Iloilo-Negros Air Express | Pasay | 14.5178°N 121.0019°W | |
St. Luke's Medical Center – Global City | St. Luke's Medical Center, Inc. | Taguig | 14.555°N 121.0481°W | |
SM City North Edsa | SM Prime Holdings | Quezon City | 14.6567°N 121.0328°W | |
Tagaytay Track Oval | Local Government of Tagaytay | Tagaytay | 14.0997°N 120.9394°W | |
The Peninsula Manila | Hongkong and Shanghai Hotels | Makati | 14.555°N 121.0253°W | |
V&A Law Center | Villaraza & Angangco Law Firm | Taguig | 14.5589°N 121.0564°W |
Airport name | IATA | ICAO | Location | Coordinates | |
---|---|---|---|---|---|
Bundagul (TIPCO) Airstrip | 15.2406°N 120.5989°W | ||||
Minuyan Airstrip | 14.9375°N 121.0808°W |
As early as the 1980s, there has been recognition of the constraints to expanding Manila (later renamed Ninoy Aquino) International Airport's capacity and its continued ability to handle the projected growth in aircraft movements and passenger traffic.[6]
In May 2011, the Japan International Cooperation Agency (JICA) submitted to the Philippine Government a study concerning air transport needs within the Greater Manila Area, which concluded that the development of a new gateway airport was "an urgent need" given that the runway capacity at the existing Ninoy Aquino International Airport (NAIA) was "already almost saturated."[6]
The Philippine Government during the term of President Benigno Aquino III responded by adopting a dual airport system in May 2013, which entailed the upgrade of the facilities at Ninoy Aquino International Airport while also expanding capacity at Clark International Airport.[7]
In October 2013 the Aquino administration requested JICA to conduct a pre-feasibility study to determine the best location of the new gateway airport recommended in the 2011 JICA study.[7] After considering the cost and viability of five options[8] the pre-feasibility study identified two potential sites for the airport: Sangley Point and Laguna de Bay[9] which would both involve reclaiming at least 2,000 hectares of land.
On 13 June 2014 JICA formally recommended the construction of a new airport in the vicinity of Sangley Point, Cavite City, with the lower cost being among the factors considered: reclaiming land in that area will cost only 120 billion (US$2.4 billion) compared to 240 billion at Laguna de Bay (US$4.8 billion).[10] With this recommendation JICA began to work on a full feasibility study for the new Sangley Point-area airport, with 2025 as the target date for its opening.[10]
The full feasibility study has two phases: the first phase will compare two potential sites in the vicinity of Sangley Point, while the second phase will involve an "in-depth" analysis on the chosen location.[9] The study's final recommendation is expected to endorse one of two options: building the airport on the same site as the Danilo Atienza Air Base on Sangley Point at a cost of US$10 billion, or constructing on reclaimed land in central Manila Bay[8] between the air base and another reclaimed area at a cost of US$13 billion. The airport, expected to be commercially operational by 2025 at the earliest, will initially have two runways[9] but can be expanded to four runways capable of handling 700,000 aircraft movements and 130 million passengers annually.
The full study was initially expected to be completed by April 2015,[11] then later moved to June 2015.[12] The target date for the full study's completion was again moved by JICA to early 2016,[8] around January or February, causing the government's timetables for the project's implementation to be pushed back.[13] Although the outgoing administration of Noynoy Aquino called on JICA to finish the full study before his term was to expire on 30 June 2016,[13] it was revealed in February 2016 that JICA will likely complete the study in 18 more months, or around August 2017.[14]
See main article: New Manila International Airport and Sangley Point Airport.
Competing proposals from San Miguel Corporation headed by Ramon Ang and the All-Asia Resources and Reclamation Corporation (ARRC) venture headed by Henry Sy have been submitted for the Philippine Government's consideration as early as 2013.
In February 2015 the then-Secretary of the Department of Transportation and Communications (DoTC) Joseph Emilio Abaya announced they will no longer entertain unsolicited proposals from private groups given that they "spark controversies" that detract from the "open, transparent bidding" they intended for the project.[13] This was reversed in March 2017 by the Duterte administration, whose revamped Department of Transportation (DoTr) expressed interest in developing already-existing and new airports — instead of the previous plan of constructing only one gateway — to help decongest Manila's Ninoy Aquino International Airport (NAIA). The reversal was made against the advice of the National Economic and Development Authority (NEDA), which in the interest of promoting transparency and preventing charges of unethical dealmaking recommended on 27 October 2016 that the development project for the new Manila airport be subject to competitive bidding rather than through unsolicited mode, given that at least five other private sector groups are keen on undertaking the said project.[15]
In order that it can consolidate private sector proposals so that the efforts for decongesting NAIA are made more coherent, the DoTr put on hold in February 2017 the 74.56-billion (US$1.5 billion) NAIA Development Project which would have upgraded the airport's existing facilities to higher international standards and would have expanded the airport if necessary.[16]
Currently there are two unsolicited proposals from Ramon Ang-led San Miguel Corporation and the Henry Sy-backed All-Asia Resources and Reclamation Corporation (ARRC) venture group for the establishment of new airport to serve the Greater Manila Area.[17] [18] The ARRC proposal is reportedly "up for approval" by NEDA as of 12 December 2016.[19] SMC's proposal on the other hand has been approved, but is still subject to a final examination of the concession agreement, followed by a Swiss challenge[20] [21] [22]