The Massachusetts Bay Transportation Authority uses a number of yards and facilities for maintenance and storage of its road and rail fleets.
Many of these facilities are former streetcar carhouses that were gradually converted to trackless trolley and bus use, although some like Southampton (built 2004) are of recent construction. Of the former streetcar carhouses, only Arborway and Watertown were Green Line yards during part of the MBTA era. Everett was an Orange Line yard until 1975.
Name | < | --image--> | Location | Routes served |
---|---|---|---|---|
Albany Street Garage | Albany Street, South End, Boston | Local, Mass Pike Express, and crosstown routes | ||
Arborway Yard | Washington Street, Jamaica Plain, Boston | Local bus routes; former terminus of the Green Line E branch | ||
Cabot Garage | Dorchester Avenue, South Boston | Local bus routes | ||
Charlestown Garage | Arlington Avenue, Charlestown, Boston | Local bus routes | ||
Everett Shops | Broadway, Everett | Heavy repair for buses and for subway components; former Orange Line terminus and yard | ||
Fellsway Garage | Salem Street, Medford | Local bus routes | ||
Lynn Garage | Western Avenue, Lynn | Local bus routes; North Shore express routes | ||
North Cambridge Carhouse | Massachusetts Avenue, North Cambridge | Formerly storage and maintenance for Harvard-based trolleybus routes; being converted for battery buses | ||
Quincy Garage | Hancock Street, Quincy | Quincy-based local bus routes | ||
Somerville Garage at Charlestown | Arlington Avenue, Charlestown, Boston | Local bus routes | ||
Southampton Bus Maintenance Facility | Southampton Street, South Bay, Boston | Silver Line dual mode buses; local bus routes | ||
Watertown Yard | Galen Street, Watertown | Midday layover for local bus routes; former terminus of the Green Line A branch and Green Line heavy maintenance facility | ||
The subway lines each have one maintenance facility (except for three on the Green Line) and often several other yards used for overnight and midday storage. Tail tracks for temporary storage of trains are also present at (Orange Line) and (Blue Line); the Green Line has sidings at,, and .
Name | < | --image--> | Location | Route | Use | |
---|---|---|---|---|---|---|
Alewife Yard | data-sort-value="Alewife" | north of | Red Line | layover/storage | ||
Bowdoin Yard | data-sort-value="Bowdoin" | west of | Blue Line | layover/storage | ||
Cabot Yard | data-sort-value="Broadway" | near | Red Line | maintenance and storage | ||
Caddigan Yard | data-sort-value="Braintree" | south of | Red Line (Braintree branch) | layover/storage | ||
Codman Yard | data-sort-value="Ashmont" | south of | Red Line (Ashmont branch) | layover/storage | ||
Green Line Extension Vehicle Maintenance Facility | Inner Belt District | Green Line (D and E branches) | maintenance and storage | |||
Lake Street Yard | data-sort-value="Boston College" | at | Green Line (B branch) | maintenance and storage | ||
Mattapan Yard | data-sort-value="Mattapan" | at | Ashmont–Mattapan High Speed Line | maintenance and storage | ||
North Station Yard | data-sort-value="North Station" | at | Green Line | layover and storage | ||
Orient Heights Yard | data-sort-value="Orient Heights" | east of | Blue Line | maintenance and storage | ||
Reservoir Yard | data-sort-value="Reservoir" | between and | Green Line (C branch and D branch) | maintenance and storage | ||
Riverside Yard | data-sort-value="Riverside" | at | Green Line (D branch) | maintenance and storage | ||
Wellington Yard | data-sort-value="Wellington" | at | Orange Line | maintenance and storage |
All MBTA Commuter Rail lines except the Lowell Line have a dedicated layover near the end of the line|trainsets to be stored overnight. Some provide ground power and other facilities; others are simply several yard tracks off the mainline. The MBTA has one heavy maintenance facility on the northside, plus two light maintenance facilities on the southside. Equipment is transferred between the two sides via the Grand Junction Railroad.
Name | < | --image--> | Location | Route | Use | |
---|---|---|---|---|---|---|
Bradford Layover | data-sort-value="Bradford" | at | Haverhill Line | layover/storage | ||
Franklin Layover | data-sort-value="Franklin" | east of | Franklin/Foxboro Line | layover/storage | ||
Greenbush Layover | data-sort-value="Greenbush" | at | Greenbush Line | layover/storage | ||
Kingston Layover | data-sort-value="Kingston" | at | Kingston Line | layover/storage | ||
MBTA Commuter Rail Maintenance Facility | Inner Belt, Somerville | northside lines | Heavy maintenance for all commuter rail equipment; layover/storage | |||
Middleboro Layover | data-sort-value="Middleborough" | at | Middleborough/Lakeville Line | layover/storage | ||
Needham Layover | data-sort-value="Needham Heights" | south of | Needham Line | layover/storage | ||
Newburyport Layover | data-sort-value="Newburyport" | south of | Newburyport/Rockport Line | layover/storage | ||
Pawtucket Layover | Pawtucket, Rhode Island | Providence/Stoughton Line | layover/storage | |||
Readville Interim Repair Facility | data-sort-value="Readville" | north of | southside lines | Running maintenance and layover/storage. Expansion into a southside maintenance facility is planned for construction from 2023 to 2028.[1] | ||
Rochester Maintenance Facility | data-sort-value="Rochester" | Cape Main Line in Rochester | Overhaul and maintenance[2] | |||
Rockport Layover | data-sort-value="Rockport" | at | Newburyport/Rockport Line | layover/storage | ||
Southampton Street Yard | data-sort-value="South Station" | south of South Station, Boston | southside lines | running maintenance and midday storage – primarily an Amtrak heavy maintenance facility | ||
Stoughton Layover | data-sort-value="Stoughton" | at | Providence/Stoughton Line | layover/storage | ||
West Cambridge Maintenance Facility | data-sort-value="Alewife" | south of | Maintenance of way equipment storage | |||
Westminster Layover | data-sort-value="Wachusett" | west of | Fitchburg Line[3] | layover/storage | ||
Worcester Layover | data-sort-value="Worcester" | east of | Framingham/Worcester Line | layover/storage |
Name | Location | Routes served | ||
---|---|---|---|---|
Beacon Park Yard | At Beacon Park Yard | Midday layover for the Worcester Line. To be constructed by 2032 as part of the realignment of I-90.[4] | ||
Quincy Bus Maintenance Facility | North of | Will replace Quincy Garage. Bidding process restarted in mid-2022[5] | ||
Wamsutta Layover | North of | Under construction as part of South Coast Rail, expected to open in mid-2024[6] | ||
Weaver's Cove Layover | North of | Under construction as part of South Coast Rail, expected to open in 2024 | ||
Widett Circle | Inside Widett Circle | Layover yard for southside lines. The MBTA Board authorized negotiations for property purchase in December 2022.[7] [8] The MBTA took possession of the property in April 2023.[9] |
Name | < | --image--> | Location | Routes | Use | Closed & reason | |
---|---|---|---|---|---|---|---|
Attleboro Layover | data-sort-value="Attleboro" | south of | Providence/Stoughton Line | layover/storage | 2006; replaced by Pawtucket Layover | ||
Bennett Carhouse | data-sort-value="Harvard Square" | south of Harvard Square, Cambridge | Harvard-based streetcar and trackless trolley routes | maintenance and storage | 1970; Eliot Shops closed | ||
Eliot Shops | data-sort-value="Harvard Square" | south of Harvard Square, Cambridge | Red Line (also Blue Line from 1924–1952) | maintenance and storage | 1970; redevelopment | ||
Fitchburg Layover | data-sort-value="Fitchburg0" | east of | Fitchburg Line | layover/storage | 2016; replaced by Wachusett Layover | ||
Forest Hills Shops | data-sort-value="Forest Hills" | south of | Orange Line | maintenance and storage | 1987; completion of the southwest Corridor | ||
Haverhill Layover | data-sort-value="Haverhill" | north of | Haverhill Line | layover/storage | 1987; replaced by Bradford Layover | ||
Ipswich Layover | data-sort-value="Ipswich" | south of | Newburyport/Rockport Line | layover/storage | 1998; extension to Newburyport | ||
Lechmere Yard | data-sort-value="Lechmere" | at | Green Line | layover/storage | 2020; relocation of Lechmere station | ||
Sullivan Square Shops | data-sort-value="Sullivan Square" | at | Orange Line and streetcars | maintenance and storage | 1975; completion of the Haymarket North Extension |