The following is a list of the current in service 84 stations and the other planned stations on the Cairo Metro.
Station | Arabic name | Location | Opened |
---|
Station | Arabic name | Location | Opened |
---|
Station | Arabic name | Location | Opened |
---|
The currently in service sections of this line are from Ring Road Station-Adly Mansour Station and from Cairo University Station-Adly Mansour Station.
This line is till under study, construction of the first phase (El Malek El Saleh - Giza) expected to start in early 2016 according to NAT.
There are also plans for other lines including a circular line (Line 5) connecting Lines 1,2,3 and 4 along with the final line (Line 6) which will run from Shubra up-north until the heart of Maadi and Helwan districts in the south through running from Ataba Station (Interchange with both Line 2 and Line 3) through El Kalaa street شارع القلعة in bored tunnels to Salah Eldin Citadel Station (Interchange with Line 4) and moving on from there to both districts via bored tunnels using the existing route El-Mahager Railway as a guide through both Maadi and Helwan.
Both these lines will not take place before finishing both Line 3 and Line 4.