List of Alvar Aalto's works explained

Alvar Aalto (1898–1976) was a Finnish architect, and one of the key figures of modernist architecture during the twentieth century. In addition to architecture, his oeuvre includes furniture, textiles and glassware. A full annotated encyclopedia of his entire works was compiled by his biographer Göran Schildt, Alvar Aalto, A Life's work: Architecture, Design and Art (1994).

Works

Buildings

Year! scope="col"
NameLocationNotes
1917 Park café Exercise while at Institute of Technology
1918 House For his parents
1918–1919 Church and belfry Two separate plans were created with the first being the belfry alone and the second the entire church. The second was not utilized.
1919 Shop renovation Alajärvi Since demolished
1919 Hoisko shop renovation Alajärvi Not carried out
1919 Soldiers' Memorial Alajärvi was the only chosen design.
1919 Youth Association Building Was damaged by fire in the 1970s, but has since been restored.[1]
1919 Municipal granary Training assignment while at the Institute of Technology.
1920 Grand Hotel Adalmina Helsinki Another exercise for school
1920 Soldiers' Memorial No drawings survive
1920? Town hall Jyväskylä Training assignment while at the Institute of Technology
1920? Town hall Competition piece with no surviving drawings
1920's Sick ward for retirement home Jyväskylä Sketches
1920's Sauna Built for Terho Manner (mother's cousin).
1920–1921 Vicarage Drawings are lost
1920–1923 Elementary school Renovation
1921 Helsinki Never completed
1921 Theater Helsinki Kansan Näyttämö Theater
1921–1922 Association of Patriots Building
1922 Industrial Exposition
1922–1923 2-family house
1923 Church Restoration
1923 Finnish Parliament House and restaurant Helsinki Competition project
1923 Gate and fence of the garrison Plans lost[2]
1923 Helsinki Anonymous entry presumed to be Aalto's.
1923–1924 Library wing Helsinki Part of the Parliament House plan
1923–1924 Apartment building
1923–1924? Gravestones Sketches of 20+ tombs and some with pen. Unknown if any were used.
1923–1925 Trade Union Houses and Theater Has been restored
1924 Bandstand Seinäjoki Separate building behind the Defence Corps Building
1924 Petrol station Jyväskylä
1924 Song Festival Jyväskylä Archways, fountains, and a concert stand in Lounaispuisto Park
1924 Church Remodel of the church and furniture for the parish cafeteria.
1924 Church Renovation
1924 Simunamkoski Fishery Never completed
1924–1928 Municipal Hospital Original plan overhauled by building office chief.
1924–1929
1925 Seurahuone Café Jyväskylä Conversion of portion of the Defence Corps building into Café
1925 Café Jyväskylä Renovation of cafè into three shops
1925 Church Pertunmaa Same church as above; however these plans called for an entirely new church to be built.
1925? Church Unknown location located in the drawings for the Defence Corps Building.
1925 Church Competition project[3]
1925 Church Remodel
1925 Public restroom Jyväskylä Lounaipuisto Park
1925 ChurchRestoration
1925 Retirement home Säynäätsalo Two separate sketches
1925–1927 Jyväskylä Unbidden before the contest in 1927, Aalto submitted this plan .
1925–1930 Funeral chapel Two separate plans.
1926 Aino Aalto
1926 2 kiosks Jyväskylä Demolished since
1926 Rauhanyhdistys (Peace Society Building) Jyväskylä
1926 Vicarage Four different entries in the competition
1926 Jyväskylä Savings Bank Jyväskylä Several proposals
1926 Power plant Never completed
1926 Casa Väinö Aalto
1926 Church Remodel
1926 Union Bank Helsinki Competition piece
1926 Town plan Plans no longer in existence
1926–1927 Town plan[4] Sammallahti industrial estate
1926–1927 League of Nations (Palais des Nations) Sketches for a competition only
1926–1927 Majority of Aalto's work was not completed
1926–1928 Church and Bell-Tower Restoration of church and construction of bell tower
1927? Health spa Competition piece that only some early sketches are all that survived.
1927 Service station and newsstand Jyväskylä No longer in existence
1927 Renovation of retirement home Pihlajavesi? Unfinished pencil sketches only
1927 Church Plans did not survive.
1927 Meat inspection building Jyväskylä
1927 Kinkomaa Sanatorium Competition entry
1927 Office block Competition project with Erik Bryggman
1927 Church Competition project
1927 Vicarage Competition project
1927 Church Competition project
1927 Vicarage Competition project
1927 Jyväskylä Competition project
1927 Parish center Jyväskylä Competition
1927 Kangas Paper Mill office Jyväskylä Renovations only
1927–1928 Southwestern Agricultural Cooperative Building Competition winner which also contained a theater, hotel, bank, shops, offices, and flats.
1927–1929 Church
1927–1929 Block of apartments Turku
1927–1935Municipal LibraryCompetition piece
1928 Summer houses Aitta magazine competition
1928 Independence monument Tähtitorninmäki Hill, Helsinki Competition piece
1928 Two separate service station Jyväskylä Both have since been replaced
1928 Competition piece
1928 Suomen Biografi Cinema Aurakatu, Turku Never built
1928 ChurchRestoration with Erik Bryggman
1929 Exposition Building Seventh centenary, with Erik Bryggman.
1929 Choir platform Turku A portion of the 700 year celebration plan
1929 Columbus Memorial Lighthouse Competition project
1929 Church Competition project
1929 Parish center Vallila, Helsinki Competition project
1929 Helsinki Summary sketches only
1929 Tuberculosis Sanatorium Competition piece.
1929 Office Building
1929 Parish center Tehtanpuisto Parish Center, Helsinki Competition piece
1929–1930 G.A. Serlachius building Mänttä Competition piece
1929–1933 Competition piece
Early 1930s Telephone booth Jyväskylä Never built
1930 Institute for Physical Education Competition project
1930 Parish center
1930 Tehtanpuisto Church Helsinki Competition project commemorating Mikael Agricola
1930 Technical museum Part of the G.A. Serlachius headquarters
1930 Water tower Turku Competition piece
1930 Stadium and sports center Helsinki Competition project for the placement of the stadium.
c. 1930 Furniture building Turku Annex to Huonekalu-ja Rakennustyötehdas Oy company's building
1930 Competition piece
1930–1931 Toppila Pulp Mill
1931 Offices at Toppila Pulp Mill Oulu 3 separate plans for new buildings and the chosen plan, which was for renovations
1931 Tomb Professor Usko Nystro
1931 Central University Hospital Competition piece
1931 Helsinki Competition for enlargement.
1931–1932 Crichton-Vulcan shipyard Turku Unknown assignment
1932 Residence of Estonian geographer August Tammekann.
1932 Defence Corps Building Never built
1932 Prefabricated one-family house Competition project
1932 Prototype weekend cabin design Competition project for Enso-Gutzeit
1932 Sauna Paimio For the Tuberculosis Sanatorium's chief physician[5]
1932 Tehtanpuisto Church Second competition for the church.[6]
1932–1933 Employee housing for the Sanatorium
1933 Redevelopment plan Competition project
1933 Töölö, Helsinki Competition project
1933 Helsinki Stadium Helsinki Competition for the first round, where he did not win but was invited to try in the final round.
1933 Helsinki Stadium Helsinki Competition for the final round.
1933 Parish café
1933 Railroad station Helsinki Competition project
1934 Graveyard Malmi, Helsinki Competition piece
1934 Stenius housing development Munkkiniemi, Helsinki Competition piece
1934 Project for the Railroad Station Competition piece
1934 National Exhibition Hall Helsinki Competition project
1934 Main post office Helsinki Competition piece
1934 Corso Theater, Restaurant
1935 Alppiharju open-air theater Lenininpuisto (Lenin Park), Helsinki Probably completed
1935 Tomb Architect Ahto Virtanen
1935 Kalastajatorppa Restaurant Helsinki M.G. Stenius
1935 Alphyddan Restaurant renovation Helsinki Later destroyed in fire
1935 Finnish Legation Building Moscow, Russia Competition piece
1935–1936 Central warehouse and factory Kyläsaari, Helsinki Competition piece for the state alcohol company
1935–1936 House Aalto's House at Munkkiniemi
1936 Workmen's Houses For the Sunila Factory
1936 Association and Club houses Toppila Company
1936 Traffic system Patent office refused to give patent
1936–1937 Bus station Sunila Since replaced
1936–1937 The Savoy Restaurant Renovation and furnishing
1936–1937 City Plan Collaboration
1936–1939 Cellulose Factory Ahlstrom Company
1936–1953 Master plan Plan for the entire industrial community
1937 Garage for workshop Inkeroinen Tampella
1937 Project for Museum of Art Competition piece
1937 Beach facilities Never built
1937 Beach café Mariehamm Part of the beach facilities
1937 Sauna For the works manager along with a boathouse that was not built.
1937 Sauna Kotka For the engineers
1937 Pirtti Cultural Center Kotka Renovation for Sunila
1937 Nordic United Bank
1937 Finnish Pavilion at Expo Competition piece
1937 Sauna complex Main complex of the Ahlström Company
1937–1938 Sauna Kotka Main sauna complex
1937–1938 Director's house Kotka
1937–1945 Master plan Town plan also [7]
1937–1950 Master plan Requested by Tampella industrial group.
1938 Sauna Kotka For the housing area of the heating plant.
1938 Defence Corps Building Jalasjärvi, Härmä Never completed
1938 Master plan Ahlström corporation
1938 Forestry pavilion for the Agricultural Fair
1938 Heating plant Sunila, Kotka Second phase of the heating plants along with a public sauna
1938 Blomberg Film Studio Competition project
1938 Tampella office building Inkeroinen
1938 Storehouse Inkeroinen Pasila Manor
1938 University of Helsinki library extension Helsinki Competition project
1938–1939 Dwellings
1938–1939 Gullichsen House
1938–1939 Ahlström works
1938–1939 Anjala Paper Mill
1938–1939 Elementary school Inkeroinen
1938–1939 Workmen apartments and engineer housing Inkeroinen
1938–1940 Terrace housing
1938–1941 3-story terrace housing Kotka
1939 Sauna Anders Kramer's retreat.
1939 Competition piece
1939–1945 Employee Housing
Undated plans Södra verken plant Avesta Collaborated with Albin Stark
1940 Project for an Experimental House
1940 Sauna For the youth summer camp. Unknown if ever built.
1940–1941 Pumping station Inkeroinen Anjala
1941 Sauna and laundry Inkeroinen Tampella company.
1941 Sauna and laundry Part of the War Veteran's Village
1941 Standard house factory Varkaus Commissioned by Ahlström, but unknown if ever completed as plans have been lost
1941 Head office for Ahlstöm Project was dropped due to the war
1941 Outline plan
1941 Project for a District Competition piece
1941 Plan for an experimental town Project worked on with MIT students
1942 Garage Kauttua Ahlström
1942 Kindergarten Renovation per Ahlström
1942 Sawmill Inkeroinen Tampella
1942 Warehouse extension Varkaus Plans have been lost
1942–1943 Regional Plan for the Valley For the Ahlström company
1942–1943 Women's dormitory Kauttua
1942–1943 Paper cloth mill Kauttua Ahlström
1942–1943 Bleaching plant Varkaus Ahlström
1942–1943 Restaurant and service buildings Helsinki Commissioned by Strömberg
1942–1945 Master plan
1942–1945? Workshop and storehouse Varkaus Built for Ahlström
1942–1949 Community Plan
1942–1951 Shopping Center and Public Baths Created from the entrance to an underground bomb shelter.
1943? Area plan Commissioned by the Ahlström company
1943? Sauna Pihlava, Pori Commissioned by Ahlström.
1943 Sawmill Inkeroinen Tampella
1943 Glassworks renovations Karhula Ahlström
1943 Oulu Competition project, awarded to Bertel Strömmer
1943? Office building Kauttua Missing plans and unknown if ever completed
1943 Invalids' home Hired by Ahlström company. Drawings lost and unknown if ever completed.
1943 Glassworks warehouse Karhula Ahlström
1943–1944 Distillery, pumping station, tanks Varkaus Ahström
1943–1945? Canal bridge Oulu Part of the River Rapids Center
1943–1945River Rapids Center Collaborated with Yrjö Lindegren and Viljo Revell
1943–1947 Master plan commissioned by Strömberg
1943–1949 Gatehouse and office building Helsinki Strömberg
1944 Master plan Competition piece (in collaboration with Albin Stark)
1944 Bus station master plan Sweden Collaborated with Albin Stark
1944 Town center Avesta Albin Stark collaboration
1944 Storehouse Inkeroinen Anjala
1944 Theater and concert hall Avesta A piece of the preceding town plan
1944 Temporary housing Kauttua Ahlström
1944 Town hall Avesta A piece of the preceding town plan
1944 Villa Tvistbo Unbuilt project
1944 Kindergarten Commissioned by Ahlström
1944 Open-air theater and Avesta Hall auditorium Avesta Part of the Johnson Institute plan
1944 Museum Avesta Part of the Johnson Institute plan[8]
Mid 1940s Sauna Inkeroinen Commissioned by Tampella corporation for the works manager, built with revised plans.
1944–1946 Sauna Commissioned by Ahlström
1944–1946 Area plan Neula area, Pitäjänmäki, Helsinki No plans survive
1944–1947 ApartmentsFor the Strömberg
Mid 1940s Soldiers' Tomb Little details known.
1945 Tomb Architect Uno Ulberg
1945 Master plan Plan for Yhteissisu industrial and housing complex
1945 Master plan Iittala community Iittala company
1945 Metal workshop Inkeroinen Anjala
1945 Bridge and street lamps Säynätsalo Part of the master plan
1945 Workshop Jyväskylä Commissioned by Kymin Uittoyhdistys
1945 Master plan Preserved only in sketches.
1945 Town hall Part of the overall town plan
1945 Factory buildings Hedemora, Sweden Collaborated with Albin Stark and I. Norman
1945–1946 Hospital For the Ahlström Company
1945–1946 Cardboard mill expansion Inkeroinen Anjala
1945–1947 Living Quarters and Factory Expansion of the Ahlström Factory
1945–1948 Warehouse, packing plant and expansion Huutoniemi, Vaasa Strömberg
1945–1949 Storage Warehouse Project Glass factory
1945–1949 Sawmill and Director Residence Ahlström Company
1945-late 1950s Town plan Commissioned by the Valvet company.
1946 Sauna At Villa Mairea
1946 Board shed Huutoniemi, Vaasa Strömberg
1946 Transformer Huutoniemi, Vaasa Strömberg
1946 Two-story office wing Inkeroinen Anjala Paper Factory
1946 Plant expansion Inkeroinen Anjala
1946 Conveyor and entrance hall Inkeroinen Anjala
1946 Debarking plant Inkeroinen Anjala
1946 Foundry Varkaus
1946 SaunaAlong with a boathouse.
1946 Exhibition Pavilion Artek Company
1946 Town plan Nynäshamn, Sweden Collaborated with Albin Stark
1946 Heimdal housing development Nynäshamn, Sweden Competition project with Albin Stark
1946 House
1946–1947 Area plan Ruotsinpyhtää area Commissioned by Ahlström
1946–1948 Reconstruction Plan Competition piece, with Yrjö Lindegren, Saarnio, Tavio, and Simberg
1947 Johnson InstituteProject
1947 Work shed Inkeroinen Anjala
1947 Church Brooklyn, New York Plans did not survive.
1947Sauna and laundry Strömberg
1947 Oil warehouse Helsinki Strömberg
1947 Bus station Inkeroinen Tampella
1947 Bus station with ticket booth Karhunkangas, Inkeroinen Tampella
1947 Transformer Huutoniemi, Vaasa Strömberg
1947 Weighing station Huutoniemi, Vaasa Strömberg
1947 Bicycle shelter Huutoniemi, Vaasa Strömberg
1947 Entrance canopy and tank Huutoniemi, Vaasa Strömberg
1947 Drying plant Inkeroinen Later converted into staff facilities
1947–1949 MIT
1947–1948 Fire station and garage Inkeroinen Anjala
1947–1948 Workshop expansion Karhula Collaborated with Gunnar Aspelin for Ahlström
1948 First Project for the Old Age Pension Building Helsinki
1948 Sibelius Concert Hall Helsinki Part of the "First Project for the Old Age Pension Building"
1948 Garage Helsinki for US Embassy
1948 Grave Sketches specifying how to redo his mother's and aunt's grave. (Sally and Wilhelmina Aalto)
1948 Sauna Annex Inkeroinen Commissioned by Tampella.
1948–1949 Glassworks warehouse Karhula Ahlström
1949 Finnish Technical High School
1949 Helsinki Competition project
1949 Bus station Imatra Part of the Town center
1949 Passenger terminal Helsinki Competition
1949
1949 Regional Plan Never built
1949Town Hall and Administration Center Never built
1949 Cultural Center Imatra Never built
1949 Theater Imatra Part of the Imatra Cultural Center
1949 Library Imatra Part of the Imatra Cultural Center
1949 City Plan
1949–1950 Tampella housing
1949–1952 Municipal Buildings and Library Competition piece
1949–1952 Clubhouse Engineering Society at STS
1950 Church and parish center Competition project
1950 Transport stand Säynätsalo Never built
1950 Area plan An extension for the Helsinki University
1950 Kivelä Hospital Helsinki Competition project
1950 Sauna Otaniemi, Espoo For the indoor stadium
1950 Burial Grounds Winner of Competition
1950 Project for a Theater and Cultural Center Never built
1950 Groundwood mill expansion Inkeroinen Anjala
1950 Theater Säynätsalo Part of the "Project for a Theater and Cultural Center"
1950 Indoor Stadium Otaniemi, Espoo Used in the 1952 Olympics
1950–1951 Meesapoltino Addition to the Sunila Factory
1950–1951 Sauna Inkeroinen Commissioned by Tampella
1950–1951 Stadium and Tennis Courts Finnish Technical High School
1950–1951 Paper mill Chandraghona, Bangladesh[9] Aalto only drew small portions of the overall plans.
1950–1952 Project for Shopping Center Island
1950–1952 Pulp mill Inkeroinen Tampella
1950–1953 Factory expansion Oulu Typpi[10]
1950–1955 Regional plan
1951 Library wing Säynätsalo Part of the Town Hall plan
1951 Pumping station Inkeroinen Anjala
1951 Entrance Pavilion (Erottaja)
1951 Sauna Helsinki For the Enso-Gutzeit Country Club
1951 Sauna Otaniemi, Espoo For the university principal
1951 Storehouse Anjala Paper Factory
1951 Warehouse Inkeroinen Tampella
1951 Regional theater Competition project
1951 Workers' housing
1951 Toukola Youth Club Kotka At present it is a kindergarten
1951 House
1951 Sauna Oulu For the Tyypi Oy engineers
1951 Kotka Paper Factory Enso-Gutzeit
1951 Copenhagen Competition piece
1951 Cemetery and funeral chapel Competition piece (2nd place)
1951 Auditorium University of Jyväskylä, Jyväskylä Also used as a concert hall
1951–1952 Sauna For the managers of the Typpi Oy Plant
1951–1952 Sauna and heating plant Oulu For the main housing of the Tyypi Oy complex
1951–1952 Kuopio Theater Won the competition
1951–1953 Heating plant Jyväskylä University of Jyväskylä
1951–1953 Cellulose Factory Enso-Gutzeit plant
1951–1953? Pumping station Summa Enso-Gutzeit
1951–1953 Sports field University of Jyväskylä, Jyväskylä Improved on several occasion
1951–1953 Gymnasium University of Jyväskylä, Jyväskylä For the Teacher Training School
1951–1954 Paper mill
1951–1954 Cellulose Factory Second stage of construction
1951–1954 Three-story apartment house Sunila Third group
1951–1957Area plan Typpitehdas Factory inc. houses for workers and engineers
1951–1970 University of Jyväskylä Jyväskylä Overall plans for the entire grounds
1951–1991 Gymnasium University of Jyväskylä, Jyväskylä Main gymnasium.
1952 Library wing Helsinki Part of the National Pensions Institute Building
1952 Debarking plan Inkeroinen Tampella
1952 Country club for Enso-Gutzeit
1952 Association of Finnish Engineers building Helsinki
1952Sports and congress hall: Vogelweidplatz Competition piece
1952–1953 Workshop of fine mechanics Otaniemi, Espoo Part of the Technical Research Center
1952–1953 Power plant expansion Inkeroinen Anjala Paper Factory
1952–1953 Laboratory of mechanical wood technology Otaniemi, Espoo Part of the Technical Research Center
1952–1954 Sawmill, storehouse, work-hut Otaniemi, Espoo Part of the Technical Research Center
1952–1954House Aalto House
1952–1954 Master plan Aalto was fired in 1954.
1952–1954 Employee Housing Munkkiniemi, Helsinki National Pension Institute
1952–1954 Sports hall
1952–1955 Library University of Jyväskylä Part of his master plan
1952–1956 Theater Helsinki Part of the House of Culture complex
1952–1957 Office Building and Auditorium
1952–1957 Church Vuoksenniska
1952–1957 Church
1953 Paper technology lab Otaniemi, Espoo Part of the Technical Research Center
1953 Acoustics lab Otaniemi, Espoo Part of the Technical Research Center
1953 Lab complex[11] Otaniemi, Espoo Part of the Technical Research Center
1953 Pumping station Otaniemi Technical Research Center
1953 Imatra center design project
1953–1954 Sauna Muuratsalo For Aalto's home
1953–1954 Debarking plant and chipping plant Inkeroinen Anjala Paper Factory
1953–1955 Office Building and Rautatalo Stores Competition piece
1953–1956 Second Project for the Old Age Pension Building Helsinki
1953–1957 Competition piece
1953–1967 Otaniemi, Espoo Main building
1954 Studio R.S.
1954 Personal motoboat Named Nemo Propheta in Patria
1954 Turbine building Enso-Gutzeit
1954 Lab buildings Competition for the Agricultural Institute
1954 Grave Harry Gullichsen
1954 Aero housing Helsinki
1954–1956 Plant expansion Oulu Typpi[12]
1954–1962 Mining laboratory[13] Otaniemi, Espoo Part of the Technical Research Center
1955 Urban design project Summa Commissioned by Enso-Gutzeit
1955 Technical College Project
1955 Theater and Concert Hall Oulu Project
1955 Experimental house Otaniemi, Espoo Part of the Technical Research Center
1955 Concrete technology lab Otaniemi, Espoo Part of the Technical Research Center
1955 Studio house Aalto's house
1955 National Bank of Iraq headquarters Competition project
1955–1956 Gyllenberg Gallery Helsinki Never completed
1955–1956 Warehouse and offices Karhula Ahlström
1955–1957 Houses In the Hansaviertel
1955–1957 City hall Gothenburg, Sweden Competition project
1955–1958 In 1989 it was declared a National Historic Monument.
1955–1958 Parish facilities
1955–1960 Lab for oil and peat technology Otaniemi, Espoo Part of the Technical Research Center
1955–1960 Library Gothenburg, Sweden Part of the Municipal offices
1955–1961 Lab for heat technology Otaniemi, Espoo Part of the Technical Research Center
1955–1964 Master plan Otaniemi, EspooHelsinki University of Technology
1955–1966 Department of Architecture Otaniemi, EspooHelsinki University of Technology
1956 New York Worked with Wallace K. Harrison
1956 Pumping station Otaniemi Technical Research Center
1956 Wood shed Otaniemi Technical Research Center
1956 Drottningtorget, main railway station Competition project
1956 Finnish Pavilion At the Biennale
1956 Port facility Project
1956 Central square Sketched out only with no follow-up
1956 Director's house Typpi Oy, Oulu
1956–1957 Kainula Adult Education Institute
1956–1958 Operating room Paimio Sanatorium
1956–1958 Maison Louis Carré
1956–1960 Heating plant Rovaniemi For the Korkalovaara housing
1957 University master plan
1957 Sauna and garage Oulu For the Tyypi Oy engineers
1957 Kampementsbacken housing development Competition project
1957 Sauna For Ilmari Luostarinen.
1957 Town hall Marl, Germany Competition project
1957 Debarking plant Karhula Ahlström
1957 Town plan Collaborated with Jorma Järvi, with Aalto's portion not chosen.
1957–1958 Café, kiosk, traffic junction For the Pamilo power plant
1957–1959 Church of the Three Crosses
1957–1961 Sundh center
1958 Art museum Baghdad Never completed
1958 Garage Summa Enso-Gutzeit
1958 Library wing Baghdad Part of the Museum plan
1958 Shop buildings and heating plant Summa Enso-Gutzeit
1958 Church Competition piece
1958 Sizing plant Karhula Ahlström
1958 Post and Telegraph Office Never completed
1958 Parish facilities Competition for ideas
1958 High rise apartments
1958 Town hall Competition piece
1958 Korkalovaara housing community
1958 Open-air theater Aalborg Part of the Kunstmuseum (the Art Museum) complex
1958–1959 Munkkiniemi Youth Center Helsinki Never built
1958–1960 Cross of the Plains Church, parish facilities, and vicarage
1958–1963 Plant expansion Oulu Typpi[14]
1958–1964 Opera house Essen, Germany Winner of competition
1958–1972
1959 Bjornholm housing development Helsinki
1959 Town plan
1959 Finnish War Memorial
1959–1960 Lieksakoski power plant Enso-Gutzeit
1959–1960 Garage Summa Enso-Gutzeit
1959–1962
1959–1962 Helsinki
1959–1962 Stephanuskirche
1959–1964 City center project Helsinki Only a portion of the plan was built.
1959–1974 Seinäjoki Original plans: 1959–1965 with 1973–1974 being an annex.
1959–1981 Bus station and traffic arrangements Helsinki
1960 Grave Erik Bryggman
1960 Cinema and stages Leverkusen, Germany Part of his cultural center plan
1960 Library Leverkusen, Germany Part of his cultural center plan
1960–1961 Shopping Center
1960–1961 Area plan Plans have been lost. Commissioned by the Enso-Gutzeit Company.
1960–1962 Power plant Enso-Gutzeit
1960–1963 Thermo-technical Laboratory Otaniemi, EspooHelsinki University of Technology
1960–1963 Wolfsburg, Germany
1960–1964 Main building remodel Otaniemi, EspooHelsinki University of Technology
1960–1965 Helsinki Remodel
1961 Central square Wolfsburg, Germany Competition piece
1961 Administrative and cultural center
1961–1962 Housing for nurses Paimio Sanatorium
1961–1962 Offices and apartments
1961–1969 Museum rooms Rovaniemi Part of the Library
1961–1985 Rovaniemi Part of the administrative and cultural center
1962
1962 Apartments
1962 Fennia and Teollisuusvakuutus Buildings Helsinki Competition
1962 Bus station For the Sanatorium
1962 Traffic arrangements Katajanokka, Helsinki Plan to link Katajanokka Peninsula to the mainland
1962 Competition project
1962 Cultural center Competition project
1962 Terrace housing
1962 Stockmann department store expansion Helsinki Project
1962–1963 Housing development
1962–1963 Heating plant Otaniemi, EspooHelsinki University of Technology
1962–1964 Scandinavia Bank Administration building Helsinki
1962–1966 Student hostel
1963 Urban center Rovaniemi
1963 Swimming hall extension
1963 Student union building Jyväskylä 1974: plans for enlargement (not done) 1979–1981: Renovation
1963 Master plan for the town of Otaniemi Otaniemi
1963 Urban center Never completed
1963–1965 Seinäjoki Part of the community center
1963–1965 Student Association House Västmanland-Dala
1963–1965 Library wingUppsala Part of the Västmanland-Dala Student Association House
1963–1965 Heilig-Geist-Gemeinde Kindergarten Wolfsburg, Germany Project
1963–1966 Parish center Seinäjoki
1963–1967 Shell Oil service station Otaniemi Two plans with the first designed 1963–1964 and the second in 1967
1963–1968 Workshop and office building Otaniemi Technical Research Center
1963–1973 Lab for mechanical wood technology Otaniemi, Espoo Part of the Technical Research Center[15]
1963–1978 Lab for fire-fighting technology Otaniemi, Espoo Part of the Technical Research Center[16]
Mid 1960s Plant enlargement Oulu Typpi Oy[17]
1964 BP Administration building Competition project
1964 Wood Technical Laboratories Otaniemi, EspooHelsinki University of Technology
1964 Sabbagh Center Collaboration with Alfred Roth
1964 Pohjola Insurance building Helsinki competition piece
1964 Paimio Sanatorium extension
1964–1965 One-family house
1964–1965 Institute of International Education
1964–1966 Master plan
1964–1966 Urban design project
1964–1967 Institute Beatenberg, Berner Oberland, Switzerland For the International Designers' and Architects' Foundation
1964–1967 Ekenäs Savings Bank Completed
1964–1969 Library Otaniemi Helsinki University of Technology
1964–1982 Theatre, concert hall, and congress center Jyväskylä Part of the cultural center.[18]
1965 Urban center Castrop-Rauxel, Germany Competition project
1965 Theater Castrop-Rauxel Part of the urban center plan
1965 Town hall Castrop-Rauxel Part of the urban center plan
1965 Family grave Aalto (Father, brother, sister-in-law, stepmother, and aunt)
1965–1968 Scandinavian House
1965–1968 Rovaniemi
1965–1968 Parish center Detmerode, Wolfsburg, Germany
1965–1968 Schönbühl high-rise apartments
1965–1972 Administrative and cultural center Jyväskylä
1965–1974 Sauna part of Villa Oksala
1965–1982 Work continued by his office after his death.
1966 Church Seinäjoki
1966 Experimental town planProject
1966 Suburb plan Project
1966 Concert hall Siena, Italy Project
1966 Theater Wolfsburg, Germany Competition project
1966 Prototype for the administration building and warehouses Turin, Italy Project for the Ferrero SpA
1966–1967 Health center Alajärvi
1966–1967 William Lehtinen Museum Helsinki Never completed
1966–1969 Helsinki
1966–1969 Town hall
1966–1970 Parish center Alajärvi
1966–1971 Cultural Center (theater) Never completed
1966–1971 Library Kokkola Part of the cultural center
1966–1976 Church of Santa Maria Assunta – Riola parish center Riola di Vergato (near Bologna), Italy
1967 House of Finnish Architecture Helsinki Part of the Helsinki Center project
1967 Protestant parish center Altstetten, Zürich, Switzerland Competition project
1967 Added to existing Community Center
1967–1968 Parking garage Otaniemi Helsinki University of Technology
1967–1969 State office buildings Seinäjoki Part of the community center
1967–1970 Library Mount Angel Abbey
1967–1970 Police headquarters Jyväskylä
1967–1971 Institute of Physical Education University of Jyväskylä, Jyväskylä
1967–1973 City Electric Company administration building Helsinki Part of Aalto's Center plan for Helsinki
1968 Library University of Jyväskylä, Jyväskylä Plan was rejected
1968–1971 Water tower Helsinki University of Technology
1969 Kranichstein shopping precinct, cultural center, and residential center Sketches only
1969 Sauna Villa Kokkonen
1969–1970 Villa Göran Schildt
1969–1975 Main building extension Otaniemi Helsinki Technical University
1970 Sauna Villa Skeppet
1970
1970 Museum of Modern Art Project
1970 Police headquarters
1970–1975 Rovaniemi Building contains among other things music school facilities and theatre with three auditoria.
1971 Part of the master plan for central redevelopment
1971–1973 Master plan for central redevelopment Helsinki
1971–1973 Sports field service building Otaniemi Technical Research Center
1972 Master plan for central redevelopment Helsinki Second stage
1973 Original name was Taidemuseo
1973 Halonen Art Museum Never built
1973 Open-air theater Lapinlahti Part of the Halonen Art Museum
1973–1974 Enso-Gutzeit headquarters Helsinki Two alternative proposals for the extension of the building. Never built.
1973–1975 Swimming pool Jyväskylä
1974 Midwest Institute of Scandinavian Culture including Open-air auditorium and Scandinavian LibraryNever built.
1974 Wing of Congress added
1974–1982 Health spa Reykjavík Aalto's office continued to work on it after his death. Never built.
1975 Town hall Jyväskylä Part of the administrative and cultural center
1975–1976 Master plan of the University of Iceland Reykjavík, Iceland After his death his office continued to work on it into the 1980s.
1975–1976 Urban Center including Mosque Auditorium, Museum, Planetarium, and Aquarium Never completed

Notes

Writing and documented speeches

Date! scope="col"
TitleTranslationPublicationLocation
1921 Benvenuto's Christmas Punch Kerberos Helsinki
1921 Nyyperin Aku Aku Neberg Helsinki
1921 A Fireside Story Kerberos Helsinki
1921 Painters and Masons
December 1921 Our Old and New Churches Helsinki
1922 Motifs from Past Ages
1924 The Hilltop Town
December 1924 Urban Culture Jyväskylä
1925 Finnish Church Art
January 1925 Eräs kaupunkimme kaunistustoimenpide ja sen mahdollisuudet A beautifying measure undertaken in our town, and its chances of success Jyväskylä
March 1925 Abbé Coignard's Sermon Jyväskylä
June 1925 Architecture in the Landscape of Central Finland. Jyväskylä
1926 From Doorstep to Living Room
January 1928 The Latest Trends in Architecture Turku
November 1927 An Independence Monument in Helsinki-The Olympic Stadium Turku
October 1928 Modern Architecture and Interior Design of the Home Turku
October 1928 The Rational Cinema Denmark
1929 Armas Lindgren and We (Obituary) Arkkitehti
1930 The Stockholm Exhibition 1930
1930 The Housing Problem Italy
May 1930 The Stockholm Exhibition 1930 Turku
1931 Ein Brief von Finnland A Letter from Finland Germany
1932 Hyvä asunto A Good Home
1932 Bostadsfrågans geografi Geography of the Housing Question
1934 Instead of an Interview
May 1935 Rationalismen och människan Rationalism and Man Sweden
1938 Influence of Structure and Material on Contemporary Architecture Oslo
1939 Maailmannäyttelyt New York World's Fair/Golden Gate Exposition Arkkitehti
1939 The Human Side as a Political Option for the Western World The Human Side
1939 Mairea Arkkitehti
May 1939 The Home of a Rich Collector Yale
October 1939 Finland and Scandinavia Gothenburg, Stockholm
1940 An Experimental Town
1940 Arkkitehti
July 1940 Post-War Reconstruction
November 1940 The Humanizing of Architecture
December 1940
1941 La Ricostruzione del-l'Europa The Reconstruction of Europe Lecture
March 1941 Research for Reconstruction England
April 1941 The Reconstruction of Europe is the Key Problem for the Architecture of our Time Arkkitehti
November 1941 Karelian Architecture
1942 Architecture and Standards
November 1942 Lecture Stockholm
1943 The Oulu River Rapids Center Arkkitehti
March 1943
1945 The Intellectual Background of American Architecture Arkkitehti
November/December 1945 Rovaniemi Restored
1946 Building Height as a Social Issue Arkkitehti
February 1946 Fine Della "Machine à Habiter" End of the "Living Machine"
1947 Kulttuuri ja tekniikka Culture and Technology Finland
February 1947 Constructive Art. Svenska Ab Artek Exhibits Furniture and Paintings
October–December 1947 Architettura e arte concreta Architecture and concrete art Domus, Arkkitehti
1949 Finland as a Model for World Development
1950's My Frank Lloyd Wright
1950
June 1950 Finland Wonderland London
1953 The Decline of Public Architecture Arkkitehti
1953 Experimental House at Muuratsalo Arkkitehti
September 1953 Decadence of Public Buildings
1954 A Few Lines from Alvar Aalto
1954 The Constructive Form Exhibition in Stockholm
1954 Speech São Paulo
Feb/March 1954 Journey to Italy Italy
October 1955 Taide ja Tekniikka Art and Technology
November 1955 Zwischen Humanismus und Materialismus Between Humanism and Materialism
1956 Problems of Architecture as I Understand Them in My Buildings Lecture Italy
1956 Wood as a Building Material
August 1956 Form as a Symbol of Articstic Creativity Oulu
1957 Arkkitehti
1957 The Enemies of Good Architecture London
1957 The Architect's Dream of Paradise Malmö
November 1957 Schöner Wohnen More Beautiful Housing Munich
1958 In Lieu of an Article Arkkitehti
1958 What is Culture? Jyväskylä Lyceum
1959
1960's The Special Character of Nordic Design
January 1962 The International Status of Finnish Art
1963 Aims as SAFA Chairman
October 1963 SpeechMexico City
1965 Arkkitehti
April 1966 Town Planning and Public Buildings
1967 National-International Arkkitehti
1968 Arkkitehti
1970 Die Beziehungen zwischen Architektur, Malerei, und Skulptur Alvar Aalto, Synopsis
1970's The White Table[19]
July 1972 Interview for Finnish Television
December 1972 Speech Helsinki

References

Notes and References

  1. Has changed named from the Youth Association Building to the Defence Corps Building, to the present Club Building.
  2. Gate still standing.
  3. Did not win the competition.
  4. Never completed
  5. The building has since been destroyed.
  6. Aalto never finished the work beyond preliminary sketches.
  7. Major portions of the plan were never built.
  8. There were in actuality three different projects relating to museums with the Johnson Institute: The Bergslagen Mining Museum, the Seafaring Museum, and a group of ships' figureheads, all of which were not finished.
  9. This was originally in Pakistan.
  10. This expansion included a spraying tower, filtration and pumping station, rock crusher, warehouse, nitric acid plant, air purification plant, control room, synthesis plant, labs, gas escape tower, regenerator, desulphuration plant, power station, grinding and drying plant, gasification plant, rail loading platform, workshop, garage, ash incinerator, ammonia filling station, acid flasks, cisterns, recuperator, and a weighing station.
  11. Contained labs for construction technology, construction economy, and bridge technology, along with an auditorium and some smaller labs.
  12. This phase included compound fertilizer plant, and expansions of the rock crusher, warehouses, bagging plant, nitric acid portions, air purification plant, control room, synthesis plant, desulphuration plant, power station, filling station, gasification plant, and workshops. It added new phosphate warehouse, offices, service building, and a gatehouse.
  13. This contained in addition to the mining lab, also a crushing plant, machinery workshops, offices, conference room, and an auditorium.
  14. This expansion repaired damage from an earlier fire to the rock crusher and pumping station, it also expanded the bagging plant, nitric acid plant, calcium nitrate plant, saltpeter plant, air purification plant, synthesis plant, and a workshop. It also added new buildings such as an oil refinery, a warehouse, a paint shop, gas purifier, warehouse tower, service building, oil tank, compressor hall, and a carbon monoxide converter.
  15. Original building was from 1963–1966 with the Annex design occurring from 1969–1973. The annex was never built.
  16. Original building was from 1963–1965 with an annex being added from 1973–1978.
  17. This expansion included expansions of bagging plant, an office building, lab building. It also included a new test factory, new gatehouse, and a new refuse incinerator.
  18. Originally designed with the cultural center in 1964–1966. Aalto reworked the plans after the police headquarters went in. Then in 1972, the plans were reworked again, in response to the town hall. Aalto reworked them one more time before he died, which led to Elissa Aalto redoing them between 1977–1982, before the building was constructed.
  19. Introduction to never completed book.