Line S5 | |
Other Name: | Nanjing–Yangzhou intercity railway Nanjing–Yizheng–Yangzhou intercity railway |
Type: | Rapid Transit |
System: | Nanjing Metro |
Status: | Under construction |
Locale: | Nanjing and Yangzhou, Jiangsu Province |
Stations: | 16 |
Operator: | Nanjing Metro |
Character: | Elevated and underground |
Stock: | 4-car Type A |
Linelength: | 57.611NaN1 |
Map State: | collapsed |
Line S5[1] is a planned rapid transit line connecting Nanjing and Yangzhou. It will be 57.61km (35.8miles) long and have a maximum operating speed of 160km/h.[2] Initially 4 car Type A trains will be used but the line is designed for expansion to 6 car trains in the future. The line will have passing loops at select stations allowing for express and local services to be offered.[3] [4] Local services are expected to take 45 minutes to run end to end and express services will shorten end to end travel times to 34 minutes. Construction started on December 28, 2021.[5] The line is planned to open in 2026.
Station name | Connections | Distance | Location | ||||
---|---|---|---|---|---|---|---|
Qixia, Nanjing | |||||||
Ningzhen ICR | |||||||
Yizheng | Yangzhou | ||||||
Hanjiang | |||||||
YLH | |||||||