Line M101 | |
Type: | Rapid Transit |
System: | Beijing Subway |
Status: | Under construction |
Locale: | Tongzhou district Beijing |
Stations: | 14 |
Planopen: | (planned) |
Operator: | Beijing MTR Corp. Ltd.[1] |
Character: | Underground |
Depot: | Fuhaocun |
Stock: | 3 car Type A, reservations for 3+3 car Type A in the future |
Linelength: | 18.1km (11.2miles) |
Speed: | 100km/h |
Line M101 of the Beijing Subway is a rapid transit line under construction in Tongzhou District, Beijing, China. It will run from Shangwuyuan station to Zhangjiawandong station. It is fully underground. It is scheduled to open in 2027.[2] [3] The line will be in length with 14 stations.[4]
Station name | Connections< | --! colspan="2" rowspan="2" | Distance --> | ||||
---|---|---|---|---|---|---|---|
Tongzhou West Railway Station | (under planning) | ||||||
(under planning) | |||||||
Beijing Sub-Center Railway Station | (U/C) (via Beiyunhedong) | ||||||
(under planning) | |||||||
(under planning) (under planning) | |||||||