Line 9 (Guangzhou Metro) Explained

Box Width:auto
Other Name:M14e (2010 plan name)
M9 (2013 plan name)
Huadu line (Chinese: 花都线)
Type:Rapid transit
System:Guangzhou Metro
Status:Operational
Locale:Baiyun and Huadu districts
Guangzhou, Guangdong
Stations:11
Routes:1
Daily Ridership:135,400 (2017 daily average)[1]
Owner:City of Guangzhou
Operator:Guangzhou Metro Corporation
Linelength:19.21km (11.94miles)
Electrification:Overhead lines, 1,500 V DC
Map State:collapsed
S:广州地铁9号线
T:廣州地鐵9號線
P:Guǎngzhōu Dìtiě Jiǔ Hào Xiàn
Y:Gwóngjāu Deihtit Gáu Houh Sin
Gd:guong2 zeo1 déi6 tid3 yi6 hou6 xin3-->
J:gwong2zau1 dei6tit3 gau2 hou6 sin3
Order:st

Line 9 of the Guangzhou Metro is a rapid transit line running across the Huadu District. It starts at and ends at, interchanging with Line 3 at . The total length is 20.1km (12.5miles) with 11 stations. Line 9's color is pale green. Line 9 was opened for operation on 28 December 2017. [2]

Opening timeline

SegmentCommencementLengthStation(s)Name
Fei'eling — Gaozeng28 December 201719.212NaN210Phase 1
Qingtang30 June 2018Infill station1

Stations

Station
Station nameConnectionsDistance
Location
0.000.00Huadu
2.572.57
Guangzhou North Railway Station2.435.00
1.006.00
1.247.24
1.909.14
1.6010.74
1.4212.16
1.5313.69
2.0715.76
3.4519.21Baiyun

Future expansion

A 4.8km (03miles) extension of line 9 is planned to Forest Park station from Fei'eling station.

Notes and References

  1. http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf
  2. Web site: First-stage of Guangzhou metro line 6 to put into operation by next year . 8 August 2011 . 27 August 2012.