Box Width: | auto |
Other Name: | M14e (2010 plan name) M9 (2013 plan name) Huadu line (Chinese: 花都线) |
Type: | Rapid transit |
System: | Guangzhou Metro |
Status: | Operational |
Locale: | Baiyun and Huadu districts Guangzhou, Guangdong |
Stations: | 11 |
Routes: | 1 |
Daily Ridership: | 135,400 (2017 daily average)[1] |
Owner: | City of Guangzhou |
Operator: | Guangzhou Metro Corporation |
Linelength: | 19.21km (11.94miles) |
Electrification: | Overhead lines, 1,500 V DC |
Map State: | collapsed |
S: | 广州地铁9号线 |
T: | 廣州地鐵9號線 |
P: | Guǎngzhōu Dìtiě Jiǔ Hào Xiàn |
Y: | Gwóngjāu Deihtit Gáu Houh Sin |
Gd: | guong2 zeo1 déi6 tid3 yi6 hou6 xin3--> |
J: | gwong2zau1 dei6tit3 gau2 hou6 sin3 |
Order: | st |
Line 9 of the Guangzhou Metro is a rapid transit line running across the Huadu District. It starts at and ends at, interchanging with Line 3 at . The total length is 20.1km (12.5miles) with 11 stations. Line 9's color is pale green. Line 9 was opened for operation on 28 December 2017. [2]
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Fei'eling — Gaozeng | 28 December 2017 | 19.212NaN2 | 10 | Phase 1 | |
Qingtang | 30 June 2018 | Infill station | 1 |
Station № | Station name | Connections | Distance | Location | ||||
---|---|---|---|---|---|---|---|---|
0.00 | 0.00 | Huadu | ||||||
2.57 | 2.57 | |||||||
Guangzhou North Railway Station | 2.43 | 5.00 | ||||||
1.00 | 6.00 | |||||||
1.24 | 7.24 | |||||||
1.90 | 9.14 | |||||||
1.60 | 10.74 | |||||||
1.42 | 12.16 | |||||||
1.53 | 13.69 | |||||||
2.07 | 15.76 | |||||||
3.45 | 19.21 | Baiyun | ||||||
A 4.8km (03miles) extension of line 9 is planned to Forest Park station from Fei'eling station.