Line 9 (Chengdu Metro) Explained
Chengdu Metro Line 9 is located in Chengdu, Sichuan and forms an extension to the existing Chengdu Metro system. The line officially opened on 18 December 2020.[3]
Line 9 Phase I runs from to and is envisioned to be the second loop line in Chengdu (after Line 7) in the future. Line 9's color is
bright orange.
[4] It is the first ever fully automated ATO GoA 4 metro line in Chengdu.[5]
Line 9 uses high capacity Type A 8-car trains.[6] The 13 stations were designed by London-based Sepanta in collaboration with Chinese architect Jiang & Associates Design.[7]
Progress
- On July 11, 2016, the NDRC approved the third phase of expansion for the Chengdu Metro consisting of Line 6 phase 2 and 3, Line 8, Line 9, Line 10 Phase 2, Line 17 Phase 1 and Line 18.[8]
- 2016-12-29, Sichuan and the Sichuan Development and Reform Commission approved and officially agreed to construct Line 1 Phase 1.[9] The first 4 stations started construction on the same day.[10]
- 2017-11-10, Line 9's first tunnel machine started work at Yuanhua Depot connection.[11]
- 2018-3-17, Line 9's first section (Yuanhua Depot connection) finished tunnel work
- 2018-11-29, Line 9 started track-laying.
- 2019-01-22, first train is finished at CRRC Changchun Railway Vehicles.[12]
- On July 18, 2019, the Wuqing Power Centre project is completed.[13]
- 2019-07-30, Line 9 finished all tunnel work.
- 2020-01-14, as the last section of track is installed between Sanyuan and Jincheng Avenue Stations, completing track installation of Line 9 Phase I.[14]
- 2020-06-10, Chengdu Metro started 3-month trial operation for Line 9 and Line 17.[15]
Stations
Station№ | Station name | Transfer | Distance
| Location |
---|
| |
---|
|
09 01 | | | | -- | 0.000 | Jinjiang |
09 02 | | | | 1.257 | 1.257 | Wuhou |
09 03 | | | | 0.645 | 1.902 |
09 04 | | | | 1.557 | 3.459 |
09 05 | | | | 2.532 | 5.991 |
09 06 | | | | 1.794 | 7.785 |
09 07 | | | | 1.442 | 9.227 |
09 08 | | | | 1.616 | 10.843 |
09 09 | | | | 1.702 | 12.545 |
09 10 | | | | 2.766 | 15.311 |
09 11 | | | | 1.671 | 16.982 |
09 12 | | | | 2.640 | 19.622 | Qingyang |
09 13 | | | | 1.826 | 21.448 |
| |
References
- Web site: 成都地铁五线齐发!成都跻身中国城市轨道交通"第四城". 18 December 2020.
- News: 四川新闻网. 成都地铁9号线今年开工 时速140公里37分钟跑全程. 网易新闻. 2017-03-19. https://web.archive.org/web/20170305010857/http://news.163.com/16/0420/21/BL4IKFH300014AEE.html. 2017-03-05.
- Web site: China's Chengdu Metro opens five new lines in city . Railway Technology . 23 December 2020 . 22 December 2020.
- News: 2020-07-22. 测评!成都地铁的色号,总有一款你会喜欢!. 成都地铁 Chengdu Metro.
- News: 成都地铁9号线将实现自动驾驶 . 腾讯大成网 . 2017-09-28 . 2017-09-28 . zh . 2020-07-26 . https://web.archive.org/web/20200726132745/https://cd.qq.com/a/20170928/027374.htm . dead .
- News: 尹沁彤. 不怕挤 地铁9号线、17号线多两节车厢. 成都商报.
- Web site: Sepanta completes 13 Chinese metro stations . Building Design . 23 December 2020 . 23 December 2020.
- Web site: http://www.ndrc.gov.cn/zcfb/zcfbtz/201607/t20160715_811356.html. zh:关于成都市城市轨道交通第三期建设规划(2016~2020年)的批复(发改基础〔2016〕1493号). www.ndrc.gov.cn. 2018-08-19. https://web.archive.org/web/20190622201415/http://www.ndrc.gov.cn/zcfb/zcfbtz/201607/t20160715_811356.html. 22 June 2019. dead.
- Web site: 成都轨道交通8号线一期工程、9号线一期工程、10号线二期工程可研报告获批. 成都市发展和改革委员会. 2016-12-30. 2016-12-30. zh. https://web.archive.org/web/20170808075355/http://www.cddrc.gov.cn/detail.action?id=850232. 2017-08-08.
- News: 成都地铁8号线一期9号线一期10号线二期正式开工 . 网易 . 2016-12-31 . 2016-12-31 . zh . https://web.archive.org/web/20170808075232/http://news.163.com/16/1231/13/C9KB59T5000187VE.html . 2017-08-08 .
- News: 成都地铁首条无人驾驶线路 9号线一期正线开始掘洞. 四川在线. 2017-11-10 . 2017-11-10 . zh .
- Web site: 厉害!成都首条无人驾驶地铁要来了!全自动无人驾驶列车亮相!. Sohu.
- News: 中铁八局 . zh:成都地铁9号线一期机电系统2标武青主变电所电气安装工程顺利通过验收 .
- News: 成都地铁9号线一期工程长轨通. 中国中铁. 2020-01-24. 2020-07-26. zh.
- Web site: 即将开启空载调试、空载试运行 成都地铁9号线、17号线离开通也近了!.