Line 8 (Zhengzhou Metro) Explained

Type:Rapid transit
System:Zhengzhou Metro
Status:Under construction
Locale:Zhengzhou, Henan, China
Start:Tianjianhu
End:Lumiao
Stations:28 (Phase 1)
Open:Estimated December 2024
Owner:Zhengzhou
Operator:Zhengzhou Metro Group Corporation
Character:Underground
Linelength:51.782NaN2
Tracks:2
Electrification:Overhead lines (1500 volts)
Map State:collapsed

Line 8 of Zhengzhou Metro is a rapid transit line in Zhengzhou that runs in an east - west direction. The line uses four and six car (six car only in the future) Type A trains.[1] The line is estimated to open in December 2024.[2]

Stations

Station
No.
Station nameConnectionsDistance
Location
0801Zhongyuan (Zhengzhou National High and New Technology Industries Development Zone)
0802
0803
0804
0805
0806
0807
0808
0809
0810Jinshui
0811
0812
0813
0814
0815
0816
0817
0818
0819
0820Zhengzhou East Railway Station
ZAF
Zhengzhou BRT Route B5, B6, B7
0821Guancheng
0822
0823Zhongmu
0824
0825
0826
0827
0828

Notes and References

  1. Web site: 郑州市轨道交通8号线一期工程车辆招标项目招标公告. 2021-07-20. 2024-11-30.
  2. Web site: 郑州地铁7、8号线一期票价出炉. 2024-11-10. 2024-11-30.