Type: | Rapid transit |
System: | Suzhou Rail Transit |
Status: | In operation (Moyang to Changlou is postponed, Chunqiulu to Moyang is under construction) |
Start: | Changlou |
End: | Muli |
Stations: | 29 |
Owner: | Suzhou Rail Transit Co., Ltd |
Operator: | Suzhou Rail Transit Co., Ltd |
Linelength: | 35.2 km |
Map State: | collapsed |
Line 7 of Suzhou Rail Transit is north-south rapid transit line in Suzhou. Construction started on December 25, 2019. Changlou - Hongzhuang section starts operation on December 1, 2024, but the operation of Moyang - Changlou section is postponed due to the construction of Suzhou North railway station.
According to the plans, the part of Line 4 between Hongzhuang and Muli stations is operated as part of Line 7.[1] The combined line will be 40.6 km long. In addition, a 4-station, 7.11 km northern extension from Moyang to Chunqiu Road started construction in May 2022, for an opening in 2026.
It has Tian'edang Yard in use for Line 4.[2]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Hongzhuang — Muli | 15 April 2017 | 11.12NaN2 | 7 | Phase 1 south section (taken over from line 4 branch) |
Changlou — Hongzhuang | 1 December 2024[3] | 20 | Phase 1 middle section | |
Moyang — Changlou | TBD | 4 | Phase 1 north section | |
Baidang South | 1 | infill station |
Station name[4] | Connections | Distance | Location | Notes | |||
---|---|---|---|---|---|---|---|
- | 0 | Xiangcheng | Northern extension. Under construction | ||||
- | |||||||
- | Operation postponed | ||||||
SIP | |||||||
Qunli | |||||||
Wuzhong | |||||||
Fleet numbers | Year Built | Time in service | Builder | Class | Number in service | No of car | Assembly | Rolling stock | Number | Depots | Line assigned | Notes | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
396 (66 sets) | 2023-2025 (planned) | N/A | CRRC Nanjing Puzhen | B | Never built | 6 | Tc+Mp+M - M + Mp+Tc | PM227 | 070101-076606 (0701-0766) | None | (planned) | The order scrapped in February 2023. | |
300 (50 sets) | 2023-2025 | 2024-present | CRRC Nanjing Puzhen | B | 132 (22 sets) | 6 | Tc+Mp+M - M + Mp+Tc | PM259 | 070101-075006 (0701-0750) | Tian'Edang Yard Songling Depot Yuanhe Yard | Converted from PM101, PM102 and PM116. |