Line 8 (Guangzhou Metro) Explained

Other Name:M2e ("Chinese: " shape plan name)
M2e / M3e (5 lines plan name)
M4 / M5 (7 lines plan name)
M8 (2000 plan name)
Pazhou line
(Chinese: 琶洲线)
Type:Rapid transit
System:Guangzhou Metro
Status:Operational
Locale:Haizhu, Liwan and Baiyun Districts
Guangzhou, Guangdong
Stations:28
Routes:1
Daily Ridership:645,700 (2017 daily average)[1]
878,000 (2019 Peak)[2]
Owner:City of Guangzhou
Operator:Guangzhou Metro Corporation
Character:Underground
Stock:?? CRRC Zhuzhou Locomotive Metro cars[3]
Linelength:33.91NaN1
Tracks:2
Electrification:Overhead lines, 1,500 V DC
Map State:collapsed
S:广州地铁8号线
T:廣州地鐵8號線
P:Guǎngzhōu Dìtiě Bā Hào Xiàn
Y:Gwóngjāu Deihtit Baat Houh Sin
Gd:guong2 zeo1 déi6 tid3 bad3 hou6 xin3
J:gwong2 zau1 dei6 tit3 baat3 hou6 sin3
Showflag:y
Order:st

Line 8 of the Guangzhou Metro is a north-west L-shaped line on the system that runs from to, spanning a total of 33.9km (21.1miles) with 28 stations. It interchanges with Line 1 at, Line 2 at, Line 3 at, Line 4 at, Line 6 at, and Line 18 at . All stations on Line 8 are underground.[4] Line 8's color is

teal.

Line 8 used to run as part of Line 2 until the extension to both lines opened for trial operation on 25 September 2010, and Changgang to Fenghuang Xincun started operation on 3 November 2010.[5] [6] With the northern extension of Line 8, daily ridership is projected to immediately reach 960,000 passengers per day, growing to 1.33 million per day in the short term and topping 1.65 million per day in the long-term.[7]

History

SegmentCommencementLengthStation(s)Name
Xiaogang — Wanshengwei25 September 201010.82NaN29Line 2 & 8 realignment project
Changgang — Xiaogang25 September 20100.62NaN21
Fenghuang Xincun — Changgang3 November 20104.42NaN23
Cultural Park — Fenghuang Xincun28 December 2019[9] 1.82NaN22
Jiaoxin — Cultural Park26 November 202016.32NaN211Northern extension
Caihongqiao28 September 2022Infill station1
Xicun28 December 2022Infill station1

Stations

ServiceroutesStation
no.
Station nameConnectionsDistance
Location
0.000.00Baiyun
1.661.66
1.833.49
2.005.49

1.356.84
0.797.63
1.148.77
0.859.62
0.8310.45
1.8612.31Liwan
0.9613.27
1.0514.32
0.7615.08
1.0216.10
0.8816.98Haizhu
0.8617.84
0.8318.67
1.0519.72
0.8420.56
0.6721.23

(OSI)

1.1922.42
1.6924.11
1.2425.35
1.4826.83
0.7727.60
1.5729.17
0.9930.16
1.8331.99

Further North Extension

Part of Phase 3 adjustment plan of Guangzhou Metro, now under review by the National Development and Reform Commission as of September 2022.[10] This extension will bring Line further North beyond Jiaoxin Station.[11] The extension will have provisions to be divided into two lines at Jiangfu Station. With the northern section of Line 8 between Jiangfu Station and Guangzhou North Railway Station will be spun off to form the new Line 24.[12] [13]

However, according to the latest environmental impact assessment announcement, Line 24 is used as an extension of Line 8 to announce the line design information. The part to the north of Jiangfu Station is taken as part of the further north extension of Line 8, and the part to the south of Jiangfu Station is taken as the "Subline of the North Extension of Line 8". Even so, the line specifications of these two parts are still configured according to the separate Line 24, because it avoids the need to increase the number of new service lines when it is submitted to the National Development and Reform Commission for approval.[14] [15] [16] [17]

East Extension

Station nameConnectionsLocation
Haizhu
Huangpu
Panyu
Hualong
Lianhua

Notes and References

  1. http://www.gzmtr.com/ygwm/gsgk/qynb/201806/P020180627541408016222.pdf
  2. Web site: http://sn.people.com.cn/n2/2020/0102/c378296-33682040.html . zh:广州地铁刷新单日客流新高 达逾1156万人次. 人民网 . 2020-01-02 . 2020-01-02.
  3. Web site: Guangzhou Metro Line 8 Stock. 10 December 2015.
  4. Web site: Guangzhou Metro. Railway-Technology.com. 14 March 2017.
  5. http://www.canton.com.cn/node/160 404 Not Found
  6. Web site: http://www.gzmtr.com/ttxw/t20100916_228961.htm . zh:广州地铁 . Gzmtr.com . 16 September 2010 . 12 July 2013 . dead . https://web.archive.org/web/20120228232308/http://www.gzmtr.com/ttxw/t20100916_228961.htm . 28 February 2012 .
  7. Web site: 广州力争今年建成两条地铁新线--广东频道--人民网. gd.people.com.cn. 2019-01-23.
  8. Web site: 广州地铁八号线北延段正式开通 同德围"解围"-新华网. https://web.archive.org/web/20201204084348/http://www.gd.xinhuanet.com/newscenter/2020-11/27/c_1126791602.htm. dead. December 4, 2020. 2020-11-27. www.gd.xinhuanet.com. 此次开通的八号线北延段全长16.3公里.
  9. Web site: 八号线凤凰新村至文化公园段明天正式运营. 2019-12-27. https://web.archive.org/web/20191227073223/http://news.dayoo.com/gzrbrmt/201912/27/158562_52998890.htm. 2019-12-27. 凤凰新村至文化公园段长1.8公里,开通后,将连通广州“河南”与沿江路,八号线增加至17.6公里.
  10. Web site: 广州地铁24号线、8号线北延江府段正纳入建设规划调整向国家申报. 2022-09-20. https://archive.today/20221101120718/https://news.dayoo.com/guangzhou/202209/20/139995_54360205.htm. 2022-11-01.
  11. Web site: 今明两年共7条地铁新线动工 快看看有没有经过你家!. cj.sina.com.cn. 2018-01-27.
  12. Web site: 广州8号线北延段拟分为两条线 江府站以南为8号线_房产广州站_腾讯网. gz.house.qq.com. zh-CN. 2018-01-27. 2018-07-12. https://web.archive.org/web/20180712091041/http://gz.house.qq.com/a/20171127/001814.htm. dead.
  13. Web site: 详细页. 2020-08-22. www.gzggzy.cn. 2018-10-15. https://web.archive.org/web/20181015080247/http://www.gzggzy.cn/cms/wz/view/index/layout3/index.jsp?siteId=1&channelId=503&infoId=567632. dead.
  14. Web site: 2022-12-11 . 广州市城市轨道交通8号线北延段工程(滘心~广州北站)社会稳定风险分析公众意见征询公示 . live . https://web.archive.org/web/20221211121021/https://www.gzmtr.com/ygwm/gsgk/gs/202212/t20221211_77305.htm . 2022-12-11 . 广州地铁集团有限公司.
  15. Web site: 2022-12-11 . 广州市城市轨道交通8号线北延段支线工程(江府~纪念堂)社会稳定风险分析公众意见征询公示 . live . https://web.archive.org/web/20221211120958/https://www.gzmtr.com/ygwm/gsgk/gs/202212/t20221211_77306.htm . 2022-12-11 . 广州地铁集团有限公司.
  16. News: 王彤 . 2019-12-10 . 地铁24号线纳入三期调整 争取年内上报国家审批 . 新快报 . https://web.archive.org/web/20221213155408/https://www.xkb.com.cn/article_555503 . 2022-12-13 . live.
  17. Web site: 李天研 . 2022-12-21 . 8号线北延段速度分两档,快速列车可由广州北站直通纪念堂 . live . https://archive.today/20221222040525/https://news.dayoo.com/guangzhou/202212/21/139995_54395823.htm . 2022-12-22 . 广州日报.
  18. Web site: 8号线东延段新版站点揭晓,拟增设龙泽路站 . 2023-03-09.