Line 7 (Zhengzhou Metro) Explained

Type:Rapid transit
System:Zhengzhou Metro
Status:Under construction
Locale:Zhengzhou, Henan, China
Start:Huanghe Bolanguan
End:Nangangliu
Stations:21 (1 under planning)
Open:Estimated December 2024
Owner:Zhengzhou
Operator:Zhengzhou Metro Group Corporation
Character:Underground
Linelength:29.312NaN2
Tracks:2
Electrification:Overhead lines (1500 volts)
Map State:collapsed

Line 7 of Zhengzhou Metro is a rapid transit line in Zhengzhou that runs in a north - south direction. The line uses six car Type A trains.[1] The line is estimated to open in December 2024.[2]

Opening timeline

SegmentCommencementLengthStation(s)Name
Dongzhao - NangangliuEstimated December 202426.91NaN1[3] 20Phase 1
Huanghe Bolanguan - DongzhaoTBD2.51NaN11Northern extension

Stations

Station
No.
Station nameConnectionsDistance
Location
0701Huiji
0702
0703
0704
0705Jinshui
0706
0707
0708
0709
0710
0711
0712Erqi
0713
0714
0715
0716
0717
0718
0719
0720
0721

Notes and References

  1. Web site: 郑州市轨道交通7号线一期工程车辆牵引系统招标项目评标结果. 2021-06-20. 2024-11-30.
  2. Web site: 郑州:地铁7号线一期工程年底前建成通车 - 河南省人民政府. 2024-11-30. www.henan.gov.cn.
  3. Web site: 郑州地铁7、8号线一期票价出炉. 2024-11-10. 2024-11-30.