Line 6 (Shenyang Metro) Explained

Type:Rapid transit
System:Shenyang Metro
Status:Under construction
Locale:Shenyang, Liaoning, China
Stations:30
Routes:1
Owner:Shenyang
Operator:Shenyang Metro Corporation
Character:Underground and elevated
Linelength:35.252NaN2
Tracks:2
Map State:collapsed

Line 6 of the Shenyang Metro is a rapid transit line running from north to south Shenyang. It is the seventh line of the Shenyang Metro to start construction and expected to open in 2026.[1]

History

Construction started on 26 December 2020.

Stations (north to south)

station nameTransferDistance
<
--! rowspan=2 Location-->
0.000.00

Notes and References

  1. Web site: 『沈阳』地铁6号线、1号线东延线开工. 2021-01-10. www.rail-transit.com.