Line 6 (Changsha Metro) Explained

Line 6
Type:Rapid transit
System:Changsha Metro
Locale:Changsha, Hunan, China
Stations:34
Routes:1
Owner:Changsha Government
Operator:Changsha Metro Corporation
Character:Underground
Linelength:48.112NaN2
Tracks:2
Map State:collapsed

Line 6 of the Changsha Metro is a rapid transit line in Changsha, Hunan, China. The line opened on 28 June 2022, running 48.11km (29.89miles) with 34 stations.

History

Construction started on 28 December 2016.[1] Test operations without passengers started in December 2021.[2] Phase 1 of Line 6 opened on 28 June 2022.[3]

Rolling stock

The line is operated using six-car Type A trains manufactured by CRRC Zhuzhou Locomotive, with a capacity for 2592 passengers. The maximum service speed of the trains is 80 km/h.[4]

Stations

SectionStation nameConnectionsDistance
Location
Phase 1
East extension

Notes and References

  1. News: Jiang Jun (Chinese: 蒋俊). http://hunan.voc.com.cn/article/201612/201612281004171502001.html?winzoom=1 . zh:长沙地铁6号线(配套工程)今日开工建设 共设站34座 . hunan.voc.com.cn . 28 December 2016 . 22 December 2021 . zh.
  2. Web site: 长沙市轨道交通集团官网-官宣 长沙地铁7号线一期工程今日正式开工 6号线同步通车试运行. 2021-12-31. www.hncsmtr.com.
  3. News: 2022-06-27 . 拥有多项之“最”头衔的长沙地铁6号线,明天开通初期运营 . 2022-06-28.
  4. Web site: 一车能装2592人,车厢里还能充电!长沙地铁6号线首列车抵达长沙. https://web.archive.org/web/20220727220246/https://hunan.voc.com.cn/article/202109/202109161413094385.html. 2022-07-27. 长沙地铁6号线车辆外观以“蓝色”为主色调,采用6节编组A型车,最大载客量为2592人/列,最高运行速度为80千米/小时.