Type: | Rapid transit |
System: | Ningbo Rail Transit |
Status: | Operational |
Locale: | Ningbo, Zhejiang, China |
Stations: | 22 |
Owner: | Ningbo |
Operator: | Ningbo Rail Transit Co., Ltd. |
Character: | Underground |
Linelength: | 27.92NaN2 |
Tracks: | 2 |
Map State: | collapsed |
Line 5 of Ningbo Rail Transit is a rapid transit line in Ningbo. It starts from west Yinzhou District and ends in Xingzhuang Road Station in Zhenhai District. In the future extension plan, the line will extend and become a loop.[1]
The construction of the first section started on 28 September 2016.[2] The line uses GoA4 fully automated trains.[3] [4] It is in length with 22 stations.[5] The line opened on 28 December 2021.
Line 5 starts from Buzheng Station in western Yinzhou District as an underground line. Then it goes along Yinxian Road and passes the Fenghua River until it reaches Xiaying and turns north. Then the line goes along first Haiyan Road and then Yuanshi Road. Then the line passes the Yong River and reaches its destination, Xingzhuang Road Station.[6]
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Buzheng — Xingzhuang Road | 28 December 2021 | 27.62NaN2 | 22 | Phase 1 | |
Xingzhuang Road — Meiyan | 28 June 2024[7] | 2 | Phase 2 of Line 3 (temporary route) |
Station name | Connections | Location | ||
---|---|---|---|---|
Haishu | ||||
Yinzhou | ||||
Jiangbei | ||||
Zhenhai | ||||
Jiangbei | ||||
Through train to . | ||||