Line 5 (Dalian Metro) Explained

Line 5
Type:Rapid transit
System:Dalian Metro
Status:Operational
Locale:Dalian, Liaoning, China
Stations:18
Owner:Dalian
Operator:Dalian Metro Group Co., Ltd.
Character:Underground
Depot:Houguancun
Linelength:24.4841NaN1[1]
Tracks:2
Map State:collapsed

Line 5 of the Dalian Metro, is a rapid transit line and 6th Metro line in Dalian, Liaoning, China. It runs from the north to the south.[2] [3] The line, with 18 stations, opened on 17 March 2023.

History

Construction of Line 5 started on 30 March 2017.[4] [5]

The trial operation without passengers began on 1 December 2022.[6] [7]

The line opened on 17 March 2023.[8] Labor Park station opened on 6 April 2023.[9]

Stations

Station nameConnectionsDistance
Location
0.000.00Zhongshan
1.121.12
1.322.44
0.853.29
0.864.15
0.915.06
1.176.23
1.107.33
0.567.89Xigang
3.5811.47Ganjingzi
1.0912.56
1.6014.16
0.7214.88
1.7916.67
1.1417.81
1.1818.99
0.9419.93
3.5524.48

Notes and References

  1. Web site: 大连地铁5号线将于3月17日10时38分开通运营.
  2. Web site: 大连轨道交通规划最全信息! . 2023-03-01 . https://web.archive.org/web/20230301043703/https://www.dlmetro.com/subway/subwayShow.do?newsId=d69bdfce6c684d1c9bc1aecd7070000f&columnId=e42a1e01eba8404bbf3caf9c9c553ac3 . 2023-03-01.
  3. Web site: 大连地铁 5号线工程. 2019-08-12.
  4. Web site: 东北地区首条跨海地铁即将正式运营. 2023-03-16.
  5. Web site: 大连地铁5号线开工 共设18座车站 . 2017-04-01. https://web.archive.org/web/20230301043153/http://inews.ifeng.com/50875674/news.shtml . 2023-03-01.
  6. Web site: 今天,地铁5号线空载试运行 . 2022-12-01. 大连发布. https://web.archive.org/web/20230301043228/https://mp.weixin.qq.com/s/a7OHyGgZazVaxLqunTgGdA. 2023-03-01.
  7. Web site: 『大连』地铁5号线空载试运行. 2022-12-01 . https://web.archive.org/web/20230301044308/http://www.rail-transit.com/xinwen/show.php?itemid=24921 . 2023-03-01.
  8. Web site: 大连地铁5号线将于3月17日10时38分开通运营 .
  9. Web site: 2023-04-05 . 地铁5号线劳动公园站明日开通使用 . 2023-04-05 . 地铁5号线劳动公园站将于4月6日开通使用.