Line 5 (Chengdu Metro) Explained
Line 5 of the Chengdu Metro is a rapid transit line in Chengdu. It starts at Huagui Road and ends at Huilong. The total length is 49.0181NaN1.
Line 5's color is
purple. This line began construction on 14 September 2015,
[1] was opened on 27 December 2019, from Huagui Road to Huilong.
Originally, the line was planned to use 6-car Type A rolling stock. However, anticipating high demand as the line will provide relief for the older Line 1 and connect several important business and residential areas, the line was redesigned to allow for expansion to use 8-car Type A rolling stock.[2] This will allow for an ultimate configuration of the line to reach capacities of 64,300 people per hour per direction.[3] [4]
Progress
- 2015
- July 6, Phase 1 & 2 are officially approved.[5]
- In August, all stations started construction.
- 2016
- August 18, first tunnel boring machine started tunneling between and .[6]
- November 3, first tunnel section is finished.[7]
- November 4, to accommodate the projected high demand, Line 5 was redesigned from supporting 6-car A-Type trains to 8-car A-Type trains.[8]
- November 12, topped out, being the first station on the line to do so.[9]
- 2017
- May 25, to is the first to finish all tunnel work.[10]
- December 5, Phase 1 & 2 begins track-laying.[11]
- 2018
- April 17, first trainbody was completed by CRRC Chengdu. It is the first A-type train for Chengdu Metro.[12]
- September 9, tunnel construction is finished.
- November 10, first train for Dafeng Depot arrived.
- November 22, elevated sections finished sound barrier work.
- December 11, Elevated sections finished power-off testing from to .
- December 15, Elevated sections and Dafeng Depot finished testing.
- December 28, Phase 1 & 2 finished track-laying.
- 2019
- October 30, 41 stations are fully functional and finished station testing; all stations are now operating by Chengdu Metro Company.
- November 22, all escalators passed government assessment.
- December 9, Phase 1 & 2 passed safety assessment.
- December 25, Chengdu Metro officially announced Line 5's opening date scheduled for December 27 is the opening time.
- December 27, Phase 1 & 2 started public operation.
- 2020
- August 8, Line 5 trains will have different air conditioning settings in each car. Riders can choose between the center four cars which are set to 27 degrees or the two cars on each end which are set to 25 degrees.[13]
- 2022
- On 16 Feb 2020, in order to fix the noise issue of Line 5, to to sections now limits operational speed of 60 km/h on average, minimizing the noise to environment and neighbourhoods.[14]
Stations
Service routes
| StationNo. | Station name | Transfer | Distance
| Location |
---|
| |
---|
| | |
● | | 05 01 | | | | - | 0.000 | Xindu |
● | | 05 02 | | | | 1.139 | 1.139 |
● | | 05 03 | | | | 0.856 | 1.995 |
● | | 05 04 | | | | 1.983 | 3.978 | Jinniu |
● | | 05 05 | | | | 1.582 | 5.560 |
● | | 05 06 | | | | 0.932 | 6.492 |
● | | 05 07 | | | | 0.766 | 7.258 |
● | | 05 08 | | | | 0.848 | 8.106 | Xindu |
● | ● | 05 09 | | | | 1.711 | 9.817 |
● | ● | 05 10 | | | | 0.816 | 10.633 |
● | ● | 05 11 | | | | 1.123 | 11.756 | Jinniu |
● | ● | 05 12 | | | | 1.299 | 13.055 |
● | ● | 05 13 | | | | 1.038 | 14.093 |
● | ● | 05 14 | | | | 0.769 | 14.862 |
● | ● | 05 15 | | | | 0.921 | 15.783 |
● | ● | 05 16 | | | | 0.765 | 16.548 |
● | ● | 05 17 | | | Chengdu BRT | 0.775 | 17.323 |
● | ● | 05 18 | | | | 1.499 | 18.822 |
● | ● | 05 19 | | | | 0.906 | 19.728 |
● | ● | 05 20 | | | | 0.998 | 20.726 |
● | ● | 05 21 | Chengdu University of TCM &<br />Sichuan Provincial People's Hospital | | | 1.293 | 22.019 | Qingyang |
● | ● | 05 22 | | | | 0.676 | 22.695 |
● | ● | 05 23 | | | | 0.915 | 23.610 |
● | ● | 05 24 | | | | 1.358 | 24.968 | Wuhou |
● | ● | 05 25 | | | | 1.400 | 26.368 | High-Tech Zone |
● | ● | 05 26 | | | | 0.959 | 27.327 |
● | ● | 05 27 | | | Chengdu BRT | 1.599 | 28.926 |
● | ● | 05 28 | | | | 1.811 | 30.737 |
● | ● | 05 29 | | | | 0.662 | 31.399 |
● | ● | 05 30 | | | | 0.851 | 32.250 |
● | ● | 05 31 | | | | 0.858 | 33.108 |
● | ● | 05 32 | | | | 1.334 | 34.442 |
● | ● | 05 33 | | | | 1.503 | 35.945 |
● | ● | 05 34 | | | | 1.027 | 36.972 |
● | ● | 05 35 | | | | 1.722 | 38.694 | Tianfu New Area |
● | ● | 05 36 | | | | 1.449 | 40.143 |
● | ● | 05 37 | | | | 1.479 | 41.622 |
● | | 05 38 | | | | 1.292 | 42.914 |
● | | 05 39 | | | | 2.034 | 44.948 |
● | | 05 40 | | | | 1.649 | 46.597 |
● | | 05 41 | | | | 1.605 | 48.202 |
| | | |
See also
Notes and References
- News: http://city.newssc.org/system/20150521/001649706.htm. zh:成都地铁5号线设41个站 2019年开通运营. Chengdu Metro Line 5 str 41 stations To be opens in 2019. Sichuan News. 21 May 2015. zh. 2015-07-04.
- Web site: http://news.163.com/16/1104/18/C522SS9H000187VE.html . zh:成都地铁5号线将采用“8A”车辆编组 每列车定员2144人_网易新闻 . 163.com news . 2018-07-04 . https://web.archive.org/web/20161113210639/http://news.163.com/16/1104/18/C522SS9H000187VE.html . 2016-11-13 . dead .
- Web site: http://cd.house.ifeng.com/detail/2016_11_06/50927322_0.shtml . zh:成都地铁5号线将进行扩容 运能提高约70% ——凤凰房产成都. cd.house.ifeng.com. 2016-11-20.
- Web site: Sina Visitor System . zh:1号线太挤?“大肚子”5号线救急. 2018-04-18.
- News: 成都地铁5号线一、二期工程获批 工期四年半. 四川新闻网. 2015-07-06 . 2015-07-06 . zh .
- News: 成都最长在建地铁线路5号线 首台盾构下井(图). 凤凰网. 2016-08-19 . 2016-08-19. zh .
- News: 成都地铁5号线一、二期工程首段盾构区间贯通. 网易. 2016-11-03. 2016-11-03. zh. https://web.archive.org/web/20180427184013/http://news.163.com/16/1103/12/C4USE295000187VE.html. 2018-04-27.
- News: 成都地铁5号线将采用"8A"车辆编组 每列车定员2144人. 网易. 2016-11-04. 2016-11-04. zh. https://web.archive.org/web/20161113210639/http://news.163.com/16/1104/18/C522SS9H000187VE.html. 2016-11-13.
- News: 成都地铁5号线一、二期工程首个车站主体结构顺利封顶. 四川在线 . 2016-11-13. 2016-11-13. zh .
- News: 成都地铁5号线科园站-高升桥站间双线贯通 已17站封顶. 四川新闻网. 2017-05-26 . 2017-05-26 . zh .
- News: 成都地铁5号线一二期工程正式开始铺轨(图) . 凤凰网. 2017-12-05 . 2017-12-05. zh .
- News: 首列"成都造"地铁5号线A型铝合金车体下线 . 搜狐. 2018-04-18 . 2018-04-18 . zh .
- News: 怕冷的中间走,怕热的两头去!成都地铁5号线"分区控温"来了 . 四川在线. 2020-08-08 . 2020-08-08 . zh .
- News: 2020-08-07. 关于成都地铁5号线幸福桥至廖家湾地铁噪音问题,已降低列车运行.