Native Name: | 重庆轨道交通5号线 |
Native Name Lang: | zh-cn |
Type: | Rapid transit |
System: | Chongqing Rail Transit |
Status: | Operational |
Locale: | Chongqing, China |
Start: | (North) (South) |
End: | (North) (South) |
Stations: | 31 |
Operator: | Chongqing Rail Transit (Group) Co., Ltd. |
Linelength: | 48.7km (30.3miles) |
Tracks: | 2 |
Linenumber: | 5 |
Electrification: | 1500 V DC overhead line |
Speed: | 120kph (Peak) |
Map Name: | Route map |
Map State: | collapsed |
Line 5 of CRT is a rapid transit line in Chongqing, China, which opened on 28 December 2017.[1]
Phase 1 of the line (from The EXPO Garden Center station to Tiaodeng station) began construction on 3 December 2013.[2]
The north section from The EXPO Garden Center to Dalongshan started operation on 28 December 2017, and it extended to Dashiba on 24 December 2018. The south section from Shiqiaopu to Tiaodeng started operation on 20 January 2021. Due to difficults on bridge building, the central section from Dashiba to Shiqiaopu is opened several years later, on 30 November 2023.
The northern extension of this line began construction on 25 January 2019. The extension is in length with 7 new stations. The extension opened on 27 February 2023.
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
The EXPO Garden Center - Dalongshan | 28 December 2017 | 16.422NaN2[3] | 9 | Phase 1 (North Section) | |
Dalongshan - Dashiba | 24 December 2018 | 1 | |||
Shiqiaopu - Tiaodeng | 20 January 2021 | 18.342NaN2[4] | 12 | Phase 1 (South Section) | |
The EXPO Garden Center - Yuegangbeilu | 27 February 2023[5] [6] | 8.952NaN2[7] | 6 | Northern Extension | |
Dashiba - Shiqiaopu | 30 November 2023[8] | 4.952NaN2 | 3 | Phase 1 (Central Section) |
Service routes | Station № | Station name | Connections | Distance | Location | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Local | |||||||||||
● | - | 0 | bgcolor=#F8F9FA rowspan="16" | Yubei | |||||||
● | 0.94 | 0.94 | |||||||||
● | 1.22 | 2.16 | |||||||||
● | 1.28 | 3.44 | |||||||||
● | 1.27 | 4.71 | |||||||||
● | 0.92 | 5.63 | |||||||||
| | 0.96 | 6.59 | |||||||||
● | ● | 2.35 | 8.94 | ||||||||
● | ● | 1.37 | 10.31 | ||||||||
● | ● | 1.47 | 11.78 | ||||||||
● | ● | 1.49 | 13.27 | ||||||||
● | ● | 2.41 | 15.68 | ||||||||
● | ● | 1.40 | 17.08 | ||||||||
● | ● | 1.94 | 19.02 | ||||||||
● | ● | 2.55 | 21.57 | ||||||||
● | ● | 1.01 | 22.58 | ||||||||
● | ● | 2.47 | 25.05 | Jiangbei | |||||||
● | ● | 0.86 | 25.91 | ||||||||
● | ● | 1.28 | 27.19 | Yuzhong | |||||||
● | ● | 1.66 | 28.85 | bgcolor=#F8F9FA rowspan="4" | Jiulongpo | ||||||
● | ● | ● | 1.56 | 30.41 | |||||||
● | ● | ● | 1.11 | 31.52 | |||||||
● | ● | ● | 1.02 | 32.54 | |||||||
● | ● | ● | 1.81 | 34.35 | Shapingba | ||||||
↑ | Through-service to/from via | ||||||||||
● | ● | ● | ● | Chongqing West | CXW | 2.75 | 37.10 | Shapingba | |||
| | ● | ● | ● | 0.97 | 38.07 | Jiulongpo | |||||
| | ● | ● | ● | 2.02 | 40.09 | ||||||
| | ● | ● | ● | 0.86 | 40.95 | ||||||
| | ● | ● | ● | 1.58 | 42.53 | ||||||
● | ● | ● | ● | 1.91 | 44.44 | ||||||
● | ● | ● | ● | 1.50 | 45.94 | ||||||
● | ● | ● | ● | 2.38 | 48.32 | Dadukou | |||||
↓ | Through-service to/from via | ||||||||||
See main article: Jiangtiao line. Jiangtiao line [9] had been formerly known as the extension of Line 5. The section from Tiaodeng to Shengquansi (in length) opened in August 2022.[10] The section from Shengquansi to Dingshan (in length[11]) is currently under construction.