Line 4 (Foshan Metro) Explained

Line 4
Type:Rapid transit
System:Foshan Metro (FMetro)
Status:Under Construction
Locale:Foshan (Nanhai, Sanshui and Chancheng districts)
Guangdong
Start: (Phase 1)
End: (Phase 1)
Stations:33
Routes:1
Owner:Foshan Metro Group
Character:Underground and elevated
Linelength:55.2NaN (Phase 1)
Tracks:2
Speed:1000NaN0

Line 4 of Foshan Metro (FMetro) is a line under construction in Foshan. The first phase of the line will run in an L-shaped northwest-east direction, connecting Beijiang Dadao in Sanshui District with Gangkou Lu in Nanhai District, with 33 stations and 55.2NaN kilometers of track.[1] [2] Construction started on 15 January 2022.[3] [4] [5]

The line is expected to operate 6 car type B trains with a maximum speed of 100km/h, and will be fully automated and driverless.[6]

Stations (Phase 1)

Station nameConnectionsLocation
Sanshui
Nanhai
FOQ
Chancheng
[7]
Nanhai

Notes and References

  1. Web site: 佛山市城市轨道交通4号线一期线路概况. 2019-05-17. https://www.ditiezu.com/thread-584218-1-1.html.
  2. Web site: 地铁四号线一期真定假. 2023-05-17. 2020-08-15. https://web.archive.org/web/20200815134920/http://www.xinss.com/forum.php?mod=viewthread&tid=1193421. live.
  3. Web site: 佛山地铁4号线一期工程开工建设. 2023-05-17. zh-Hans. 中德工业服务区-佛山三龙湾科技城. 2022-01-17.
  4. Web site: The first phase of Foshan Metro Line 4 starts construction. Seetao. 2023-05-17. 2022-01-17.
  5. Web site: Construction of Foshan Metro Line 4 in full swing. Foshan News. 2023-05-17. 2023-02-17.
  6. Web site: 周龙凤. 权威访谈:佛山市轨道交通局党组书记、局长陈卫东:加快构建高质量多层次轨道交通网络体系. 佛山日报 . 2023-05-17. zh-Hans. 2023-01-21.
  7. Web site: 官方回复4号线季华园站换乘问题. 2022-12-28. 2022-03-21 . https://web.archive.org/web/20220321180649/http://www.ditiezu.com/thread-741279-1-1.html.