Line 4 (Hangzhou Metro) Explained

Type:Rapid transit
System:Hangzhou Metro
Status:Operational
Locale:Hangzhou, Zhejiang, China
Stations:33 (32 in operation)
Daily Ridership:422,800 (2019 Peak)
Owner:City of Hangzhou
Operator:Hangzhou Metro Corporation
Character:Underground
Depot:Qibao Stabling Yard
Gouzhuang Depot
Stock:6 cars, type B
Linelength:46.852NaN2
Tracks:2
Electrification:Overhead line,
Speed:800NaN0
Map State:collapsed

Line 4 of the Hangzhou Metro is a rapid transit line in Hangzhou.

Description

Phase 1

Phase 1 of the line started operation since 2015. Running northeast–southwest, the line connects Hangzhou East railway station, Qianjiang New City and Binjiang District. Part of the line (to Shuicheng Bridge) runs along the north bank of Qiantang River.

Phase 2

The second phase of Line 4 is in length.[1] This extension was opened on 21 February 2022.

Opening timeline

SegmentCommencementLengthStation(s)Name
Pengbu — Jinjiang2 February 20159.6NaN9Phase 1 (initial section)
Xintang28 June 2015Infill station1
Jinjiang — Puyan9 January 201811.2NaN7Phase 1 (final section)
Lianzhuang6 June 2018Infill station1
Pengbu — Chihua Street21 February 202226NaN14Phase 2 (exclude Ducheng Ecopark Station)

Stations

Legend: - Operational - Under construction
Station name[2] ConnectionsDistance
Location
0.000.00Binjiang
0.980.98
0.931.91
1.243.15
2.235.38Shangcheng
1.236.61
1.628.23
1.419.64
1.1010.74
1.3012.04
0.7512.79
0.6513.44
0.9514.39
1.4515.84
1.1516.99
1.2518.24

0.6018.84
1.1019.94
4.4824.42
1.3325.75
1.1926.94
1.7128.65Gongshu
2.1630.81
1.7532.56
1.4634.02
1.3335.35
1.8537.20
1.3938.59
1.3139.90Yuhang
1.3341.23
1.5842.81
2.1945.00
1.7546.75Xihu

See also

Notes and References

  1. Web site: 杭州地铁4号线二期又迎新进展. 2021-04-25.
  2. Web site: 杭州市人民政府关于杭州地铁4号线二期工程、8号线一期工程、9号线一期工程车站站名的批复. 2021-03-11.