Type: | Light rapid transit |
System: | Changchun Rail Transit |
Status: | Operational |
Locale: | Changchun, Jilin, China |
Stations: | 21 |
Routes: | 1 |
Owner: | Changchun |
Operator: | Changchun Rail Transit Corporation |
Character: | elevated and underground |
Depot: | Tiangong Road Depot |
Stock: | Changchun Light Rail 3000 Stock/4000 Stock |
Linelength: | 20.8NaN |
Tracks: | 2 |
Speed: | 70 km/h |
Map State: | collapsed |
Line 4 of the Changchun Rail Transit is a grade separated light rapid transit line in Changchun, running from north to south. Although it uses extended low floor LRVs, the line operates more like a metro, being entirely separate from traffic, similar to the Seville Metro in Spain and U6 of the Vienna U-Bahn.
Line 4 was opened on 30 June 2011. It is currently long with 21 stations.[1] [2] [3]
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Dongdaqiao Bridge — Tiangong Road | 30 June 2011 | 13NaN | 11 | Initial section | |
Changchun Railway Station (North) — Dongdaqiao Bridge | 7 May 2012 | 3.3NaN | 3 | Northern extension | |
Gongping Road | 17 December 2012 | Infill station | 1 | ||
Tiangong Road — Tianxin Road | 6 June 2023 | 4.5NaN | 5 | Southern extension | |
Dongxin Road | 31 December 2023[4] | Infill station | 1 |
Station name | Connections | Distance | Location | |||
---|---|---|---|---|---|---|
~ ~ CCT | 0.00 | 0.00 | Kuancheng | |||
1.25 | 1.25 | |||||
1.60 | 2.85 | |||||
0.60 | 3.45 | Nanguan | ||||
1.25 | 4.70 | Erdao | ||||
1.25 | 5.95 | |||||
1.00 | 6.95 | |||||
0.95 | 7.90 | |||||
0.75 | 8.65 | |||||
0.70 | 9.35 | |||||
0.95 | 10.30 | |||||
1.05 | 11.35 | |||||
0.80 | 12.15 | Nanguan | ||||
South Ring Road | 0.90 | 13.05 | ||||
1.15 | 14.20 | |||||
1.30 | 15.50 | |||||