Line 3 (Xuzhou Metro) Explained

Native Name:徐州地铁3号线
Native Name Lang:zh
Type:Rapid transit
System:Xuzhou Metro
Status:Operational
Locale:Xuzhou, Jiangsu
Stations:22
Character:Underground and Elevated
Stock:Type B (CRRC Nanjing Puzhen)[1]
Linelength Km:26.26
Tracks:2
Speed Km/H:80

Line 3 of the Xuzhou Metro is a rapid transit line in Xuzhou city, Jiangsu province, China. It is the third metro line to open in Xuzhou.

History

Phase 1

Phase 1 of Line 3 was opened on June 28, 2021.[2] [3] It is 18.13 km in length and fully underground.[4] [5]

Phase 2

Phase 2 of Line 3 is opened on 3 December 2024.[6] It will add 6 stations (5 stations in the Northern extension and 1 station in the Southern extension). It is 8.13 km in length (1.57 km South extension and 6.56 km North extension).[7] The South extension is elevated and the North extension is underground.

Stations

Station nameConnectionsDistance
Location
[8] 00Gulou
Yangzhuang
XCHGulou / Yunlong
Yunlong
Quanshan
Tongshan

Notes and References

  1. Web site: Xuzhou Metro’s Line 3 receives first electric train . world-trader.com . 2020-07-30 . 2022-05-27.
  2. Web site: 定了!徐州地铁三号线28号上午开通. 2021-06-24.
  3. Web site: 建设进入新阶段 徐州地铁3号线首台盾构机始发. 2018-01-09.
  4. Web site: 徐州地铁3号线一期通车运营. 2021-07-01.
  5. Web site: 徐州地铁3号线将于6月28日10:58正式开通. 2021-06-24.
  6. Web site: 2 December 2024 . 【官宣】徐州地铁3号线二期12月3日通车运营! .
  7. Web site: 徐州地铁3号线二期通车 运营总里程8.13公里. 2024-12-03. 3号线二期运营总里程8.13公里,其中南段里程1.57公里,设站1座,为银山站;北段里程6.56公里,设站5座.
  8. Web site: 关于徐州市城市轨道交通3号线二期、6号线一期工程车站命名的公告 . 2023-05-03 . https://archive.today/20230503100326/https://mz.xz.gov.cn/govxxgk/014051466/2022-10-19/b973d078-7839-4f50-8d8a-62053463a4e7.html.