Line 3 (Shijiazhuang Metro) Explained
Line 3 of the Shijiazhuang Metro is a rapid transit line in Shijiazhuang. It was officially open on 26 June 2017. The line is currently 26.7 km long with 22 stations.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|
Shierzhong — Shijiazhuangzhan | 26 June 2017 | 6.41NaN1[1] | 6 | Phase 1 (initial section) |
Xisanzhuang — Shierzhong | 20 January 2020 | 5.41NaN1[2] | 4 | Phase 1 (Northern section) |
Shijiazhuangzhan — Lexiang | 6 April 2021 | 14.91NaN1[3] | 12 | Phase 1 (Eastern section) & Phase 2 | |
Stations
Notes and References
- Web site: 2017-06-27 . zh:石家庄地铁开通 河北正式迈入“地铁时代” . http://www.cnr.cn/hebei/jrhb/20170627/t20170627_523821373.shtml . live . https://web.archive.org/web/20170802083342/http://www.cnr.cn/hebei/jrhb/20170627/t20170627_523821373.shtml . 2017-08-02 . 2019-05-27 . CNR . zh.
- News: 2020-01-16 . zh:石家庄地铁3号线一期工程北段将于1月20日开通运营 . zh . http://sjz.hebnews.cn/2020-01/16/content_7665538.htm . live . 2021-11-28 . https://web.archive.org/web/20200119214219/http://sjz.hebnews.cn/2020-01/16/content_7665538.htm . 2020-01-19 . zh:河北新闻网.
- Web site: 2021-04-05 . zh:准备就绪!石家庄地铁3号线明日开通新线14.9公里 . http://heb.hebei.com.cn/system/2021/04/05/100637843.shtml . live . https://archive.today/20210405090902/http://heb.hebei.com.cn/system/2021/04/05/100637843.shtml . 2021-04-05 . 2021-11-28 . zh . zh:长城网.