Line 3 (Qingdao Metro) Explained

Type:Rapid transit
System:Qingdao Metro
Status:In operation
Locale:Qingdao, China
Stations:22
Routes:1
Open: (North section); (South section)
Owner:Government of Qingdao
Operator:Qingdao Metro Corporation
Character:Underground
Stock:Chinese Type B1
Linelength:24.82NaN2
Tracks:2
Map State:collapsed

Line 3 of Qingdao Metro is an underground metro line in Qingdao. The north section began operation on December 16, 2015,[1] and the south section began operation on December 18, 2016.[2]

Opening timeline

SegmentCommencementLengthStation(s)Name
Qingdao North Railway Station — Shuangshan16 December 2015122NaN210Phase 1 (northern section)
Shuangshan — Qingdao Railway Station18 December 201612.82NaN212Phase 1 (southern section)

Stations

station nameConnectionsDistance
Location
QDK0.0000.000Shinan
1.4101.410
1.2782.688
0.8753.563
1.0214.584
1.4966.080
0.7556.835
1.5516.386
0.9179.303
0.77810.081
0.80110.882Shibei
1.38912.271
1.25113.522
0.85114.373
1.46915.842
1.15316.995Licang
1.37618.371
1.31619.687
1.05520.742
0.96621.708
1.22722.935
QHK1.53724.472

Notes and References

  1. News: Qingdao subway system to launch in December. December 14, 2015. December 16, 2015.
  2. News: Qingdao metro Line 3 Phase 2 opens . . December 19, 2016 . October 6, 2020.