Line 3 (Qingdao Metro) Explained

Type:Rapid transit
System:Qingdao Metro
Status:In operation
Locale:Qingdao, China
Stations:22
Routes:1
Open: (North section);
(South section)
Owner:Government of Qingdao
Operator:Qingdao Metro Corporation
Character:Underground
Stock:Chinese Type B1
Linelength:24.82NaN2
Tracks:2
Map State:collapsed

Line 3 of Qingdao Metro is an underground metro line in Qingdao. The north section began operation on December 16, 2015,[1] and the south section began operation on December 18, 2016.[2]

Opening timeline

SegmentCommencementLengthStation(s)Name
Qingdao North Railway Station — Shuangshan16 December 2015122NaN210Phase 1 (northern section)
Shuangshan — Qingdao Railway Station18 December 201612.82NaN212Phase 1 (southern section)

Stations

station nameConnectionsDistance
Location
QDK0.0000.000Shinan
1.4101.410
1.2782.688
0.8753.563
1.0214.584
1.4966.080
0.7556.835
1.5516.386
0.9179.303
0.77810.081Shibei / Shinan
0.80110.882Shibei
1.38912.271
1.25113.522
0.85114.373
1.46915.842Laoshan / Shibei
1.15316.995Laoshan
1.37618.371Licang
1.31619.687
1.05520.742
0.96621.708
1.22722.935
QHK1.53724.472

Notes and References

  1. News: Qingdao subway system to launch in December. December 14, 2015. December 16, 2015.
  2. News: Qingdao metro Line 3 Phase 2 opens . . December 19, 2016 . October 6, 2020.