Line 3 (Hangzhou Metro) Explained

Type:Rapid transit
System:Hangzhou Metro
Status:In operation
Locale:Hangzhou, Zhejiang, China
End: /
Stations:39
Routes:1
Owner:City of Hangzhou
Operator:Hangzhou Metro Corporation
Character:Underground
Depot:Xingqiao Depot
Xiaoheshan Stabling Yard
Cangqian Depot
Stock:6 cars, type AH
Linelength:57.52NaN2[1]
Tracks:2
Electrification:Overhead,
Speed:800NaN0
Map State:collapsed

Line 3 of the Hangzhou Metro is a metro line in Hangzhou.[2] [3] The line is long. It will run in a southwest-northeast direction between Wushanqiancun station in Yuhang District and Xingqiao station in Linping District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The line uses 6-car Type AH rolling stock, which is designed for exclusive use in Hangzhou.[4]

Opening timeline

The initial section of the line, from Xingqiao to Chaowang Road was opened to public on 21 February 2022,[5] and the remaining section from Chaowang Road to West Wenyi Road and the branch from South Xixi Wetland to Shima was opened on 10 June 2022. The Northern extension from West Wenyi Road to Wushanqiancun was opened on 22 September 2022.[6]

SegmentCommencementLengthStation(s)Name
21 February 2022212NaN213Phase 1 initial section[7]
— Chaowang Road10 June 202222.412NaN216Phase 1 remaining section[8]
7.82NaN24
20 July 2022infill station1Phase 1 remaining section
— West Wenyi Road22 September 20224.72NaN2[9] 3Phase 1 adjustment section[10]

Service routes

Stations

Legend: - Operational
- Under construction
Service
routes
Station nameConnectionsDistance
LocationOpening Date
[11] [12]
石马10.71Xihu10 June 2022
小和山1.2511.96
屏峰2.0013.96
留下2.7516.71
吴山前村0.000.00Yuhang22 September 2022
汤家村Unopened
West Railway Station火车西站22 September 2022
[13] 龙舟北路
文一西路7.2010 June 2022
绿汀路2.249.44
创明路1.2710.71Unopened
全丰2.0412.7510 June 2022
高教路1.4114.16
联胜路1.5015.66
洪园1.6217.28
西溪湿地南1.2318.51Xihu
花坞1.6620.17
东岳1.6821.85
古墩路0.8322.68
古荡新村1.2023.88
古荡0.9424.82
黄龙体育中心0.9325.75
黄龙洞1.2326.98
武林门1.4228.4020 July 2022
武林广场1.1429.54Gongshu10 June 2022
西湖文化广场0.8430.38
潮王路1.2631.64Gongshu21 February 2022
香积寺1.6133.25
大关1.0434.29
善贤1.5035.79
新天地街2.0237.81
汽轮广场2.0439.85
华丰路1.7041.55
同协路1.2242.77Shangcheng
桃花湖公园1.3744.14
丁桥1.2845.42
华鹤街2.1147.53
黄鹤山1.3248.85Linping
星桥1.8450.69

See also

Notes and References

  1. Web site: 杭州地铁3号线最新进展:一期工程香积寺路站主体结构封顶 全线预计2021年年底建成. 2019-10-30.
  2. Web site: 杭州地铁3号线一期年底开工. 14 July 2017. ZJNews.
  3. Web site: 工可报告通过评审 地铁3号线一期"上马在即" 预计今年开工,力争亚运会前建成. Hangzhou Daily. 2 March 2017.
  4. Web site: 省发展改革委关于杭州地铁3号线一期工程初步设计的批复. www.zjdpc.gov.cn. 2019-02-08. https://web.archive.org/web/20180210002413/http://www.zjdpc.gov.cn/art/2018/1/12/art_808_1739283.html. 2018-02-10. dead.
  5. Web site: 杭州亚运会倒计时200天:杭州地铁“三线齐开”-中新网. 2022-09-21. www.chinanews.com.cn.
  6. Web site: 明日14时,杭州地铁19号线开通运营!3号线北延段、10号线黄龙体育中心站同步开通-杭州新闻中心-杭州网. hznews.hangzhou.com.cn. 2022-09-21.
  7. Web site: https://archive.today/20220608214553/https://mp.weixin.qq.com/s/MKTCQCq2yCi2DS9w76JL7g. 2022-06-08. 开通400+ 今天上午11点,杭州地铁3、4、10号线,三线齐开.
  8. Web site: 6月10日上午10点,3号线后通段上线!. https://archive.today/20220608212013/https://mp.weixin.qq.com/s/tCzMkeoe8B-20fnC1YTfCg. 2022-06-08.
  9. Web site: 多条轨道交通快速推进!杭州地铁10号线计划年底通车!. 3号线北延段长约4.7公里,设站4座.
  10. Web site: 杭州地铁3号线一期工程调整环境影响评价信息公示. 杭州地铁. 2019-11-01. 2020-01-19. https://web.archive.org/web/20200119101506/http://www.hzmetro.com/notice_show.aspx?ID=9014#midc.
  11. Web site: Photo of official map.
  12. Web site: 杭州市人民政府关于杭州地铁3号线一期工程车站站名及地铁5号线“香积寺路站”更名的批复.
  13. Web site: 杭州市人民政府关于杭州机场轨道快线工程、地铁3号线一期工程及5号线二期工程车站站名的批复. 2022-06-16. https://web.archive.org/web/20220616091121/http://www.hangzhou.gov.cn/art/2022/6/16/art_1229063387_1820979.html. 2022-06-16.