Line 3 (Guiyang Metro) Explained

Native Name:贵阳轨道交通3号线
Type:Rapid transit
System:Guiyang Metro
Status:Operational
Locale:Guiyang, Guizhou Province, China
Stations:29
Operator:Guiyang Urban Rail Transit (GYURT)
Character:Underground
Electrification:1500 V DC with overhead catenary
Depot:Dongfengzhen & Huaxinan
Linelength:43.032NaN2
Tracks:2
Speed:100 km/h
Map State:collapsed

Line 3 of the Guiyang Metro is a rapid transit line in Guiyang, Guizhou, China. It is 43.03km (26.74miles) long and has 29 stations.[1] All stations are located underground.

History

Construction began on 30 December 2018.[2] The line opened on 16 December 2023.[3]

Opening timeline

Stations

station nameConnections<--! colspan="2" rowspan="2" Distance
-->
Location
Huaxi
Huaxi South
Nanming
Yunyan
Wudang
Xintian

Notes and References

  1. News: 2023-02-20 . 贵阳地铁3号线、S1号线一期车站站名征求意见!(附推荐站名) . 贵阳市三江强制隔离戒毒所 . 2023-07-07 . https://web.archive.org/web/20230708085212/https://mp.weixin.qq.com/s?__biz=MzAwODUyNzk0OQ

    &mid=2658949320&idx=3&sn=9719f59a8337b311ac79f622d1722c98&chksm=80e571eab792f8fcbb324615a3a68c6029b40896b5942fb4da81d9d01db33629f7d21891b01b&scene=27

    . 2023-07-08 . live. zh.
  2. News: 2018-12-30 . 贵阳市轨道交通3号线一期工程开工建设 . 贵阳市城市轨道交通集团有限公司 . 2023-07-07 . https://web.archive.org/web/20230406005952/https://www.gyurt.com/system/2019/11/27/030244433.shtml . 2023-04-06 . live. zh.
  3. News: 2023-12-14 . 12月16日14:00!贵阳轨道交通3号线开通初期运营 . 贵阳广播电视台. zh.