Line 30 (Chengdu Metro) Explained
Chengdu Metro Line 30 |
Type: | Rapid transit |
System: | Chengdu Metro |
Status: | Construction |
Locale: | Chengdu, Sichuan |
Stations: | 24 |
Planopen: | 2024 |
Owner: | City of Chengdu |
Operator: | Chengdu Metro Corporation |
Character: | underground and elevated |
Depot: | Gaobeiba Depot (高碑坝车辆段) Hongjiaqiao Depot (洪家桥停车场) |
Linelength: | 27.741NaN1 |
Tracks: | 2 |
Electrification: | overhead lines, 1,500 V DC |
Speed: | 80km/h |
Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is
Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from to . Phase 1 is 27.74 km long with 24 stations, all underground.
[1] Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h.
[2] Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao.
History
- On August 21, 2019, Line 30 is approved officially as part of the fourth phase expansion for the Chengdu Metro by the National Development and Reform Commission, confirming it for 2019–2024's subway construction plan.
- On March 18, 2020, construction started on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.[3]
- On July 17, 2020, Construction officially started for the 4 stations on Line 30 in Longquanyi District.[4]
- In Dec 2022, Phase 1 finished 's water/cable/pipe reroute, marking station's main structure construction enters next stage.[5]
- On Dec 22 2022, Phase 1 finished 's structure construction.[6]
- On 17 Feb 2023, Phase 1 ~ section's left tunnel is finished, marking the completion of the 18th tunnel.[7]
- On 31 March 2023, Phase 1 's Gaobeiba Depot (高碑坝车辆段) is powered on.[8]
- On 11日 September 2023, Phase 1's longest station - finished structure construction, marking the 23rd station to finish structure contraction.[9]
- On 22 September 2023, Phase 1 finished tunnel construction.[10]
Stations
Station name | Transfer | Distance
| Location |
---|
| |
---|
|
| | | 0.00 | 0.00 | Shuangliu |
| | | 2.09 | 2.09 |
| | | 0.81 | 2.90 |
Guangming | | | 0.92 | 3.82 |
| | | 1.31 | 4.13 |
| | | 0.66 | 5.79 |
| | | 1.34 | 7.13 |
| | | 1.99 | 9.12 | High-Tech Zone |
| | | 0.87 | 9.99 |
| | | 1.15 | 11.14 |
| | | 0.84 | 11.98 |
| | | 0.86 | 12.84 |
| | | 0.61 | 13.44 |
| | | 1.25 | 14.69 | Jinjiang |
| | | 1.59 | 16.28 |
| | | 0.99 | 17.27 |
| | | 1.70 | 18.97 |
| | | 0.90 | 19.87 |
| | | 1.01 | 20.87 |
| | | 1.07 | 21.94 | Longquanyi |
| | | 1.37 | 23.31 |
| | | 1.09 | 24.40 |
[11] | | | | |
| | | | |
| |
Notes and References
- News: 轨道交通30号线一期工程. https://web.archive.org/web/20211110203543/https://www.chengdurail.com/detail/7642.html. 2021-11-10. 30号线一期工程,起于双流机场2航站楼站,止于龙泉站。线路全长约27.74km,共设车站24座,全部为地下线.
- News: 成都轨道交通30号线一期工程 首次环境影响评价信息公开. 成都轨道集团官方网站. 2020-02-19.
- Web site: 刚刚!成都地铁8号线二期、27号一期、30号线一期三线开建!_四川在线. 2020-06-14. sichuan.scol.com.cn.
- Web site: 喜!成都地铁30号线龙泉段开始放线 龙泉驿设置4个站点.
- News: 2022-12-21. 成都地铁再上新!首个四线换乘车站揭秘. zh.
- News: 2022-12-21. 「四川全“拼”图」成都地铁30号线娇子立交站顺利封顶. zh.
- News: 2022-12-21. 地铁19号线二期年内试运营!成都轨交建设最新进展. zh.
- Web site:
- 成都轨道交通建设进展# 30号线一期工程高碑坝车辆段110kV铜牧线顺利完成迁改送电。
. weibo.
- Web site: 成都轨道线路最新进展:已有109座车站封顶 盾构累计掘进占总量的89%. zh.
- Web site: 成都地铁30号线一期工程全线洞通. zh.
- Web site: 关于幸福梅林路等29条道路2座桥梁隧道4座轨道交通站点命名更名的公示 . https://archive.today/20221216103156/http://cdmzj.chengdu.gov.cn/cdmzj_gb/c121879/2022-12/13/content_992312f7f2e94e7187104583adaf2721.shtml . 2022-12-16. 2022-12-16.