Type: | Rapid transit |
System: | Wuhan Metro |
Status: | Operating |
Locale: | Wuhan, Hubei |
Stations: | 24 |
Routes: | 1 |
Owner: | Government of Wuhan |
Operator: | Wuhan Metro Group Co., Ltd. |
Character: | Underground |
Stock: | CRRC Changchun Railway Vehicles Chinese Type B |
Linelength: | 33.22NaN2[1] |
Tracks: | 2 |
Map State: | collapsed |
The Line 3 of Wuhan Metro is a metro line in Wuhan. This line crosses five districts of Wuhan: Jiang'an District, Jianghan District, Qiaokou District, Hanyang District and Caidian District (Wuhan Economic-Technological Zone, WEDZ), and is the first line to cross the Han River. It started operation on December 28, 2015.[2] [3]
On February 23, 2012, National Development and Reform Commission approved all construction of Line 3[4] and construction started on March 31.[5] [6] All tunnels of Line 3 were finished on October 8, 2015,[7] and all tracks were finished on October 28, 2015.[8] The line started operation on December 28, 2015.[2]
Station name | Connections | Distance | Location | |||
---|---|---|---|---|---|---|
Auto-city Tram (via Chelun Square) | 0.000 | 0.000 | Hannan | |||
1.449 | 1.449 | Caidian | ||||
0.842 | 2.291 | |||||
1.454 | 3.745 | |||||
1.563 | 5.308 | |||||
0.928 | 6.236 | |||||
1.359 | 7.595 | Hanyang | ||||
0.906 | 8.501 | |||||
1.107 | 9.608 | |||||
2.531 | 12.139 | Qiaokou | ||||
0.982 | 13.121 | |||||
1.825 | 14.946 | Jianghan | ||||
1.227 | 16.173 | |||||
0.885 | 17.058 | |||||
1.676 | 18.734 | |||||
0.932 | 19.666 | Jiang'an | ||||
0.934 | 20.600 | |||||
0.896 | 21.496 | |||||
0.882 | 22.378 | |||||
0.759 | 23.137 | |||||
1.253 | 24.390 | |||||
1.181 | 25.571 | |||||
1.667 | 27.238 | |||||
2.422 | 29.660 | |||||
The first train of Line 3 arrived on March 25, 2015 from CRRC Changchun Railway Vehicles.[10] A further order of 19 six-car sets was made in 2019.[11]