Line 3 (Dalian Metro) Explained

Other Name:R3
Dalian–Jinzhou intercity railway
Type:Rapid transit
System:Dalian Metro
Status:Operational
Locale:Dalian, Liaoning, China
End: /
Stations:18
Routes:2
Owner:Dalian
Operator:Dalian Metro Group Co., Ltd.
Character:Elevated
Linelength:63.452NaN2[1]
Tracks:2
Map State:collapsed

Line 3 of the Dalian Metro (R3;) is a rapid transit line running from southwest to northwest Dalian. It was opened on the 8 November 2002. This line is 63.45km (39.43miles) long with 12 stations.

Line 3 is almost completely at grade or above ground; is elevated, is underground and is at grade. Six stations are elevated, and the remainder are at grade. Transfers to trams and trains are possible at the Dalian Railway Station.

The northern area of the city, where the Economic and Technology Development Zone is located, is not well-served by buses. The metro line beginning at the downtown commercial center (near the Dalian railway station) runs through five administrative districts of the city and serves as an express transport between the northern (developing) region and the downtown area. The line extends northward to Golden Pebble Beach (Jinshitan Scenic Area), a national scenic park 50km (30miles) from the city center.[2] The Jiuli branch route was opened on 28 December 2008. The branch route connects central Dalian with Jinzhou District (金州区) with fourteen stations from south to north. The branch begins at Dalian Development Area station and stretches northwest ending at Jiuli station.

All stations have side platforms. Tracks in the platform area have no ballast (gravel); however, tracks outside the station are on ballast. All stations are covered by a combination of transparent corrugated sheets and a concrete roof.

In October 2017, most station names were re-translated from Pinyin into conventional English.

Since 18 November 2021, operation schedule of the branch section has changed to only Dalian Development Area - Jiuli, branch trains no longer run through Dalian Railway station, to allow testing of trains of line 13, and through trains between line 3 branch and line 13.

Opening timeline

SegmentCommencementLengthStation(s)Name
Dalian Railway Station — Golden Pebble Beach8 November 200249.152NaN212Phases 1 & 2
Dalian Development Area — Jiuli28 December 200814.32NaN26Jiuli branch extension

Service routes

Stations

Service
routes
Station nameConnectionsDistance
Location
DLT0.000.00Xigang
2.502.50
align="center"-align="center"- (planned)bgcolor=#F8F9FA rowspan="5" Ganjingzi
4.406.90
4.2811.18
3.3814.56
6.5621.12
3.5824.70Jinzhou
2.8027.50
2.6330.13
6.0836.21
2.7939.00
9.7048.70
2.2350.93Jinzhou
2.1053.03
1.7054.73
2.1056.83
2.5659.39
2.3761.76
Through service to/from via Line 13

Notes and References

  1. Web site: 你关心的大连地铁建设情况来了. Dalian Metro. 2019-10-20.
  2. Web site: http://www.ccmetro.com/newsite/readnews.aspx?id=57404 . zh:大连:50个地铁车站兼职过街通道 . CCMetro.com . 22 April 2010 . Chinese . dead . https://web.archive.org/web/20150620080035/http://www.ccmetro.com/newsite/readnews.aspx?id=57404 . 20 June 2015 .