Line 2 (Surat Metro) Explained

Green Line
Type:Rapid transit
System:Surat Metro
Status:Under construction
Locale:Surat, Gujarat, India
Start:Bhesan
End:Saroli
Stations:18
Operator:Gujarat Metro Rail Corporation Limited
Character:Elevated
Stock:Titagarh Rail Systems[1]
Linelength:18.74km (11.64miles)
Electrification:750 V DC third rail
Map State:collapsed

Line 2 of Surat Metro also known as The Green Line (Line 2) is an under-construction metro rail line of the Surat Metro, a rapid transit system in Surat, in the state of Gujarat, India.

This line consists of 20 metro stations from Bhesan to Saroli with a total distance of 18.74 km. It is expected to be operational by December 2027.[2] [3]

List of stations

Following is a list of stations on this route:

Green Line
Station NameOpeningConnectionsLayout
EnglishGujarati
1BhesanભેસાણUnder constructionNoneElevated
2Botanical Gardenબોટનિકલ ગાર્ડનUnder constructionNoneElevated
3Ugat Varigruhઉગત વરિગૃહUnder constructionNoneElevated
4Palanpur Roadપાલનપુર રોડUnder constructionNoneElevated
5LP Savani Schoolએલ.પી.સવાણી સ્કૂલUnder constructionNoneElevated
6Performing Art Centreપર્ફોર્મિંગ આર્ટ સેન્ટરUnder constructionNoneElevated
7Adajan Gamઅડાજણ ગામUnder constructionNoneElevated
8Jagdishchandra Bose Aquariumજગદીશચંદ્ર બોસ એક્વેરિયમUnder constructionNoneElevated
9Badri Narayan Templeબદરી નારાયણ મંદિરUnder constructionNoneElevated
10Athwa Chopatiઅઠવા ચોપાટીUnder constructionNoneElevated
11Majura Gateમજુરા ગેટUnder construction (Under construction) Elevated
12Udhna Darwajaઉધના દરવાજાUnder constructionNoneElevated
13Kamela Darwajaકમેલા દરવાજાUnder constructionNoneElevated
14Anjana Farmઅંજના ફાર્મUnder constructionNoneElevated
15Model Townમોડલ ટાઉનUnder constructionNoneElevated
16MagobમગોબUnder constructionNoneElevated
17Bharat Cancer Hospitalભારત કેન્સર હોસ્પિટલUnder constructionNoneElevated
18SaroliસારોલીUnder constructionNoneElevated

See also

Notes and References

  1. Web site: PTI . 2023-06-27 . Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail . 2023-06-27 . ThePrint . en-US.
  2. Web site: Surat Metro phase I to start operations in December 2027 – Check route, distance and stations here. www.financialexpress.com. 13 July 2023. 5 September 2023.
  3. Web site: Surat Metro: Phase I to Start Operations in Dec 2027, Check Route, Distance, Stations and More. www.news18.com. 12 July 2023. 5 September 2023.