Line 2 (Shaoxing Metro) Explained
|
Type: | Rapid transit |
System: | Shaoxing Metro |
Status: | Operational |
Locale: | Shaoxing, Zhejiang, China |
Stations: | 9 |
Operator: | Shaoxing Metro Corporation |
Character: | Underground |
Stock: | 4-car Type B |
Linelength: | 10.55km (06.56miles) |
Speed: | 100km/h |
Line 2 of Shaoxing Metro is a metro line in Shaoxing, China. The line runs in the main urban area, with a total length of 10.55 kilometers and 9 stations.[1]
Line 2 was approved by the State Council in mid-2016 with the first round of the Shaoxing Metro construction plan.[2] Construction started on 1 March 2020, and it was officially opened for operation on 26 July 2023.[3] [4] The line uses B-type trains, with 4-car trains initially and mixed operations of 4 and 6-car trains in the long term.[5]
Stations
Station Name | Connections | Distance
| Location |
---|
| |
---|
|
| | | | | Yuecheng |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| |
Notes and References
- Web site: 绍兴地铁2号线一期工可研、初步设计先后获批 即将开工建设. 中国e车网. 2019-12-24. 2024-03-11. 2019-12-29. https://web.archive.org/web/20191229075901/http://news.ecrrc.com/detail-30-30192.html.
- Web site: 国务院正式批复绍兴城市轨道交通 官方公布路线图. 浙江日报. 2016-06-02. 2024-03-11. 2016-08-12. https://web.archive.org/web/20160812135018/http://zj.zjol.com.cn/news/356761.html.
- Web site: 我市轨道交通2号线一期工程正式开工建设. 2020-03-01. 2024-03-11. 2020-03-03. https://web.archive.org/web/20200303225347/http://www.sxsmtr.cn/index.php?m=content&c=index&a=show&catid=6&id=770.
- News: 绍兴地铁2号线一期7月26日开通运营!. 2023-07-25. 绍兴市轨道交通集团有限公司官方微信公众号. 2024-03-11. 2023-07-25. https://web.archive.org/web/20230725121722/https://mp.weixin.qq.com/s/_fqHGq-8TpDdOcFGAvyi-A.
- Web site: 定了!绍兴地铁2号线一期获批,这些沿线楼盘迎来大利好!. 腾讯网. 2019-12-26. 2024-03-11. 2019-12-29. https://web.archive.org/web/20191229074359/https://new.qq.com/omn/20191226/20191226A0JNCK00.html.