Type: | Rapid transit |
System: | Qingdao Metro |
Status: | In operation |
Locale: | Qingdao, China |
Stations: | 22 |
Routes: | 1 |
Owner: | Government of Qingdao |
Operator: | Qingdao Metro Corporation |
Character: | Underground |
Stock: | Chinese Type B1 |
Linelength: | 24.3872NaN2 |
Tracks: | 2 |
Map State: | collapsed |
Line 2 of Qingdao Metro is an underground metro line in Qingdao.
The eastern section was opened on 10 December 2017 with 18 stations from Zhiquan Road to Licun Park.[1]
The western section from Zhiquan Road station to Taishan Road station opened on 16 December 2019. [2] Haixin Bridge station opened on 30 June 2023.
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Zhiquan Road — Licun Park | 10 December 2017 | 20.4222NaN2 | 18 | Phase 1 (Eastern section) | |
Taishan Road — Zhiquan Road | 16 December 2019 | 4.22NaN2[3] | 3 | Phase 1 (Western section) | |
Haixin Bridge | 30 June 2023 | Infill station | 1 | ||
Sichuan Road (Qingdao Ferry Terminal) — Taishan Road | 2024[4] | 3.842NaN2 | 3 | Phase 1 (Western section extension) |
Station name | Connections | Distance | Location | |||
---|---|---|---|---|---|---|
Shinan | ||||||
bgcolor=#F8F9FA rowspan="6" | Shibei | |||||
0.000 | 0.000 | |||||
1.220 | 1.220 | |||||
0.769 | 1.989 | |||||
1.104 | 3.093 | |||||
0.872 | 3.965 | Shinan | ||||
1.555 | 5.520 | |||||
0.928 | 6.448 | |||||
1.038 | 7.486 | |||||
0.802 | 8.288 | |||||
1.160 | 9.448 | Shinan / Laoshan | ||||
1.156 | 10.604 | Laoshan | ||||
1.005 | 11.609 | |||||
1.225 | 12.834 | |||||
1.547 | 14.381 | |||||
1.043 | 15.424 | |||||
1.496 | 16.920 | |||||
0.815 | 17.735 | |||||
1.483 | 19.218 | |||||
2.255 | 21.473 | Licang | ||||
0.906 | 22.379 | |||||
1.071 | 23.450 | |||||
0.937 | 24.387 | |||||
Hechuan Road | ||||||
Laoshan | ||||||
A 3.842NaN2 extension from Taishan Road station to Sichuan Road (Qingdao Ferry Terminal) station started construction on October 26, 2019.[5] It is expected to open in 2024.