Type: | Rapid transit |
System: | Lanzhou Metro |
Locale: | Lanzhou, Gansu, China |
End: | (Phase 1) |
Stations: | 9 |
Operator: | Lanzhou Rail Transit Co., Ltd. |
Character: | Underground |
Stock: | 6-car Type A |
Linelength: | 9.062NaN2[1] |
Tracks: | 2 |
Speed: | 80 km/h[2] |
Map State: | collapsed |
Line 2 of the Lanzhou Metro is a subway line in Lanzhou running from to, has 9 stations and is 9.06km (05.63miles) long. The Phase 1 entered service on 29 June 2023.[3] An extension is planned to in Anning District.
Line 2 was planned to start construction at the end of 2015.[4] Built in phases, the first phase is 9.061NaN1[1] with 9 stations. It will run from Yanbai Bridge to Dongfanghong Square, all within Chengguan District. The line have 2 transfer stations to Line 1, at Wulipu station and Dongfanghong Square station. The line commenced operations on 29 June 2023.[3]
In December 2017, tunnel boring for the second line commenced. The tunnel will be at depths between 6.3m (20.7feet) and 16.8m (55.1feet).[5]
Station name[6] | Transfer | Distance | Location | ||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
Chinese: 雁白大桥 | 0.00 | 0.00 | Chengguan | ||||
Chinese: 均家滩 | |||||||
Chinese: 张苏滩 | |||||||
Chinese: 五里铺 | |||||||
Chinese: 团结新村 | |||||||
Chinese: 红星巷 | |||||||
Chinese: 兰州火车站 | |||||||
Chinese: 邮电大楼 | |||||||
Chinese: 东方红广场 | 9.06 | ||||||