Line 2 (Guiyang Metro) Explained

Native Name:贵阳轨道交通2号线
Type:Rapid transit
System:Guiyang Metro
Status:Operational
Locale:Guiyang, Guizhou Province, China
Stations:32
Operator:Guiyang Urban Rail Transit (GYURT)
Character:Underground & Elevated
Linelength:40.62NaN2
Tracks:2
Map State:collapsed

Line 2 of the Guiyang Metro is a rapid transit line in Guiyang, Guizhou, China. It is 40.6km (25.2miles) long and has 32 stations.[1]

History

Construction began in September 2015. The line opened on 28 April 2021.[2]

Opening timeline

Stations

station nameConnections<--! colspan="2" rowspan="2" Distance
-->
Location
Baiyun
Guanshanhu
Yunyan
Nanming
KWE
Longdongbao

Notes and References

  1. Web site: 贵阳轨道交通2号线4月28日全线开通运营 . https://web.archive.org/web/20210426113938/http://www.gz.xinhuanet.com/2021-04/26/c_1127378070.htm . dead . 26 April 2021 . Xinhua News . 30 April 2021 . zh. Guiyang Rail Transit will fully open on 28 April.
  2. Web site: 贵阳轨道交通2号线全线开通 真正实现地铁"换乘" . https://web.archive.org/web/20210429053451/http://www.gz.xinhuanet.com/2021-04/29/c_1127390476.htm . dead . 29 April 2021 . Xinhua News . 30 April 2021 . zh . 29 April 2021. Guiyang Rail Transit Line 2 fully opened, metro has achieved "transfer".