Line 2 | |
Other Name: | R2 |
Type: | Rapid transit |
System: | Dongguan Rail Transit |
Status: | In operation |
Locale: | Dongguan, China |
Stations: | 15 (in operation) |
Operator: | Dongguan Rail Transit Corporation, Limited |
Character: | Underground and elevated |
Stock: | 6-car Type B by CRRC Nanjing Puzhen[1] & Bombardier Transportation |
Linelength: | 37.72NaN2 |
Tracks: | 2 |
Speed: | 120 km/h designed, operating maximum 110km/h |
Map State: | collapsed |
Line 2 of the Dongguan Rail Transit is a rapid transit line in Dongguan. The line currently has 15 stations and is 37.743km (23.452miles) long, from Dongguan railway station to Humen railway station. It opened on 27 May 2016. Construction of Line 2 began in 2010.[2] [3]
Station No. | Station name | Connections | Nearby bus stops | Distance | Location | |||
---|---|---|---|---|---|---|---|---|
0.00 | 0.00 | Humen | ||||||
1.94 | 1.94 | Houjie | ||||||
3.19 | 5.13 | |||||||
3.26 | 8.39 | |||||||
2.22 | 10.61 | |||||||
1.61 | 12.22 | Nancheng | ||||||
1.61 | 13.83 | |||||||
1.46 | 15.29 | |||||||
2.35 | 17.64 | Dongcheng | ||||||
2.33 | 19.97 | |||||||
4.82 | 24.79 | Guancheng | ||||||
1.93 | 26.72 | Dongcheng | ||||||
2.39 | 29.11 | |||||||
2.73 | 31.84 | Chashan | ||||||
RTQ | 5.21 | 37.05 | Shilong | |||||
Phase 3 of Line 2 is 17.1 km in length with 9 stations. Construction started in August 2022. It is expected to open in 2027.[4]
Station list[4]