Type: | Rapid transit |
System: | Changchun Rail Transit |
Status: | Operational |
Locale: | Changchun, Jilin, China |
Stations: | 21 |
Routes: | 1 |
Owner: | Changchun |
Operator: | Changchun Rail Transit Corporation |
Character: | Underground |
Linelength: | 24.92NaN2 |
Tracks: | 2 |
Map State: | collapsed |
Line 2 of the Changchun Rail Transit is a rapid transit line running from west to east Changchun.
Phase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations.[1]
The western extension to opened on 8 October 2021. The extension is 4.36 km in length.
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Shuangfeng — Dongfang Square | 30 August 2018 | 20.52NaN2 | 18 | Phase 1 | |
Shuangfeng — Qiche Gongyuan | 8 October 2021[2] | 4.362NaN2[3] | 3 | Western extension |
Station name | Connections | Distance | Location | |||||
---|---|---|---|---|---|---|---|---|
Luyuan | ||||||||
2.18 | 2.18 | |||||||
~ Tram 55 CRT | 1.52 | 3.70 | ||||||
2.09 | 5.79 | |||||||
1.41 | 7.20 | |||||||
1.14 | 8.34 | |||||||
Tram 54 | 0.82 | 9.16 | ||||||
0.86 | 10.02 | |||||||
1.07 | 11.09 | Luyuan / Chaoyang | ||||||
0.80 | 11.89 | Chaoyang | ||||||
0.75 | 12.64 | |||||||
1.36 | 14.00 | Chaoyang / Nanguan | ||||||
0.78 | 14.78 | Nanguan | ||||||
1.12 | 15.90 | |||||||
1.31 | 17.21 | Erdao | ||||||
0.99 | 18.20 | |||||||
1.46 | 19.66 | |||||||
1.27 | 20.93 | Erdao / Nanguan | ||||||
1.38 | 22.31 | Erdao | ||||||