Line 2 (Changchun Rail Transit) Explained

Type:Rapid transit
System:Changchun Rail Transit
Status:Operational
Locale:Changchun, Jilin, China
Stations:21
Routes:1
Owner:Changchun
Operator:Changchun Rail Transit Corporation
Character:Underground
Linelength:24.92NaN2
Tracks:2
Map State:collapsed

Line 2 of the Changchun Rail Transit is a rapid transit line running from west to east Changchun.

History

Phase 1

Phase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations.[1]

Western extension

The western extension to opened on 8 October 2021. The extension is 4.36 km in length.

Opening timeline

SegmentCommencementLengthStation(s)Name
Shuangfeng — Dongfang Square30 August 201820.52NaN218Phase 1
Shuangfeng — Qiche Gongyuan8 October 2021[2] 4.362NaN2[3] 3Western extension

Service routes

Stations

Station nameConnectionsDistance
Location
Luyuan
2.182.18

~
Tram 55 CRT
1.523.70
2.095.79
1.417.20
1.148.34
Tram 540.829.16
0.8610.02
1.0711.09Luyuan / Chaoyang
0.8011.89Chaoyang
0.7512.64
1.3614.00Chaoyang / Nanguan
0.7814.78Nanguan
1.1215.90
1.3117.21Erdao
0.9918.20
1.4619.66
1.2720.93Erdao / Nanguan
1.3822.31Erdao

Future Development

Eastern extensionAn eastern extension to Zhaojiagang East is under construction. The extension is 10.607 km in length.[4] It's scheduled to open in 2025.

Notes and References

  1. News: 2018-08-30 . zh:长春地铁进入换乘时代 2号线8月30日通车 . zh . http://m.xinhuanet.com/jl/2018-08/30/c_1123352712.htm . live . 2019-10-07 . https://web.archive.org/web/20191007055559/http://m.xinhuanet.com/jl/2018-08/30/c_1123352712.htm . 2019-10-07 . zh:新华网吉林.
  2. News: 2021-10-07 . zh:10月8日8时 长春轨道交通2号线西延线将开通运营 . zh . http://jl.sina.com.cn/news/yaowen/2021-10-07/detail-iktzscyx8279598.shtml . live . 2021-11-28 . https://web.archive.org/web/20211007071929/http://jl.sina.com.cn/news/yaowen/2021-10-07/detail-iktzscyx8279598.shtml . 2021-10-07 . 2号线运营里程增长4.4公里,达到24.9公里 . zh:新浪吉林.
  3. News: 2021-04-07 . zh:长春地铁2号线西延线预计今年年末开通 . zh . http://www.jl.chinanews.com/shms/2021-04-07/155372.html . live . 2021-08-08 . https://web.archive.org/web/20210808005857/http://www.jl.chinanews.com/shms/2021-04-07/155372.html . 2021-08-08 . 线路全长4.36km,共设车站3座,均为地下站 . zh:中国新闻网.
  4. Web site: 2019-11-27 . zh:长春地铁2号线东延工程项目正式开工 . http://www.sohu.com/a/356714178_120118599/ . live . https://web.archive.org/web/20210204073848/https://www.sohu.com/a/356714178_120118599/ . 2021-02-04 . 2019-11-27 . zh . zh:搜狐 . .