Type: | Rapid transit |
System: | Chengdu Metro |
Status: | Under construction |
Locale: | Chengdu, Sichuan |
Stations: | 23 |
Routes: | 1 |
Owner: | Chengdu |
Operator: | Chengdu Metro Limited |
Character: | Underground/Elevated |
Linelength: | 24.862NaN2 |
Tracks: | 2 |
Map State: | collapsed |
Chengdu Metro Line 27 is a Chengdu Metro line under construction in Chengdu, Sichuan, China. It is a tangential line that runs diagonally from the west to the north of Chengdu. The train uses 6 car B-type trains. Line 27's colour is light blue.
On 21 August 2019, the National Development and Reform Commission approved the 4th stage of development plan from Chengdu Rail Transit, which includes Line 27.
The first phase will be from Xindu District Shifo station to Qingyang District Shuxin Road station. The line is 24.86km long with 23 stations. From the north, the line has a 7.52km long elevated section with 6 stations, followed by a 17.34km underground section with 17 stations. Phase 1 started construction on 2020-5-18, and is planned to open by 2024.[1] [2]
There are 7.52km that are on ground with 6 stations; and a 17.34km underground tunnel with 17 stations. Phase 1 has 9 interchange stations[7]
Phase | Station name | Station Type | Transfer | District | |||
---|---|---|---|---|---|---|---|
Alignment | Platform Configuration | ||||||
Phase 1 | 石佛 | Elevated | Island | Xindu | |||
慈义 | |||||||
兴城大道 | |||||||
旃檀寺 | |||||||
石门坎 | Jinniu | ||||||
三圣寺 | |||||||
范家巷 | Underground | ||||||
鲤鱼湾 | |||||||
白仁店 | |||||||
赖家店 | |||||||
韦家碾 | |||||||
双水碾 | Chenghua | ||||||
王贾桥 | Jinniu | ||||||
洞子口 | |||||||
沙河源 | |||||||
新桥 | |||||||
金府 | |||||||
花照壁北 | |||||||
金牛公园 | |||||||
羊犀立交 | |||||||
黄忠 | |||||||
金沙滨河公园 | Qingyang | ||||||
蜀鑫路 | |||||||