Other Name: | M21 (plan name) Eastern New Town express line |
Type: | Rapid transit |
System: | Guangzhou Metro |
Status: | Operational |
Stations: | 20 |
Routes: | 2 |
Owner: | City of Guangzhou |
Operator: | Guangzhou Metro Corporation |
Linelength: | 60.3km (37.5miles)[1] |
Electrification: | Third rail, 1,500 V DC (Overhead lines with same voltage installed in depot) |
Speed: | 1200NaN0 |
Map State: | collapsed |
S: | 广州地铁21号线 |
T: | 廣州地鐵21號線 |
P: | Guǎngzhōu Dìtiě Èrshíyīhàoxiàn |
Y: | Gwóngjāu Deihtit Ershiuyat Houh Sin--> |
Gd: | guong2 zeo1 déi6 tid3 Er6 Shop2 Yat1 hou6 xin3--> |
J: | gwong2 zau1 dei6 tit3 ji6 sap6 jat1 hou6 sin3 |
Order: | st |
Line 21 of the Guangzhou Metro is a rapid transit rail line in Guangzhou.
Line 21 is an express suburban metro line along with Line 14. Both lines were envisioned to connect and promote development in the northeast regions of Guangzhou. Line 21's unique role means that it has many design features that make it different from other Guangzhou metro lines. For example, several stations have passing loops to allow for express and local stopping patterns and trains reach a maximum service speed of 120km/h. These considerations allow for passengers to travel from outer Guangzhou to the city center in one hour.[2] Line 21 runs from in Tianhe to in Zengcheng.[3] The line is about 60.3km (37.5miles) long. The line has 38.8km (24.1miles) of underground sections, 6.8km (04.2miles) of mountain base tunneling and 14.7km (09.1miles) on viaducts.[4] The line has a total of 20 stations, of which 16 are underground and 4 are elevated.
The eastern section of Line 21 opened on December 28, 2018[5] and the western section opened on December 20, 2019.
Since October 2, 2024, the section from Tianhe Park to Yuancun was removed from Line 21, and once renovation is complete, will transfer to Line 11. Cross Platform transfer will be provided at Tianhe Park station after reopening.
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Zhenlongxi — Zengcheng Square | 28 December 2018 | 26.21NaN1 | 9 | Eastern section | |
Yuancun — Zhenlongxi | 20 December 2019[6] | 35.31NaN1[7] | 12 | Western section | |
Yuancun — Tianhe Park (closed) | 2 October 2024[8] | -1.371NaN1 | -1 | Converting to Line 11 section per initial design |
There are 2 types of train services offered on the metro line 21:
R | L | Station № | Station name | Connections | Distance | Location | ||||
---|---|---|---|---|---|---|---|---|---|---|
● | ● | | 0 | 0 | Tianhe | |||||
● | ● | 3.41 | 3.41 | |||||||
● | ● | JSQ | 2.13 | 5.54 | ||||||
| | ● | 1.16 | 6.70 | |||||||
● | ● | 2.08 | 8.78 | |||||||
● | ● | 3.27 | 12.05 | Huangpu | ||||||
| | ● | Science City | 1.99 | 14.04 | ||||||
● | ● | 2.45 | 16.49 | |||||||
● | ● | | 2.31 | 18.80 | ||||||
| | ● | 3.00 | 21.80 | |||||||
| | ● | 6.27 | 28.07 | |||||||
| | ● | 5.94 | 34.01 | |||||||
● | ● | 2.17 | 36.18 | |||||||
| | ● | 2.12 | 38.30 | Zengcheng | ||||||
| | ● | 3.59 | 41.89 | |||||||
● | ● | 2.54 | 44.43 | |||||||
| | ● | 3.24 | 47.67 | |||||||
| | ● | 4.46 | 52.13 | |||||||
| | ● | 4.95 | 57.08 | |||||||
● | ● | 2.95 | 60.03 | |||||||